:New Jersey Route 19

{{Short description|State highway in Passaic County, New Jersey, US}}

{{about|the current New Jersey Route 19|the Route 19 that existed from 1939 to 1948|New Jersey Route 19 (pre-1948)|the Route 19 that existed before 1927|U.S. Route 9 in New Jersey}}

{{Use American English|date=April 2025}}

{{Use mdy dates|date=January 2025}}

{{Infobox road

|state=NJ

|type=NJ

|route=19

|alternate_name=Paterson Peripheral

|length_mi=3.04

|length_ref={{cite web|publisher=New Jersey Department of Transportation|url=http://www.state.nj.us/transportation/refdata/sldiag/pdf/00000019__-.pdf|title=Route 19 straight line diagram|access-date=March 17, 2020}}

|maint=NJDOT and Passaic County

|map={{maplink-road}}

|map_custom=yes

|direction_a=South

|terminus_a={{jct|state=NJ|GSP||US|46|CR|509}} in Clifton

|junction={{jct|state=NJ|I|80}} in Paterson

|direction_b=North

|terminus_b={{jct|state=NJ|CR|509}} in Paterson

|established=1988

|counties=Passaic

|previous_type=NJ-old

|previous_route=18N

|next_type=NJ

|next_route=20

}}

Route 19 is a state highway in Passaic County, New Jersey, United States. Also referred to as the Paterson Peripheral, it runs {{convert|3.04|mi|km|2|abbr=on}} from an intersection with County Route 509 (CR 509, Broad Street) and CR 609 (Colfax Avenue) in Clifton north to another intersection with CR 509 (Main Street) in downtown Paterson. Between U.S. Route 46 (US 46) in Clifton and Interstate 80 (I-80) in Paterson, Route 19 is a freeway. The main purpose of the route is to connect the Garden State Parkway to I-80 and downtown Paterson. The road was originally proposed as the Paterson spur of the Garden State Parkway that was to run north to Wayne. In 1959, it was planned to become part of the Paterson Peripheral, an extension of Route 20 from downtown Paterson. By 1971, the road was completed between the Garden State Parkway and I-80, at which time it received the Route 20 designation; the rest was cancelled in 1978 due to feared community disruption. In 1988, this portion of Route 20 became Route 19 as it did not connect with the other segment of the route. In the 1990s, Route 19 was extended to Main Street in downtown Paterson as part of a project that also completed the interchange with I-80.

Route description

File:2018-07-24 12 40 40 View north along New Jersey State Route 19 and Passaic County Route 509 (Broad Street) just north of U.S. Route 46 in Clifton, Passaic County, New Jersey.jpg

Route 19 begins at the intersection of CR 509 (Broad Street) and CR 609 (Colfax Avenue) in Clifton. From this intersection, it heads north concurrent with CR 509 as a four-lane freeway, soon interchanging with US 46.{{google maps |url=https://maps.google.com/maps?f=d&source=s_d&saddr=broad+street+and+colfax+avenue+clifton,+nj&daddr=route+19+and+main+street+paterson,+nj&geocode=&hl=en&mra=ls&sll=40.873578,-74.171748&sspn=0.014343,0.027466&ie=UTF8&t=h&z=13|title=overview of New Jersey Route 19 |access-date=2009-06-17}} Past US 46, the road crosses a brook and CR 509 (Broad Street) splits off, with Route 19 interchanging with the Garden State Parkway. Route 19 continues past the Garden State Parkway as a six-lane freeway surrounded by trees, coming to a northbound exit and southbound entrance with CR 509.

File:2020-09-25 13 15 49 View south along New Jersey State Route 19 (Paterson Peripheral) at the exit for Interstate 80 EAST (George Washington Bridge, New York) in Paterson, Passaic County, New Jersey.jpg

Past this interchange, the road heads into Paterson. Here, the route has a southbound exit and northbound entrance with CR 621 (Valley Road) before becoming an eight-lane freeway and passing to the east of Garret Mountain Reservation. After interchanging with I-80, Route 19 continues north as a five-lane freeway, with three northbound lanes and two southbound lanes, to an interchange with CR 638 (Grand Street). From here, the route becomes a four-lane arterial road and heads into urbanized areas of downtown Paterson. The route turns east and becomes a county-maintained surface road at the intersection with Marshall Street and continues to its northern terminus at the intersection of CR 509 (Main Street) and Ward Street.

History

File:2021-08-25 13 36 15 View north along New Jersey State Route 19 (Paterson Peripheral) from the overpass for Passaic County Route 621 (Valley Road) in Paterson, Passaic County, New Jersey.jpg

What is now Route 19 was once planned as the Paterson spur of the Garden State Parkway, which was to run through Paterson and Haledon to CR 504 in Wayne. The planned Paterson spur would become an extension of Route 20 in 1959.State of New Jersey, Laws of 1959, Chapter 4. This road, which was to be a six-lane, $58 million freeway called the Paterson Peripheral, was to run from Clifton north to the existing Route 20 in downtown Paterson.{{cite book|title=Public Hearing for Proposed Extension of Route 20|publisher=New Jersey State Highway Department|date=December 21, 1961}} This road was completed between the Garden State Parkway and Valley Road by 1969 and north to I-80 in 1975.

{{cite web|url=http://www.state.nj.us/transportation/refdata/sldiag/00000019__-.pdf |title=Route 19 Straight Line Diagram|work=Internet Archives WayBack Machine|publisher=New Jersey Department of Transportation|year=2006|access-date=September 10, 2013|archive-url = https://web.archive.org/web/20060317104624/http://www.state.nj.us/transportation/refdata/sldiag/00000019__-.pdf|archive-date = March 17, 2006}}{{cite map|publisher=Chevron Oil Company|title= Map of New Jersey |year=1969|cartography=H.M. Gousha}} Upon completion, this road received the Route 20 designation. The extension to Route 20 through Paterson was stopped in 1971 because of the designation of the Great Falls Historic District, a historical district recognizing Paterson’s heritage as an industrial center. By the 1990s, this portion of Route 20 was redesignated Route 19 as it did not connect with the mainline of the route.{{cite map|publisher=State Farm Insurance|title= State Farm Road Atlas |year=1983|cartography=Rand McNally}}{{cite map|publisher=Rand McNally|title=United States-Canada-Mexico Road Atlas|year=1996}} In 1992, a project to complete the interchange with I-80 and extend the route to Main Street in downtown Paterson to ease congestion was finished. This interchange received the Prize Bridge Award in the category of Grade Separation from the American Institute of Steel Construction in 1996.{{cite magazine |date=October 1996 |title=1996 Prize Bridge Award: Grade Separation - Route 19-Interstate 80 Interchange |work=Modern Steel Construction |publisher=American Institute of Steel Construction |url=https://www.aisc.org/globalassets/modern-steel/archives/1996/10/1996v10_route_19_interstate_80.pdf |archive-url=https://web.archive.org/web/20190501040645/https://www.aisc.org/globalassets/modern-steel/archives/1996/10/1996v10_route_19_interstate_80.pdf |archive-date=2019-05-01 |url-status=live |format=PDF}}

Major intersections

{{jcttop|state=NJ|county=Passaic|length_ref=}}

{{NJint

|type=concur

|location=Clifton

|lspan=6

|mile=0.00

|road={{jct|state=NJ|CR|509|dir1=south|name1=Broad Street}}

|notes=Continuation south; southern end of CR 509 concurrency

}}

{{NJint

|type=incomplete

|mile=0.13

|mspan=2

|road={{jct|state=NJ|US|46|dir1=east}}

|notes=No southbound exit

}}

{{NJint

|type=incomplete

|mile=none

|road={{jct|state=NJ|US|46|dir1=west|city1=Dover}}

|notes=Southbound exit and northbound entrance

}}

{{NJint

|type=concur

|mile=0.46

|road={{jct|state=NJ|CR|509|dir1=north|name1=Broad Street}}

|notes=Northbound exit and southbound entrance; northern end of CR 509 concurrency

}}

{{NJint

|type=incomplete

|mile=0.50

|road={{jct|state=NJ|GSP||dir1=south}}

|notes=Southbound exit and northbound entrance; exit 155A on G.S. Parkway

}}

{{NJint

|type=incomplete

|mile=1.15

|road={{jctname|state=NJ|CR|509|noshield1=yes|name1=Broad Street|city1=Clifton}}

|notes=Northbound exit and southbound entrance

}}

{{NJint

|type=incomplete

|location=Paterson

|lspan=6

|mile=1.50

|road={{jctname|state=NJ|CR|601|county1=Passaic|noshield1=yes|name1=Main Street|CR|621|county2=Passaic|noshield2=yes|name2=Valley Road|city1=Clifton}}

|notes=Southbound exit and northbound entrance

}}

{{NJint

|type=incomplete

|mile=2.46

|road={{jct|state=NJ|I|80|city1=Delaware Water Gap|location2=George Washington Bridge|location3=New York}}

|notes=No southbound access to I-80 west; exits 57A-B on I-80

}}

{{NJint

|type=incomplete

|mile=2.71

|road={{jctname|state=NJ|CR|638|county1=Passaic|noshield1=yes|name1=Grand Street}}

|notes=Northbound exit and southbound entrance

}}

{{NJint

|type=incomplete

|mile=2.84

|mspan=2

|road={{jct|state=NJ|I|80|dir1=west|road|Spruce Street}}

|notes=Southbound exit and entrance; access via Oliver Street

}}

{{jctbridge

|mile=none

|bridge=Northern end of freeway section

}}

{{NJint

|mile=3.04

|road={{jct|state=NJ|CR|509|name1=Main Street}}

|notes=Northern terminus

}}

{{jctbtm|col=5|keys=incomplete,concur}}

See also

  • {{Portal-inline|U.S. Roads}}
  • {{Portal-inline|New Jersey}}

References

{{Reflist}}