:Ohio State Route 822

{{Short description|State highway in Jefferson County, Ohio, US}}

{{Use mdy dates|date=January 2025}}

{{good article}}

{{Infobox road

|state=OH

|type=SR

|route=822

|alternate_name=University Boulevard{{cite web |url=http://www.dot.state.oh.us/Divisions/Planning/SPPM/SystemsPlanning/Functional%20Class%20by%20County/Jefferson.pdf |title=Technical Services Functional Classification of State and Local Roads - District 11 - Jefferson County |author=Ohio Department of Transportation |author-link=Ohio Department of Transportation |access-date=October 21, 2013 |archive-url=https://web.archive.org/web/20131023061540/http://www.dot.state.oh.us/Divisions/Planning/SPPM/SystemsPlanning/Functional%20Class%20by%20County/Jefferson.pdf |archive-date=October 23, 2013 |url-status=dead }}

|map=OH 822 map.svg

|map_notes=Current route of SR 822 in solid red, former sections in dashed red

|length_mi=0.13

|length_round=2

|length_ref={{cite web |url=http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/DESTAPECnty/DESJEF.pdf |title=Technical Services DESTAPE |author=Ohio Department of Transportation |access-date=October 20, 2013 |archive-date=January 7, 2014 |archive-url=https://web.archive.org/web/20140107152848/http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/DESTAPECnty/DESJEF.pdf |url-status=dead }}

|established=1990

|direction_a=West

|terminus_a=7th Street in Steubenville

|junction={{Jct|state=OH|US|22}} in Steubenville

|direction_b=East

|terminus_b={{Jct|state=OH|SR|7}} in Steubenville

|counties=Jefferson

|previous_type=SR

|previous_route=821

|next_type=SR

|next_route=823

}}

State Route 822 (SR 822) is an unsigned east–west state highway in the eastern portion of the U.S. state of Ohio. The short route was designated in 1990. Its western terminus is at the intersection of 7th Street and the on-/off-ramps for U.S. Route 22 (US 22), where it serves as a connection between the U.S. Route and SR 7, the route's eastern terminus. The whole route is in Steubenville, after multiple truncations due to the demolition of Fort Steuben Bridge.

Route description

File:Steubenville, Ohio, Fort Steuben Bridge.jpg

SR 822 starts at 7th Street on University Boulevard, where it immediately meets US 22 east at an interchange with on-/off-ramps. SR 822 then passes through 6th Street, before ending at SR 7 at a T-intersection, which later becomes concurrent with US 22. SR 822 has open fields and ramps north of it, and businesses south of it.{{Bing maps|url=http://www.bing.com/maps/?v=2&cp=40.374391~-80.612832&lvl=18&dir=0&sty=r&rtp=pos.40.373661_-80.613572_near%20N%207th%20St%2C%20Steubenville%2C%20OH%2043952___e_~pos.40.375188_-80.612011_near%20OH-7%20S%20%26%20University%20Blvd%2C%20Steubenville%2C%20OH%2043952___a_&mode=D&rtop=0~0~0~&form=LMLTCC|title=Ohio State Route 822|access-date=October 24, 2013}}

Around 11,580 vehicles use the route on average each day.{{cite web |url=http://tims.dot.state.oh.us/TIMS/Map/MapViewer |title=Transportation Information Mapping System |author=Staff |publisher=Ohio Department of Transportation |access-date=October 22, 2013 |archive-url=https://web.archive.org/web/20130916101641/http://tims.dot.state.oh.us/TIMS/Map/MapViewer |archive-date=September 16, 2013 |url-status=dead }}

History

{{Further|Fort Steuben Bridge}}

SR 822 was designated in 1990 as US 22's alignment was moved to the Veterans Memorial Bridge from Fort Steuben Bridge.{{cite web|title=Demolition of the Fort Steuben Bridge - Planning and Preliminary Study Report|url=http://www.dot.state.oh.us/districts/D11/Lists/Fort%20Steuben%20Documents/Attachments/12/ft_steubenprelimreport.pdf|publisher=Ohio Department of Transportation|access-date=November 14, 2013|archive-date=February 3, 2015|archive-url=https://web.archive.org/web/20150203225148/http://www.dot.state.oh.us/districts/D11/Lists/Fort%20Steuben%20Documents/Attachments/12/ft_steubenprelimreport.pdf|url-status=dead}}{{cite news|last=Hicks|first=Ian|title=Down in a Blaze of Glory: Fort Steuben Bridge is No More|url=http://www.news-register.net/page/content.detail/id/566161/Down-in-a-Blaze-of-Glory--Fort-Steuben-Bridge-is-No-More.html?nav=515|access-date=October 23, 2013|newspaper=The Intelligencer & Wheeling News Register|date=February 21, 2012|archive-date=October 29, 2013|archive-url=https://web.archive.org/web/20131029200336/http://www.news-register.net/page/content.detail/id/566161/Down-in-a-Blaze-of-Glory--Fort-Steuben-Bridge-is-No-More.html?nav=515|url-status=dead}}{{cite map|title=Ohio State Map|year=1989|publisher=Ohio Department of Transportation|url=http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/StateMaps/otm1989a.sid|access-date=October 23, 2013|archive-date=October 11, 2013|archive-url=https://web.archive.org/web/20131011213507/http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/StateMaps/otm1989a.sid|url-status=dead}}{{cite map|title=Ohio State Map|year=1992|publisher=Ohio Department of Transportation|url=http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/StateMaps/otm1992a.sid|access-date=October 23, 2013|archive-date=February 3, 2015|archive-url=https://web.archive.org/web/20150203225323/http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/StateMaps/otm1992a.sid|url-status=dead}} Traffic began to drop as the structure of the bridge deteriorated, and the weight limit was lowered in 2004.{{cite news|last=Scott|first=Warren|title=Blast topples Fort Steuben Bridge|url=http://www.heraldstaronline.com/page/content.detail/id/570539/Blast-topples-Fort-Steuben-Bridge.html?nav=5010|access-date=October 23, 2013|newspaper=The Herald-Star|date=February 21, 2012|archive-date=April 11, 2012|archive-url=https://web.archive.org/web/20120411095715/http://heraldstaronline.com/page/content.detail/id/570539/Blast-topples-Fort-Steuben-Bridge.html?nav=5010|url-status=dead}}{{cite news|last=Scott|first=Warren|title=Fort Steuben Bridge Demolition Begins|url=http://www.news-register.net/page/content.detail/id/564282/Fort-Steuben-Bridge-Demolition-Begins.html?nav=510|access-date=October 26, 2013|newspaper=The Intelligencer & Wheeling News Register|date=January 12, 2012|archive-date=October 29, 2013|archive-url=https://web.archive.org/web/20131029200334/http://www.news-register.net/page/content.detail/id/564282/Fort-Steuben-Bridge-Demolition-Begins.html?nav=510|url-status=dead}} The Fort Steuben Bridge was closed in 2009, a few years after plans of closure and demolition were announced. It was closed due to deteriorating conditions and limited use.{{Cite press release|first=Becky|last=McCarty|url=http://www.dot.state.oh.us/districts/D11/newsreleases/Pages/0115092.aspx|publisher=Ohio Department of Transportation|access-date=October 23, 2013|title=Fort Steuben Bridge Will Remain Closed|date=January 15, 2009|archive-date=October 29, 2013|archive-url=https://web.archive.org/web/20131029192438/http://www.dot.state.oh.us/districts/D11/newsreleases/Pages/0115092.aspx|url-status=dead}} The Ohio Department of Transportation (ODOT) created a temporary eastern terminus for the route at the north end of the SR 7/822 concurrency, where the bridge approach ramps began.{{cite web |url=http://www.odotonline.org/techservapps/traffmonit/TMReports/TSR_Report/County_Reports/2010_Reports/jef10.pdf |title=Traffic Survey Report, Jefferson County, 2010 |author=Ohio Department of Transportation |access-date=February 22, 2012 |archive-url=https://web.archive.org/web/20131027064512/http://www.odotonline.org/techservapps/traffmonit/TMReports/TSR_Report/County_Reports/2010_Reports/jef10.pdf |archive-date=October 27, 2013 |url-status=dead }} The eastern terminus was changed to the south end of the SR 7/822 concurrency in 2013.

Major intersections

{{OHinttop|length_ref={{cite web |url=http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/SLD/pdf_files/JEFSR0822R.pdf |title=Technical Services Straight Line Diagrams |author=Ohio Department of Transportation |access-date=April 30, 2010 |archive-url=https://web.archive.org/web/20140819013847/http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Documents/SLD/pdf_files/JEFSR0822R.pdf |archive-date=August 19, 2014 }}}}

{{OHint

|location=Steubenville

|lspan=4

|county=Jefferson

|cspan=4

|road=7th Street / University Boulevard

|mile=0.00

}}

{{OHint

|road={{Jct|state=OH|US|22|dir1=east|location1=Pittsburgh, PA}}

|mile=0.01

|mile2=0.06

|type=incomplete

|notes=Access to only US 22 eastbound, with on-/off-ramps; access westbound via SR 7

}}

{{OHint

|road={{Jct|state=OH|SR|7|to2=OH|US|22|dir2=west|city1=Mingo Junction|city2=Toronto}}

|mile=0.13

|type=

|notes=Current eastern terminus

}}

{{OHint

|road={{Jct|state=OH|SR|7}}

|mile=0.27

|type=closed

|notes=Eastern terminus from 2010–2013

}}

{{jctbridge

|river=Ohio River

|rspan=

|type=closed

|mile=0.39

|mile2=0.70

|bridge=Fort Steuben Bridge

|bspan=

}}

{{WVint

|road={{Jct|state=WV|CR|507}} (Freedom Way)

|location=Weirton

|county=Brooke

|mile=0.70

|type=closed

|notes=Eastern terminus before bridge closure, western terminus of WVCR 507

}}

{{OHintbtm|keys=closed,incomplete}}

See also

  • {{portal-inline|Ohio}}
  • {{portal-inline|U.S. Roads}}

References

{{Reflist}}