Arkun Dam
{{Infobox dam
| name = Arkun Dam
| name_official =
| image = Arkun HES.jpg
| image_size =
| image_caption =
| image_alt =
| location_map = Turkey
| location_map_size =
| location_map_caption =
| coordinates = {{coord|40|40|34.25|N|41|17|21.09|E|type:landmark|display=inline,title}}
| country = Turkey
| location = İspir, Erzurum Province
| status = O
| purpose = Power
| construction_began = 2011
| opening = 2014
| demolished =
| cost =
| owner = State Hydraulic Works
| dam_type = Embankment, earth-fill
| dam_height =
| dam_height_thalweg ={{Convert|140|m|ft|0|abbr=on}}
| dam_height_foundation={{Convert|188|m|ft|0|abbr=on}}
| dam_length =
| dam_width_crest =
| dam_width_base =
| dam_volume = {{Convert|6774345|m3|cuyd|0|abbr=on}}
| dam_elevation_crest =
| dam_crosses = Çoruh River
| spillway_count =
| spillway_type =
| spillway_capacity =
| res_name =
| res_capacity_total =
| res_capacity_active =
| res_capacity_inactive=
| res_catchment = {{Convert|6853|km2|mi2|0|abbr=on}}
| res_surface =
| res_elevation =
| res_max_depth =
| res_max_length =
| res_max_width =
| res_tidal_range =
| plant_operator =
| plant_commission = June 2014
| plant_decommission =
| plant_type =
| plant_turbines = Downstream: 3 x 75 MW Francis-type
Toe: 2 x 5.96 MW Francis-type
| plant_capacity = 236.92 MW
| plant_annual_gen = 788 GWh (estimate)
| plant_hydraulic_head = Downstream: {{Convert|225|m|ft|0|abbr=on}} (gross){{cite web|last=Sucu |first=Sezai |title=Çoruh Basin Projects |url=http://www.e-kutuphane.imo.org.tr/pdf/10912.pdf |publisher=State Hydraulic Works |access-date=7 May 2013 |language=tr |url-status=dead |archive-url=https://web.archive.org/web/20140222063503/http://www.e-kutuphane.imo.org.tr/pdf/10912.pdf |archive-date=22 February 2014 }}
Toe: {{Convert|225|m|ft|0|abbr=on}} {{Convert|121|m|ft|0|abbr=on}} (nominal){{cite web|title=Introductory File For Capacity Increase Within Arkun Dam and HEPP |url=http://www.enerjisa.com.tr/en-US/Generation/OurProjects/ProjectDocuments/Arkun-CapacityPDR_EN.pdf |publisher=Dolsar |access-date=7 May 2013 |date=November 2010 |url-status=dead |archive-url=https://web.archive.org/web/20140221164551/http://www.enerjisa.com.tr/en-US/Generation/OurProjects/ProjectDocuments/Arkun-CapacityPDR_EN.pdf |archive-date=21 February 2014 }}
| website =
| extra =
}}
The Arkun Dam is an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction was supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) (11.92 MW) and the other downstream (225 MW) in Artvin Province.{{cite web|title=As arkun Dam and HEPP was completed in a short period of 4 years.|url=https://www.dsi.gov.tr/haberler/2014/06/17/arkunbarajiveheshizmetealindi|publisher=State Hydraulic Works|access-date=25 February 2016|language=tr|date=18 June 2014}}
See also
{{stack|{{Portal|Turkey|Water|Renewable energy}}}}
- Yusufeli Dam – under construction downstream
References
{{reflist}}
{{Dams and reservoirs in Turkey}}
{{Çoruh River dams}}
{{Power stations in Turkey}}
Category:Dams in Erzurum Province
Category:Hydroelectric power stations in Turkey
Category:Dams on the Çoruh River
Category:Dams completed in 2014
Category:2014 establishments in Turkey
Category:Energy infrastructure completed in 2014
Category:21st-century architecture in Turkey
{{Turkey-dam-stub}}