Askam and Ireleth Wind Farm
{{Use dmy dates|date=April 2022}}
{{Infobox power station
| name = Askam and Ireleth Wind Farm
| image =
| image_caption =
| coordinates = {{coord|54|11|14|N|03|10|20|W|type:landmark|display=inline,title}}
| name_official =
| country = England, United Kingdom
| location = Askam and Ireleth
| status = Operational
| construction_began = 1998
| commissioned = July 1999
| decommissioned =
| cost =
| owner =
| operator = B9 Energy
| ps_units_operational = 7 x 0.66 MW
| ps_units_manu_model = Vestas: V47
| wind_hub_height =
| wind_rotor_diameter =
| wind_rated_speed =
| wind_farm_type =
| wind_site_elevation =
| wind_site_usage =
| wind_offshore_depth =
| wind_offshore_distance =
| ps_electrical_capacity = 4.62 MW
| ps_electrical_cap_fac =
| website =
}}
Image:Askam and Ireleth-turbines 1-09.04.07.jpg
Askam and Ireleth Wind Farm is a group of 7 turbines located two kilometers east of the village Askam and Ireleth, on the southern slopes of Hare Slack Hill. Work on the turbines started in late 1998, and the wind farm took eight months to complete. It first generated energy in July, 1999.{{cite web |url= http://www.b9energy.co.uk/opmain_england.htm|title= Askam|accessdate=2007-03-10 |publisher= B9 Energy |archiveurl = https://web.archive.org/web/20070304135509/http://www.b9energy.co.uk/opmain_england.htm |archivedate = March 4, 2007}}
Description
Recent reports show the windfarm is producing only 30.2% of the theoretical maximum amount of electricity claimed by then-operators Powergen in the planning application.{{cite web |url= http://www.scottish.parliament.uk/business/committees/enterprise/inquiries/rei/ec04-reis-hall,drmike.pdf|title= Wind Energy – Saint or Sinner? [page 3 of 5]|accessdate=2007-03-10 |last= Hall|first= Dr Mike|publisher= The Scottish Parliament}}
E.ON, developer and owner, claims that the wind farm generated enough renewable electricity in 2005 to supply nearly 2,500 homes and avoided the emission of over 4,000 tonnes of carbon dioxide.{{cite web |url= http://www.eon-uk.com/447.aspx|title= E.ON UK – Askam|accessdate=2007-07-24 |publisher= E.ON|archiveurl= https://web.archive.org/web/20061029072235/http://eon-uk.com/447.aspx|archivedate= 2006-10-29}} The wind farm, which features seven turbines measuring {{convert|40|m|ft|0}} to the top of the tower, is not permanently staffed. Instead it is controlled and monitored from Rheidol Hydroelectric Power Station, near Aberystwyth, Mid Wales.{{cite web|url= http://www.eon-uk.com/447.aspx|title= Askam|accessdate= 2007-03-10|publisher= E.ON UK|archiveurl= https://web.archive.org/web/20070302162231/http://www.eon-uk.com/447.aspx|archivedate= 2007-03-02|url-status= dead}}
Local opposition to the windfarm
The Marton, Askam and Ireleth Windfarm Action Group (MAIWAG) was formed by local residents of the three villages upset by what they saw as the inconsiderate construction of the windfarm by then developers Wind Prospect. The group claimed the reality of the windfarm at Far Old Park farm bore little resemblance to the proposed scheme they were first told about.{{cite web|url=http://www.barrhill.org.uk/windfarm/noise/opposition/Living%20with%20wind%20turbines%20-%20Broken%20promises.htm |title=Broken Promises |accessdate=2007-04-15 |year=2004 |publisher=MAIWAG |url-status=dead |archiveurl=https://web.archive.org/web/20071008083403/http://www.barrhill.org.uk/windfarm/noise/opposition/Living%20with%20wind%20turbines%20-%20Broken%20promises.htm |archivedate=October 8, 2007 }} Their main concerns related to the size and environmental impact of the development as well as noise it produced. It was discovered that six of the seven turbines were not constructed in line with the developer's original application and as such did not have planning permission.{{cite web| url = http://www.iberica2000.org/documents/EOLICA/noise/NoiseWindfarms_CourtBattle.doc| title = Noise Windfarms Court Battle | accessdate =2007-04-15| format = doc | publisher = MAIWAG}} Barrow Borough Council signed an agreement with the developer, imposing a range of planning conditions on the turbines already built. As complaints by local residents continued to be made about the noise the council resolved to take action against the windfarm. Later, borough councillors decided to drop this planned enforcement action in December 2002. Disappointed by this decision, six members of the group went ahead with a private prosecution against the owners and operators of the windfarm on the grounds it was a "noise nuisance". But their case was unsuccessful.{{cite news |title= Judge rejects wind farm complaint|url= http://news.bbc.co.uk/1/hi/england/3413631.stm|publisher= BBC|date= 2004-01-20|accessdate=2007-03-10}}
Members of the group later toured the country to share their experiences and aid other countryside defence groups in their fight against excessive windfarm development.{{cite web| url= http://www.stopcambridgewindfarm.org.uk/documents/David_brierely.htm| title= David Brierley presentation| accessdate= 2007-04-15| publisher= Stop Cambridge Windfarm| archiveurl= https://web.archive.org/web/20070502030849/http://www.stopcambridgewindfarm.org.uk/documents/David_brierely.htm| archivedate= 2 May 2007| url-status= dead}}
References
{{Reflist}}
External links
{{stack|{{Portal|England|Weather|Renewable energy}}}}
- [https://web.archive.org/web/20121102132011/http://www.bwea.com/ukwed/operational.asp Operational wind farms]
{{Wind power in the United Kingdom}}
{{North West Power Stations}}