Atal Tunnel
{{Short description|Highway tunnel of the Himalayas}}
{{Use Indian English|date=October 2020}}
{{Use dmy dates|date=October 2020}}
{{Infobox tunnel
|name = Atal Tunnel
|image = File:Atal Tunnel vrtmrgmpksk (2).jpg
|caption = Atal Tunnel during winter
|location = Himachal Pradesh, India
|coordinates = {{coord|32.401270|77.148335|type:tunnel_region:IN|display=inline}}
|route = File:NH3-IN.svg NH 3
|status = {{green|Active}}
|crosses = Rohtang Pass
|start =
|end =
|startwork = May 2010
|opened = 4 October 2020
|close =
|owner =
|operator = Border Roads Organisation
|traffic = Automotive
|character =
|toll =
|vpd =
|construction =
|length = {{convert|9.02|km}}
|lanes = Two (one in each direction)
|speed = {{convert|40-60|km/h|abbr=on}}
|hielevation =
|lowelevation =
|width = {{convert|10|m}}
|grade =
|extra={{URL|https://marvels.bro.gov.in/AtalTunnel}}}}
Atal Tunnel ({{langx|hi|अटल सुरंग}}) is a {{convert|9.02|km|mi|adj=mid|-long}} road tunnel connecting Manali and Keylong. It helps in bypassing the Rohtang Pass, Himachal Pradesh in the eastern Pir Panjal range of the Himalayas. It carries two lanes of National Highway 3.{{Cite web|title=9-km-long Atal Tunnel an engineering marvel|url=https://www.theindianhawk.com/2020/10/9-km-long-atal-tunnel-engineering-marvel.html|access-date=3 October 2020|website=Indian Defense News, Indian Armed Forces, IDRW, Defence}} It is the longest highway single-tube tunnel above {{convert|10000|ft|m|0}} in the world.{{Cite web|title=Atal Tunnel Certified By World Book Of Records As Longest Highway Tunnel|url=https://www.ndtv.com/india-news/atal-tunnel-officially-recognised-as-longest-highway-tunnel-above-10-000-feet-by-world-book-of-records-2759321|access-date=|website=NDTV India}}{{Cite web|url=https://www.financialexpress.com/infrastructure/roadways/atal-tunnel-how-worlds-2nd–longest-tunnel-above-10000-feet-at-rohtang-pass-will-make-use-of-automation-solutions/2095983/|title=Atal Tunnel: How world's longest tunnel above 10,000 feet at Rohtang pass will make use of automation solutions|date=1 October 2020}} It is named after the former Prime Minister of India, Atal Bihari Vajpayee.
The tunnel reduces the travel time and overall distance between Manali and Keylong on the way to Leh. The route, which previously went through Gramphu, was {{convert|116|km|mi|abbr=on|1}} long and took 5 to 6 hours in good conditions. The new route via the tunnel brings down the total distance travelled to {{convert|71|km|mi|abbr=on|1}} which can be covered in about 2 hours, a reduction of around 3 to 4 hours when compared to the earlier route. Moreover, the tunnel bypasses most of the sites that were prone to road blockades, avalanches, and traffic snarls.{{cite web|url=http://www.thenewshimachal.com/2011/03/importance-of-rohtang-tunnel-for-lahaul-pangi-residence/ |title=Importance of Rohtang Tunnel for Lahaul & Pangi resident |date=3 March 2011 |publisher=The News Himachal |access-date=29 July 2012}}{{Cite web|date=29 August 2020|title=Explained: What is the strategic importance of Atal Tunnel at Rohtang?|url=https://indianexpress.com/article/explained/the-strategic-importance-of-the-rohtang-tunnel-6572025/|access-date=29 August 2020|website=The Indian Express|language=en}}
History
File:The Prime Minister, Shri Narendra Modi dedicates to the nation the World’s longest Highway tunnel - Atal Tunnel, in Manali, Himachal Pradesh on October 03, 2020 (1).jpg inaugurating the Atal Tunnel in Manali, Himachal Pradesh on 3 October 2020. Along with Rajnath Singh, Jai Ram Thakur and Bipin Rawat]]
= In 19th Century =
The Moravian Mission first talked about the possibility of a tunnel through Rohtang Pass to reach Lahaul in 1860.{{cite web |title=Atal Tunnel, Rohtang |url=http://bro.gov.in/WriteReadData/linkimages/9390242669-t2.pdf |publisher=Border Roads Organization}}
=In 20th Century=
The proposal for the construction of a tunnel across Rohtang Pass was first conceived in 1942 by Dr. John Bicknell Auden, Geological Survey of India (GSI) who at that time visited this pass intending to divert the water of Chandra river to Beas.
When Atal Bihari Vajpayee became the Prime Minister, locals suggested his childhood friend Arjun Gopal to visit him and to talk about Rohtang Tunnel. Gopal and two companions, Chhering Dorje and Abhay Chand, moved to Delhi. After a year of discussions, Vajpayee went to Lahaul in June 2000 and declared that the Rohtang Tunnel would be constructed. RITES conducted a feasibility study.
In 2000, the project was estimated to cost ₹500 crore and be completed in seven years.{{cite web|url=http://www.rediff.com/news/2000/jun/07jk.htm |title=PM reiterates desire for peace with Pak |work=Rediff.com |date=7 June 2000 |access-date=12 January 2012}} On 26 May 2002, the Border Roads Organisation (BRO), a tri-service organisation of the Defence Ministry specialising in road and bridge construction in difficult terrains, headed by Lt. Gen. Prakash Suri, PVSM, was put in charge of construction.{{Cite web|title=PIB Press Releases|url=http://pibarchive.nic.in/archive/releases98/lyr2002/rmay2002/06052002/r0605200219.html|access-date=3 October 2020|website=pibarchive.nic.in}} The approach road to the tunnel entrance was inaugurated by Atal Bihari Vajpayee.
However the project did not move beyond the tree-felling stage by May 2003. By December 2004, the cost estimate had grown to ₹900 crore.{{cite web|url=http://pib.nic.in/release/rel_print_page1.asp?relid=5296 |title=Construction of Rohtang Tunnel |publisher=Pib.nic.in |date=2 December 2004 |access-date=12 January 2012}} In May 2007, the government of Dr. Manmohan Singh awarded the contract to SMEC (Snowy Mountains Engineering Corporation) International Private Limited, an Australian company, and the completion date was revised to 2014. However, there was no progress for the next three years, until May 2010.{{cite web |url=http://www.headlinesindia.com/state-news/himachal-pradesh/rohtang-tunnel-work-likely-to-start-next-month-17060.html |title=Rohtang tunnel work likely to start next month |publisher=Headlinesindia.com |date=16 July 2009 |access-date=12 January 2012 |url-status=dead |archive-url=https://archive.today/20130125032802/http://www.headlinesindia.com/state-news/himachal-pradesh/rohtang-tunnel-work-likely-to-start-next-month-17060.html |archive-date=25 January 2013 }}
Finally, the Cabinet Committee on Security in UPA government cleared the Rohtang Tunnel Project. The work was awarded to a joint venture of AFCONS Infrastructure Limited, an Indian construction company of Shapoorji Pallonji Group, and STRABAG AG, Austria, in September 2009.{{cite web |url=http://www.afcons.com/partners.html |title=Afcons Infrastructure : Partners |publisher=Afcons.com |access-date=12 January 2012 |url-status=dead |archive-url=https://web.archive.org/web/20111227070440/http://www.afcons.com/partners.html |archive-date=27 December 2011 }} The drilling of the Rohtang Tunnel through the Himalayan ranges began on 28 June 2010 at the South Portal, {{convert|25|km|mi|0|abbr=on}} north of Manali. Some of the anchoring and slope stabilisation work was subcontracted to Spar Geo Infra Pvt Ltd. Permanent maintenance free earthing system design, supply and installation was sub-contracted to Manav Energy Pvt. Ltd.{{cite web |url=https://www.manavenergy.com |title= Manav Energy: Electrical Safety & Reliability |publisher=manavenergy.com |access-date=12 January 2022}}
Prime Minister Narendra Modi renamed the tunnel as the Atal Tunnel, in honour of Shree Atal Bihari Vajpayee, on 25 December 2019, Vajpayee's birthday.[https://www.thehindu.com/news/national/cabinet-nod-for-water-scheme-renaming-of-tunnel-after-vajpayee/article30391004.ece Cabinet nod for water scheme, renaming of tunnel after Vajpayee], The Hindu, 24 December 2019.
The Atal Tunnel has been planned to ensure an all-seasons, all-weather road route to strategically important areas of Ladakh and the remote Lahaul-Spiti valley. However, the tunnel will provide this connectivity only up to Darcha, north of Keylong in the Lahaul region of Himachal Pradesh. Connectivity to Ladakh will require more tunnels: either at Shikun La, or at the passes located on the present Leh-Manali road. Director General Border Roads Lt Gen Rajeev Chaudhry, VSM has initiated plans for construction of tunnel at Shinkula.
Timeline
Total length of tunnel is 9.02 km.
- The project was announced by the then Prime Minister Atal Bihari Vajpayee on 3 June 2000. The work was entrusted to BRO on 6 May 2002.{{Cite web|date=11 September 2017|title=Engineering marvel: India's highest tunnel to see light of day in October|url=https://www.hindustantimes.com/india-news/engineering-marvel-india-s-highest-tunnel-to-see-light-of-day-in-october/story-aVRU5NtXtMdYbFwHyajjxI.html|access-date=3 October 2020|website=Hindustan Times|language=en}}
- The foundation stone of the project was laid on 28 June 2010 by Sonia Gandhi in her capacity as the Chairperson of National Advisory Council.
- As of June 2012, two years after the start of the project, 3.5 km of the tunnel digging had been completed.{{cite web|url=http://dailypioneer.com/nation/70678-rivulet-gushes-out-during-rohtang-tunnel-digging.html|title=Rivulet gushes out during Rohtang tunnel digging|work=The Pioneer|location=India |date=5 June 2012 |access-date=17 June 2012}}
- Only a little progress was made in the next one year due to heavy ingress of water at serri nullah fault zone, that required constant dewatering and slowed the digging and blasting to a crawl.
- As of October 2013, a little more than 4 km of the tunnel had been dug. However, about 30 m portion of the roof of the tunnel collapsed towards the north portal on 17 October 2013 and the digging had to be stopped.{{cite web|url=http://www.ndtv.com/article/cities/part-of-rohtang-tunnel-collapses-work-halted-434316|title=Part of Rohtang Tunnel Collapses|publisher=NDTV.com |date=19 October 2013}}
- As of September 2014, 4.4 km of the tunnel, i.e., half of 8.8 km planned length had been dug.{{cite web|url=http://pib.nic.in/newsite/PrintRelease.aspx?relid=109874|title=BRO Annual Chief Engineers' Conference 2014 : A Curtain Raiser|website=pib.nic.in}}{{Cite news|url=https://timesofindia.indiatimes.com/city/shimla/Rohtang-tunnel-may-not-be-ready-before-2019/articleshow/48675331.cms|title=Rohtang tunnel may not be ready before 2019 | Shimla News - Times of India|website=The Times of India|date=26 August 2015 }}
- As of December 2016, 7.6 km of the tunnel digging had been completed. Excavation was expected to be completed in 2017, with opening in the second half of 2019.{{cite web|url=http://hillpost.in/2017/01/rohtang-tunnel-records-best-yearly-progress-in-2016/107884/|title=Rohtang Tunnel Records Best Yearly Progress in 2016 - Hill Post|website=hillpost.in|date=5 January 2017 }}{{Cite news|url=https://timesofindia.indiatimes.com/city/shimla/Defence-ministry-checks-Rohtang-Tunnel-progress/articleshow/55426709.cms|title=Rohtang tunnel project: Defence ministry checks Rohtang Tunnel progress | Shimla News - Times of India|website=The Times of India|date=15 November 2016 }}
- As on 13 October 2017 both ends of the tunnel met. The Defence Minister, Nirmala Sitharaman, visited the site on 15 October 2017.{{Cite web|url=https://www.amarujala.com/shimla/union-defence-minister-nirmala-sitharaman-on-rohtang-tunnel-tour|title=रोहतांग टनल का निरीक्षण करने पहुंच रहीं रक्षा मंत्री, बीआरओ अधिकारियों के साथ करेंगी बैठक|website=Amar Ujala|language=hi}}{{cite web|url=http://www.hindustantimes.com/india-news/himachal-polls-2017-quiet-opening-to-rohtangtunnel-amid-election-din/story-joy4mvfOmw4uDsilNt48LI.html|title=Himachal polls-2017: Quiet opening to Rohtang tunnel amid election din|date=28 October 2017}}
- As on 22 November 2017, it was decided to allow patients to be carried through the under-construction tunnel only in the gravest of emergency when the helicopter service was not available and not to allow civilians to enter the tunnel before completion due to risks of falling rocks, lack of oxygen in the tunnel as ventilation system was yet to be installed, etc. and likely interruption in construction work due to presence of civilians.{{Cite news|url=https://timesofindia.indiatimes.com/city/chandigarh/rohtang-tunnel-to-be-used-only-in-severe-medical-emergency/articleshow/61746076.cms|title=Rohtang tunnel to be used only in severe medical emergency | Chandigarh News - Times of India|website=The Times of India|date=22 November 2017 }}
- Sep 2018: the tunnel was used for evacuation of people stranded in Lahaul after sudden spell of bad weather blocked Rohtang La due to snowfall.{{Cite web|url=https://www.tribuneindia.com/news/archive/himachal/210-rescued-from-koksar-lahaul-valley-658678|title=210 rescued from Koksar, Lahaul valley|first=Tribune News|last=Service|website=Tribuneindia News Service}}
- Nov 2019: Bus service trial started through the yet-incomplete tunnel on 17 November 2019.{{Cite web|url=https://www.tribuneindia.com/news/archive/himachal/hrtc-starts-bus-via-rohtang-tunnel-862351|title=HRTC starts bus via Rohtang tunnel|first=Tribune News|last=Service|website=Tribuneindia News Service}} A Himachal Road Transport Corporation bus carrying 44 passengers entered tunnel from the south portal and the passengers alighted at the north portal. The bus service operated for next five winter months for residents of Lahaul and Spiti valleys. Private vehicles were not allowed through the tunnel.{{Cite web|url=http://www.uniindia.com/hrtc-launches-bus-service-across-rohtang-tunnel/north/news/1792112.html|title=HRTC launches bus service across Rohtang tunnel}}
- Dec 2019: On 25 December the tunnel, which was known as Rohtang tunnel till then, was officially renamed as the Atal Tunnel.
- Sept 2020: 100% completion of project.
- Oct 2020: The tunnel was inaugurated by the Prime Minister, Narendra Modi on 3 October 2020, in the presence of Minister of Defence, Rajnath Singh and Chief Minister of Himachal Pradesh, Jai Ram Thakur and Minister of State for Finance, Anurag Thakur.
- Mar 2022: Minister of Defence Shri Rajnath Singh dedicated website https://marvels.bro.gov.in dedicated to the Nation which will felicitate Citizens and students across the Country to visit the Tunnel.
Challenges
The most challenging task was to continue the excavation during heavy snowfall in winter. Excavation for tunnelling was done from both ends. However, as Rohtang pass closes during the winter, the north portal was not accessible during winter and the excavation was being done only from the south portal in winters. Only about one-fourth of the entire tunnel was excavated from the north end and three-fourths was excavated from the south end. There were more than 46 avalanche sites on approaches to the tunnel.{{cite news| url=https://timesofindia.indiatimes.com/india/88-km-tunnel-to-make-Leh-accessible-in-all-seasons/articleshow/1014940.cms | archive-url=https://web.archive.org/web/20111116152700/http://articles.timesofindia.indiatimes.com/2007-01-02/india/27873958_1_manali-km-long-tunnel-lahaul-valley | url-status=live | archive-date=16 November 2011 | work=The Times of India | title=8.8-km tunnel to make Leh accessible in all seasons | date=2 January 2007}}
Other challenges to the progress of the tunnel included difficulties in disposing of the more than 800,000 m3 of excavated rock and soil,{{cite web|url=http://cities.expressindia.com/fullstory.php?newsid=59195|title=Latest News, Breaking News Live, Current Headlines, India News Online|website=The Indian Express}}{{dead link|date=February 2023|bot=medic}}{{cbignore|bot=medic}} heavy ingress of water (as much as 3,000,000 litres per day in June 2012) that required constant dewatering and costlier treatment, and unstable rocks that slowed blasting and digging. The progress of excavation was regularly slowed from 5 metres per day to just half a metre a day.{{cite news| url=http://articles.timesofindia.indiatimes.com/2012-11-19/india/35204208_1_rohtang-tunnel-longest-tunnel-ingress | archive-url=https://archive.today/20130103103433/http://articles.timesofindia.indiatimes.com/2012-11-19/india/35204208_1_rohtang-tunnel-longest-tunnel-ingress | url-status=dead | archive-date=2013-01-03 | work=The Times of India | title=Water ingress, loose rocks delay boring of Rohtang tunnel}} A cloud-burst and flash flood on 8 August 2003 killed 42 labourers who were building the temporary access road.{{cite news |url=http://www.tribuneindia.com/2003/20030809/main1.htm |title=60 washed away in Kulu flash floods |work=The Tribune |location=Chandigarh |date=9 August 2003 |access-date=12 January 2012}} Questions were also raised on the impact of cutting down more than 700 trees on the ecology.{{cite news |url=http://www.tribuneindia.com/2003/20030811/main5.htm |title=Rohtang tunnel to affect area ecology, warn experts |work=The Tribune |location=Chandigarh |date=11 August 2003 |access-date=12 January 2012}}
Specifications
The tunnel is intended to create an all-weather route to Leh and Lahaul and Spiti valleys in Himachal Pradesh.
Salient features of the Atal Tunnel are as follows:
:* Length: {{convert|9.02|km|mi|abbr=on|1}}
:* Shape (cross-section) of Tunnel: Horseshoe
:* Finished width: {{convert|10.00|m|ft|abbr=on|1}} at road level. (8m pavement and 1m footpath on both sides)
:* General altitude of the tunnel: {{convert|3000|-|3100|m|ft|-1|disp=or|abbr=on}}
:* Designated vehicular speed: {{convert|80|km/h|mph|0|abbr=on}}
:* Geology of tunnelling media: Uniformly dipping alternate sequence of quartzites, quartzitic schists, quartz-diolite-schist with thin bands.
:*Tunnel boring machines were not used because of the inability to see inside the mountain, instead blasting and digging used to build the tunnel.{{cite news|last=Polgreen|first=Lydia|date=31 July 2010|title=India Digs Under Top of the World to Match Rival|work=The New York Times|url=https://www.nytimes.com/2010/08/01/world/asia/01pass.html?_r=1&ref=global-home&pagewanted=all|access-date=12 January 2012}}
:* Temperature variation in the area: {{convert|25|-|30|C|F}} during May–June, {{convert|-30|to|-20|C|F}} during Dec–Jan.
:* Overburden: Maximum {{convert|1900|m|ft|-1}}, average more than {{convert|600|m|ft|-1|abbr=on}}
:* Construction technique: Drill & Blast with NATM
:* Support system: Fibre-reinforced concrete (100–300mm or 0–10 inch thick) combined with rock bolt (26.50mm dia, 5,000–9,000mm or 200–350 inch long) has been used as the principal support system.
:* Tunnel ventilation: Semi-transverse system of ventilation.
:* A 2.25 m high and 3.6 m wide emergency tunnel is integrated in the tunnel cross-section beneath the main carriageway.
The following parameters have been set in design:
:* (a) Upper tolerance limit for concentration – 150ppm
:* (b) Visibility factor – 0.009/m
:* (c) Vehicles
::* (i) Cars – 3000 Nos.
::* (ii Trucks – 1500 Nos.
:* (d) Peak hour traffic – 337.50 PCUs
:* (e) Design vehicular speed in Tunnel
::* (i) Maximum Speed – {{convert|80|km/h|mph|0|abbr=on}}
::* (ii) Minimum Speed – {{convert|30|km/h|mph|0|abbr=on}}
Project Cost : Approximately ₹3,200 crore{{Cite web|date=2020-09-16|title=Atal Tunnel: World's longest highway tunnel above 10,000 feet, connecting Manali to Leh, completed in 10 years|url=https://www.financialexpress.com/infrastructure/roadways/atal-tunnel-worlds-longest-highway-tunnel-above-10000-feet-connecting-manali-to-leh-completed-in-10-years/2084776/|access-date=2020-10-06|website=The Financial Express|language=en-US}}
Safety measures
The tunnel was built using the New Austrian tunnelling method and has been equipped with a semi-transverse ventilation system, where large fans separately circulate air throughout the tunnel. A 2.250 m tall and 3.6 m wide emergency tunnel has been integrated into the tunnel cross-section beneath the main carriageway for evacuation during emergencies.{{cite web |last1=Sharma |first1=Dikshit |title=Conquering the Himalayas: A Professional Perspective on the Atal Tunnel |url=https://diarytimes.com/conquering-the-himalayas-a-professional-perspective-on-the-atal-tunnel/ |website=Diarytimes |access-date=12 July 2024 |language=en |date=11 July 2024}}
Fires inside the tunnel will be controlled within an area of 200 metres and fire hydrants are provided at specific locations throughout the tunnel. The tunnel also has a public announcement system to make important announcements in emergency situations for which loudspeakers are installed at regular intervals.
Heavy snowfall in the Rohtang Pass area is a major concern, especially on the approach roads to the main tunnel. To prevent any damage to the roads and to ensure the safety of the roads and tunnel users alike, avalanche control structures have been constructed. Since the Atal tunnel is likely to witness heavy traffic, CCTV cameras are placed at regular intervals in the tunnel which are connected to two monitoring rooms on both ends of the tunnel for vehicular management and pollution monitoring. Pollution sensors continuously monitor the air quality in the tunnel and if the air quality in the tunnel is below the desired level, fresh air is injected into the tunnel via two heavy duty fans on each side of the tunnel.
Gallery
File:The Prime Minister, Shri Narendra Modi dedicates to the nation the World’s longest Highway tunnel - Atal Tunnel, in Manali, Himachal Pradesh on October 03, 2020 (3).jpg|Prime Minister Narendra Modi and other dignitaries after the inauguration of the Atal Tunnel.
File:The Prime Minister, Shri Narendra Modi dedicates to the nation the World’s longest Highway tunnel - Atal Tunnel, in Manali, Himachal Pradesh on October 03, 2020 (7).jpg|Prime Minister Narendra Modi is walking through the roads of the tunnel after its inauguration.
File:The Prime Minister, Shri Narendra Modi dedicates to the nation the World’s longest Highway tunnel - Atal Tunnel, in Manali, Himachal Pradesh on October 03, 2020 (14).jpg|Prime Minister Narendra Modi flags off a bus from Manali after inaugurating the Atal Tunnel.
See also
- Lists of tunnels
- India-China Border Roads
- Dr. Syama Prasad Mookerjee Tunnel: India's longest road tunnel
- Shinku La tunnel{{cite web | last=Bisht | first=Gaurav | title=After Rohtang, more high-altitude tunnels to come up on Manali-Leh highway | website=Hindustan Times | date=1 October 2020 | url=https://www.hindustantimes.com/cities/after-rohtang-more-high-altitude-tunnels-to-come-up-on-manali-leh-highway/story-INv0t7ftiERrL0oXRBU2DL.html | access-date=5 October 2020}}
- Zoji-la Tunnel
- Sonamarg Tunnel
References
{{Reflist|30em}}
External links
- [http://www.bro.gov.in/indexmain.asp?lang=1&projectid=29&cat_id=2 BRO's Rohtang Tunnel pages]
- [https://web.archive.org/web/20120520070537/http://www.in.com/videos/watchvideo-rohtang-tunnel-8453142.html 2011 news report – at around 1'10" the footage gives a good idea of the planned portal]
{{Authority control}}
Category:Road tunnels in India
Category:Road tunnels in Himachal Pradesh
Category:Transport in Himachal Pradesh
Category:Road tunnels in the Himalayas
Category:Buildings and structures in Himachal Pradesh
Category:Transport in Manali, Himachal Pradesh
Category:Memorials to Atal Bihari Vajpayee
Category:Road infrastructure in India