Automotive Square metro station

{{short description|Nagpur Metro's Orange Line terminal metro station}}

{{Use dmy dates|date=August 2023}}

{{Infobox station

| name = Automotive Square

| style = Nagpur Metro

| type = {{Nagpur Metro Infobox station line|line=Orange}}

| image =

| address = Sidharth Nagar, Nagpur, Maharashtra 440026

| coordinates = {{coord|21.18573|79.11968|display=inline,title}}

| owned = Maharashtra Metro Rail Corporation Limited (MAHA-METRO)

| operator = Nagpur Metro

| lines = {{rcb|Nagpur Metro|Orange|croute}}

| platforms = Side platform
Platform-1 → Train Terminates Here
Platform-2 → Khapri

| tracks = 2

| structure = Elevated, Double track

| levels = 2

| accessible = Yes {{access icon}}

| status = Operational

| opening = {{start date and age|df=yes|12 December 2022}}

| electrified = 750 V DC third rail

| services = {{adjacent stations|system=Nagpur Metro|line=Orange|left=|to-left=Automotive Square|right=Nari Road|to-right=Khapri}}

| map_type =

| map_size =

| map_dot_label =

| route_map = {{Nagpur Metro North-South Line}}

| map_state = collapsed

| mapframe = yes

| mapframe-marker = rail

| mapframe-marker-color = #{{rail color|Nagpur Metro|Orange}}

| mapframe-zoom = 14

}}

Automotive Square is the elevated northern terminal metro station on the North-South Corridor of the Orange Line of Nagpur Metro in Nagpur, India.{{Cite web |title=PM Modi Inaugurates Nagpur Metro, Flags Off 6th Vande Bharat Train |url=https://www.ndtv.com/india-news/pm-modi-inaugurates-nagpur-metro-flags-off-6th-vande-bharat-train-3596721 |access-date=2023-08-12 |website=NDTV.com}} This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022. {{Cite web |date=2022-12-05 |title=PM Modi to launch remaining routes in Nagpur Metro phase-I on December 11 |url=https://indianexpress.com/article/cities/nagpur/pm-modi-launch-routes-nagpur-metro-phase-i-december-11-8307057/ |access-date=2023-08-12 |website=The Indian Express |language=en}}{{Cite web |date=2022-12-11 |title=PM Modi inaugurates Phase-I of Nagpur Metro, takes a ride |url=https://www.businesstoday.in/latest/story/pm-modi-inaugurates-phase-i-of-nagpur-metro-takes-a-ride-355940-2022-12-11 |access-date=2023-08-12 |website=Business Today |language=en}}

Station layout

{{stack|{{Routemap

| title = Automotive Square track layout

| title-bg = #{{rail color|Nagpur Metro|Orange}}

| title color = white

| legend = track

| collapsible = no

| map = vCONTgfa

cPLT\vSTR\cPLT ~~ ~~ ~~ to Train Terminates Here

  • P1\cPLT\vSTR\cPLT\*P2

cPLT\vSTR\cPLT ~~ ~~ ~~ to {{stl|Nagpur Metro|Nari Road}}

vCONTgfe

| bottom =

Station with two tracks and two side platforms

}}}}

table border=0 cellspacing=0 cellpadding=3

|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=50 valign=top|G

|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=100 valign=top|Street level

|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance

valign=top|L1

|valign=top|Mezzanine

|valign=top|Fare control, station agent, Metro Card vending machines, crossover

style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=50 rowspan=4 valign=top|L2

|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|Side platform | Doors will open on the left {{access icon}}

style="border-bottom:solid 1px gray;" width=100|Platform 2
Southbound

|style="border-bottom:solid 1px gray;" width=500|Towards → Khapri
Next Station: Nari Road

Platform 1
Northbound

|Towards ← Train Terminates Here

style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|Side platform | Doors will open on the left {{access icon}}
style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|L2

|style="border-bottom:solid 1px gray;" width=100|

|style="border-bottom:solid 1px gray;" width=500|

Entry/Exit

{{Empty section|date=August 2023}}

See also

References

{{Reflist}}