Bangur Nagar metro station
{{Short description|Mumbai Metro's Yellow Line 2A terminal metro station}}
{{Use dmy dates|date=March 2023}}
{{Use Indian English|date=March 2023}}
{{Infobox station
| name = Bangur Nagar
| name_lang = en
| type = {{Mumbai Metro Infobox station line| line = 2A}}
| style = Mumbai Metro
| symbol = m
| symbol_location = mumbai
| image =
| image_caption =
| address = Mitha Nagar, Goregaon West, Mumbai, Maharashtra 400090
| coordinates = {{coord|19.16246|N|72.83489|E}}
| line = {{rcb|Mumbai Metro|Line 2A|route}}
| other =
| structure = Elevated, double-track railway
| platform = 2 side platforms
| operator = Maha Mumbai Metro Operation Corp. Ltd (MMMOCL)
| depth =
| tracks = 2
| parking = No
| bicycle =
| opened = {{start date and age|df=yes|2023|January|19}}
| closed =
| rebuilt =
| electrified =
| accessible =
| code =
| owned = Mumbai Metropolitan Region Development Authority (MMRDA)
| zone =
| smartcardname =
| smartcardstatus =
| former =
| passengers =
| pass_year = 2023
| pass_rank =
| pass_percent =
| pass_system =
| mpassengers =
| services = {{Adjacent stations|system=Mumbai Metro|line=2A|left=Lower Malad|right=Goregaon West}}
| route_map = {{MM Line 2}}
| map_state = collapsed
| mapframe = yes
| mapframe-marker = rail
| mapframe-marker-color = #{{rail color|Mumbai Metro|Line 2}}
| mapframe-zoom = 14
}}
Bangur Nagar is the elevated metro station serving Bangur Nagra neighbourhood of Goregaon on the North-South corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.{{Cite web |title=Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here |url=https://www.dnaindia.com/mumbai/report-mumbai-metro-line-2a-line-7-launches-check-routes-station-details-here-3018021 |access-date=2023-04-18 |website=DNA India |language=en |archive-date=18 April 2023 |archive-url=https://web.archive.org/web/20230418015654/https://www.dnaindia.com/mumbai/report-mumbai-metro-line-2a-line-7-launches-check-routes-station-details-here-3018021 |url-status=live }}{{Cite web |date=2023-01-19 |title=Mumbai Metro: These 2 lines to get operational today. Check route, other details |url=https://www.livemint.com/news/india/mumbai-metro-rail-lines-2a-7-to-get-operational-today-check-route-other-details-11674107578757.html |access-date=2023-04-18 |website=mint |language=en |archive-date=18 April 2023 |archive-url=https://web.archive.org/web/20230418021157/https://www.livemint.com/news/india/mumbai-metro-rail-lines-2a-7-to-get-operational-today-check-route-other-details-11674107578757.html |url-status=live }}
History
Station layout
cellspacing="0" cellpadding="3" border="0"
| style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width="50" valign="top" |G | style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="100" valign="top" |Street Level | style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="500" valign="top" |Exit/Entrance |
valign="top" |L1
| valign="top" |Mezzanine | valign="top" |Fare control, station agent, Metro Card vending machines, crossover |
rowspan="4" style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="50" valign="top" |L2
| colspan="2" style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" |Side platform |
style="border-bottom:solid 1px gray;" width="100" |Platform 2 Southbound | style="border-bottom:solid 1px gray;" width="500" |Towards → Andheri West next station is Goregaon West |
Platform 1 Northbound |Towards ← Dahisar East next station is Lower Malad |
colspan="2" style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" align="center" |Side platform |
rowspan="2" style="border-bottom:solid 1px gray;" width="50" valign="top" |L2
| style="border-bottom:solid 1px gray;" width="100" | | style="border-bottom:solid 1px gray;" width="500" | |
= Power and signaling system =
Like all other stations and railways of the Mumbai Metro, Andheri West station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
References
{{reflist|30em}}
{{Mumbai Metro navbox|line 2=yes}}