Bobota Canal

{{Infobox Canal

|name = Bobota Canal

|image = Боботски канал-Bobotski kanal 02.JPG

|image_caption = Bobota Canal next to the village of Bobota

|former_names = Kolodvar-Bobota Canal

|original_owner = Vukovar-Syrmia County, Osijek-Baranja County, Croatian Waters

|engineer = Friedrich Wilhelm Toussaint

|other_engineer =

|date_act = early 19th century

|date_use = 19th century

|date_completed = 1830-1836{{cite thesis |last=Viljanac |first=Vedran |date=2016 |title=Uređenje suvišnih voda sliva rijeke Vuke |language= hr |degree=Undergraduate |place=Osijek |chapter=4.2. Bobotski kanal |publisher=University of Osijek |url=https://repozitorij.fazos.hr/islandora/object/pfos%3A853/datastream/PDF/view |access-date=27 March 2020}}

|date_closed =

|date_restored = 1856-1857

1895-1896

1908

1920

|length_mi = 31.52

|len_in =

|original_boat_length =

|original_boat_length_in =

|len_note =

|beam =

|beam_in =

|original_beam =

|original_beam_in =

|beam_note =

|start_point = Vuka (Vladislavci)

|original_start =

|start_note =

|end_point = Vuka (Vukovar)

|original_end =

|end_note =

|branch =

|branch_of =

|connects_to =

|locks =

|original_num_locks =

|lock_note =

|elev =

|elev_note =

|status = Open

|navigation_authority =

| mapframe = yes

| mapframe-zoom = 8

| mapframe-stroke-color = #0000ff

| mapframe-stroke-width = 2

}}

The Bobota Canal ({{langx|hr|Bobotski kanal}}, {{lang-sr-cyr|Боботски канал}}, {{langx|hu|Bobota-csatorna}}) is a 50.73 kilometers long canal in Croatia. It is named after the eponymous village of Bobota.

The canal is classified as a water management system of paramount importance for irrigation and flood protection for settlements in the surrounding area. It is a channel of the first category in Croatia.{{cite web |url=http://digured.hr/cadial/searchdoc.php?query%3DPravilnik+o+kartografskim+znakovima%26searchText%3Don%26searchTitle%3Don%26resultdetails%3Dbasic%26lang%3Dhr%26resultoffset%3D0%26annotate%3Don%26bid%3DdLN2jn1j7elJaNbmKhsYwg%3D%3D |title=Archived copy |access-date=2011-10-16 }}

History

File:Bara Palača.png

File:Боботски канал.jpg]]

Construction of the Bobota Canal started in the early 19th century with the aim of prevention of epidemics among people in villages in the swamp and their animals.{{cite journal |last1=Branko |first1=Nadilo |date=2012 |title=Nova akumulacija u slivu rijeke Vuke: Zaštita od poplava i navodnjavanje |url=http://www.casopis-gradjevinar.hr/assets/Uploads/JCE_64_2012_10_R1_Gradiliste.pdf |journal=Građevinar |publisher=Croatian Association of Civil Engineers |volume=10 |issue=64 |pages=833–844 |access-date=22 January 2019}} Up to that point entire region was covered under Palača Swampland. Works without proper construction permits were initiated by nobleman Ivan Kapistran Adamović. Construction of Bobota Canal in Austria-Hungary period was the first major water management project of its kind and sale in modern-day Croatia in post-Roman Empire period. In the end, the canal constructed in the early 19th century was not efficient due to its insufficient width and depth.

The first extension and deepening of the canal was completed in 1856 and 1857 which were unsuccessful as they did not result in major improvements. In 1870 region suffered major floods which pushed Ivan Kapistran Adamović to invite French

water expert Friedrich Wilhelm Toussaint to inspect the area and propose the necessary hydro-technical measures. During his 3-month long stay Toussaint proposed technical solutions which included acquisition of new {{convert|575.5|km|mi}} square of new agricultural lands while complete costs were lower than the damage of the 1870 floods.

Toussaint's solution was not implemented at the time, but it served as a basis for all future projects. On 7 September 1876 the Association for the Regulation of the Vuka River was established with Roman Catholic bishop Josip Juraj Strossmayer as its first president. This date is today celebrated as the Day of the Croatian Waters. New works on the Bobota Canal lasted between 1895 and 1925.

In 2003, reconstruction of the canal was part of a larger project funded by the World Bank.{{cite web |url=http://www.obz.hr/hr/pdf/Program%20ure%C4%91enja%20kanalske%20mre%C5%BEe.pdf |title=PROGRAM UREĐENJA DETALJNE KANALSKE MREŽE U SVRHU NAVODNJAVANJA I ODVODNJE NA PODRUČJU OSJEČKO-BARANJSKE ŽUPANIJE |access-date=22 January 2019}}

Route

The canal is {{convert|50.73|km|mi}} long from west to east.

Settlements along the canal

References

{{reflist}}

{{Hydrography of Croatia}}

{{Trpinja Municipality}}

{{coord|45.4614336400|N|18.6038638600|E|type:river_region:HR-14_source:cgn.dgu.hr|display=title|format=dms}}

Category:Landforms of Vukovar-Srijem County

Category:Geography of Osijek-Baranja County

Category:Joint Council of Municipalities

Category:Canals in Croatia