Bonnie Doon stop

{{Short description|Light rail station in Edmonton, Alberta, Canada}}

{{Infobox station

| name = Bonnie Doon

| type = Edmonton LRT stop

| style = Edmonton LRT

| image = File:Bonnie Doon LRT stop 04-13-2023.jpg

| address =

| coordinates = {{Coord|53|31|10|N|113|27|20|W|type:railwaystation_region:CA-AB|display=inline,title}}

| line =

| other =

| structure = Surface

| platform = Side-loading platforms

| depth =

| levels =

| tracks = 2

| parking =

| bicycle =

| opened = November 4, 2023

| closed =

| rebuilt =

| electrified =

| accessible = Yes

| code =

| owned = City of Edmonton

| zone =

| former =

| passengers =

| pass_year =

| pass_percent =

| pass_system =

| mpassengers =

| other_services_header = Services

| other_services = {{Adjacent stations|system=Edmonton LRT|line=Valley|left=Holyrood|right=Avonmore}}

| map_locator =

| route_map = 250px

| map_state = collapsed

}}

Bonnie Doon stop is a tram stop on the Edmonton LRT network in Edmonton, Alberta, Canada. It serves the Valley Line, and is located on the west side of 83 Street, south of 84 Avenue, between Bonnie Doon and Idylwylde.{{cite web|title=Valley Line LRT Maps|url=https://www.edmonton.ca/projects_plans/transit/se-w-lrt-interactive-map.aspx|publisher=City of Edmonton|accessdate=July 9, 2017}} The stop was scheduled to open in 2020;{{cite web|title=Valley Line LRT|url=https://www.edmonton.ca/documents/RoadsTraffic/valley_line_lrt_booklet.pdf|publisher=City of Edmonton|accessdate=July 21, 2017|date=September 2016}} however, it opened on November 4, 2023.{{cite news |date=November 4, 2023 |title=Long-awaited Valley Line Southeast LRT officially opens to passengers |work=CBC |url=https://www.cbc.ca/news/canada/edmonton/valley-line-southeast-open-to-passengers-1.7018586 |access-date=November 4, 2023}}

Around the station

References

{{reflist}}