Border-to-Border Trail

{{Short description|Partially constructed non-motorized trial system in Washtenaw}}

{{Infobox trail

| length = {{convert|38|mi|km}} {{as of|2023|lc=y}}
{{convert|55|mi|km}} planned

| location = Washtenaw County, Michigan

| use = Hiking, cycling

| photo = Border-To-Border Trail marker Superior Township Michigan.JPG

| photo_size = 150

| season = Open year-round, limited winter maintenance

| surface = Asphalt, concrete

| maintainer = Washtenaw County Parks and Recreation Commission

| website = {{official URL}}

| route = {{Border-to-Border trail|inline=1}}

| route_state = uncollapsed

| caption = Trail marker in Superior Township

}}

{{Use mdy dates|date=June 2024|cs1-dates=ly}}

The Border-to-Border (B2B) Trail is a partially constructed non-motorized trail system in Washtenaw County, Michigan. The system is planned to cover approximately {{convert|55|mi}}{{Cite web |title=About B2B Trail |url=https://b2btrail.org/about-b2b/ |access-date=2024-06-16 |website=Border to Border |publisher=Washtenaw County Parks and Recreation Commission |language=en-US}} across Washtenaw County, along the Huron River.

Planning for the B2B began in 1984, as the Huron River Greenway, a {{Convert|35|mile|adj=on}} project headed by Washtenaw County. Since its inception, and its renaming to the Border-to-Border trail in the 1990s, the project has expanded its scope and incorporated additional funding from public and private sources.{{Cite web |last=Marshall |first=Brooke |date=2022-10-04 |title=New Pathways |url=https://annarborobserver.com/new-pathways/ |access-date=2024-06-16 |work=Ann Arbor Observer}} When completed, the Border-to-Border Trail system will link Ypsilanti, Ann Arbor, Dexter, and Chelsea with off-street, non-motorized pathways for walking, bicycling, and other recreational activities.

The Border-to-Border Trail connects to multiple existing parks, and incorporates their trail systems. In addition to its route through parks, the B2B also includes segments built adjacent to rural roads, new and historic bridges, and segments on city streets.

History

Planning for a non-motorized trail along the Huron River began in the 1980s, with a City of Ann Arbor study for a "Huron River Greenway."{{Cite web |last=Furlong Reynolds |first=Cynthia |date=2019-11-29 |title=Crossing the Border: After inching along for decades, the Border-to-Border Trail is racing toward the finish line |url=https://annarborobserver.com/crossing-the-border/ |access-date=2024-06-18 |work=Ann Arbor Observer}} The Washtenaw County Parks and Recreation Commission took over the project in the late 1990s, and by 2001, the Border-to-Border Trail was envisioned as a {{Convert|35|mi|km|abbr=|adj=on}} trail from Hudson Mills Metropark to Ford Lake.{{Cite news |last1=Stone-Palmquist |first1=Peri |last2=Weir |first2=Karessa E. |date=2001-07-08 |title=Bike trail plans have miles to go |work=The Ann Arbor News |pages=A1,A7 |via=NewsBank}}

From its inception, the B2B was planned to utilize existing parks and rights-of-way adjacent to the Huron River.{{Cite web |last=Raupagh |first=Brynn W. |date=2017-04-28 |title=Karen's Trail: Karen McKeachie's tragic death is speeding completion of the Border-to-Border Trail |url=https://annarborobserver.com/karens-trail/ |access-date=2024-06-16 |work=Ann Arbor Observer}} In addition to the existing infrastructure, Washtenaw County secured $10 million of funding to construct connections between existing pieces of infrastructure. With the cost of trail construction for even the initial plans far exceeding that sum, construction proceeded slowly, with the first new trail segment opening in 2001 in Ypsilanti.

The scope and pace of the Border-to-Border Trail project increased in the mid-2010s, with the passage of a county roads millage that included dedicated funding for nonmotorized transportation projects. The state of Michigan recognized the B2B project as a component of the statewide Iron Belle Trail in 2015, bringing additional visibility to the project.

The mid-2010s also brought additional private funding to the trail, with expansion plans for a segment from Dexter west to Chelsea. The Huron Waterloo Pathways Initiative, a private foundation that began in Chelsea, raised money from businesses in Chelsea before partnering with the county to accelerate trail construction.

In 2016, champion triathlete Karen McKeachie died in a collision on Dexter-Chelsea Road during a training bicycle ride. McKeachie's death led to renewed advocacy for additional bicycle safety measures in the county, and a portion of the newly-constructed B2B trail near Dexter is named in McKeachie's memory.

Future

The total cost of constructing the trail was estimated at $30 million in 2019, with additional fundraising still under way to fund the entire project.

The most difficult portion of trail construction will be the segment from Hudson Mills Metropark east to Bandemer Park, which closely follows the Huron River and Huron River Drive. {{As of|2024|June}}, planning is underway for this segment, which will include a tunnel under the Michigan Line railroad tracks.{{Cite web |last=Smolcic Larson |first=Lucas |date=2024-03-30 |title=The Border-to-Border Trail is growing in Washtenaw County in 2024. See where |url=https://www.mlive.com/news/ann-arbor/2024/03/the-border-to-border-trail-is-growing-in-washtenaw-county-in-2024-see-where.html |access-date=2024-06-16 |work=MLive}}

The B2B is planned to extend northwards from its two branches in western Washtenaw County, connecting to the Lakelands Trail. The extensions, to Stockbridge and Pinckney, will form a {{Convert|29|mi|km|adj=on}} loop in Washtenaw and Livingston counties. Additional plans for trail construction in Washtenaw County include extensions south to the existing trail systems in Manchester, Saline, and Pittsfield Township.

Route description

File:Ann Arbor July 2024 12 (Border-to-Border Trail).jpg in Ann Arbor]]

The Chelsea branch of the B2B originates in Dexter Township, near the Livingston County line in the northwest corner of the county. The trail follows M-52 south to Chelsea city limits, deviating through Timbertown Park. The B2B uses city streets through Chelsea, and heads due east, paralleling Dexter-Chelsea Road and the Michigan Line railroad tracks to Dexter.{{Cite web |title=Dexter-Chelsea Corridor |url=https://b2btrail.org/explore-the-trail/trail/dexter-chelsea-corridor/ |access-date=2024-06-18 |website=Border to Border |language=en-US}}{{Cite web |title=Chelsea-Stockbridge Corridor |url=https://b2btrail.org/explore-the-trail/trail/chelsea-stockbridge-corridor/ |access-date=2024-06-18 |website=Border to Border |language=en-US}}

The Hudson Mills branch of the B2B originates north of the Hudson Mills Metropark and proceeds south through the park, connecting to the Chelsea branch at Mill Creek Park in Dexter.{{Cite web |title=Hudson Mills Metropark Corridor |url=https://b2btrail.org/explore-the-trail/trail/hudson-mills-metropark-corridor/ |access-date=2024-06-18 |website=Border to Border |language=en-US}}

From Dexter east to Ann Arbor, the B2B follows Huron River Drive in a general southeasterly direction, connecting to Delhi Metropark. The B2B enters Ann Arbor city limits near Barton Nature Area, and is proposed to cross under the Michigan Line tracks in a tunnel to Bandemer Nature Area. From Bandemer east, the trail utilizes city park land along the river, and runs close to the University of Michigan Hospital and the Ann Arbor VA Hospital. Near the VA Hospital, the trail enters Gallup Park, and runs east to Geddes Dam at the Ann Arbor city limits.{{Cite web |title=Ann Arbor-Dexter Corridor |url=https://b2btrail.org/explore-the-trail/trail/ann-arbor-dexter-corridor/ |access-date=2024-06-18 |website=Border to Border |language=en-US}}{{Cite web |title=Ann Arbor Corridor |url=https://b2btrail.org/explore-the-trail/trail/ann-arbor-corridor/ |access-date=2024-06-18 |website=Border to Border |language=en-US}}

The B2B recrosses the Huron River twice at Geddes Dam and Dixboro Road, passing through the campus of Washtenaw Community College. The trail follows the northern edge of the Trinity Health Ann Arbor Hospital campus, and heads due south to the athletic campus of Eastern Michigan University, at Ypsilanti city limits. At the George Gervin GameAbove Center, the trail turns due east and follows a utility right-of-way to the EMU main campus, and through the campus to a path parallel to North Huron River Drive. The B2B uses city streets to Depot Town, where it enters Frog Island and Riverside Parks, and passes through the southern edge of the Water Street site. The trail emerges from parkland at Grove Street, near the site of Woodruff's Grove, the first European settlement in Washtenaw County.{{Cite web |title=Ypsilanti Corridor |url=https://b2btrail.org/explore-the-trail/trail/ypsilanti-corridor/ |access-date=2024-06-18 |website=Border to Border |language=en-US}}{{Cite web |last1=Davis |first1=Jeff |last2=Mann |first2=James |last3=Petty |first3=Gerry |date=2022 |title=Historical Markers & Statues - Ypsilanti, Michigan |url=https://ypsihistory.org/wp-content/uploads/2022/03/Historical-Markers-and-Statues.pdf |access-date=2024-06-17 |work=Ypsilanti Historical Society}}

East of Ypsilanti city limits, in Ypsilanti Charter Township, the B2B follows Grove Street along the north bank of Ford Lake, heading south into North Hydro Park at Ford Lake Dam. The trail terminates at Grove Road and Rawsonville Road, at the Wayne County line. A connection is planned into Van Buren Township, ultimately forming a part of the Iron Belle Trail towards Belle Isle.

Construction progress

class="wikitable sortable collapsible" border="1"

|+ class="nowrap"| Border-to-Border Trail construction progress by segment{{cite web |date=June 2006 |title=Draft Non-Motorized Plan For Washtenaw County |url=http://www.ewashtenaw.org/government/departments/community-planning-resources/pab/pab_packets/NonMotorizedPlan_1 |archive-url=https://web.archive.org/web/20120614184129/http://www.ewashtenaw.org/government/departments/community-planning-resources/pab/pab_packets/NonMotorizedPlan_1 |archive-date=2012-06-14 |website= |publisher=Washtenaw Area Transportation Study}}

scope="col" | Segment

! scope="col" | Project limits

! scope="col" | Length (miles)

! scope="col" | Community

! scope="col" | Funding estimate (year)

! scope="col" | Funding source

! scope="col" | Status

scope="row"| A

| Livingston Co. to Bell Road || 1.7 || Dexter Township || $584,000 (2006) || TBD || Concept{{cite web |url=http://www.ewashtenaw.org/government/departments/parks_recreation/greenways/maps/complete-trail |title=Border to Border Trail Planning Maps |publisher=Washtenaw County Parks and Recreation Commission |access-date=2010-09-15 |archive-url=https://web.archive.org/web/20110808003525/http://www.ewashtenaw.org/government/departments/parks_recreation/greenways/maps/complete-trail |archive-date=2011-08-08 |url-status=dead }}

scope="row"| B

| Bell Road to North Territorial Rd. || 1.3 || Dexter Township || $447,000 (2006) || TBD || Concept

scope="row"| C

| North Territorial Rd. to Dexter || 4.7 || Dexter Township || $1,614,000 (2006) || TBD || See below

scope="row"| C1

| Hudson Mills Metropark Phase 1 || 2.1 || Dexter Township || ? || HCMA, WCPARC, Community foundation for Southeastern Michigan, Michigan Department of Natural Resources || Completed 2008

scope="row"| C2B

| [http://westridgeassociation.org/20081208152406710.pdf Hudson Mills Metropark Phase 2] || 2.0? / 3.0? || Dexter Township || $725,000 || HCMA, WCPARC, Village of Dexter || Planned (2012){{cite web |author=Lisa Carolin |date=August 28, 2010 |title=Work to begin on border-to-border trail section in Dexter |url=http://www.annarbor.com/news/dexter/border-to-border-trail-section-approved-in-dexter/ |url-status=dead |archive-url=https://web.archive.org/web/20100830165515/http://www.annarbor.com/news/dexter/border-to-border-trail-section-approved-in-dexter/ |archive-date=August 30, 2010 |access-date=September 15, 2010 |website=annarbor.com |publisher=}}

scope="row"| C2A

| [http://westridgeassociation.org/20081208152406710.pdf Westridge Subdivision to Warrior Park] || 0.25 || Village of Dexter || ?? || ?? || Completed 2012

scope="row"| D1

| River Terrace Trail, Village of Dexter to Dexter-Huron Metropark || 1.4 || Village of Dexter / Dexter Township || $481,000 (2006) / $990,000 (2010) || WCPARC, others to be determined || Underway (fall 2012){{cite web |url=http://www.metroparks.com/uploads/file/Board%20of%20Commissioners/Meeting%20Minutes/CM%202010_08.pdf |title=MINUTES BOARD OF COMMISSIONERS MEETING HURON-CLINTON METROPOLITAN AUTHORITY |date=August 12, 2010 |editor=Gregory J. Almas |page=4 |publisher=Huron-Clinton Metropolitan Authority |access-date=September 29, 2010 |archive-url=https://web.archive.org/web/20101127003311/http://metroparks.com/uploads/file/Board%20of%20Commissioners/Meeting%20Minutes/CM%202010_08.pdf |archive-date=November 27, 2010 |url-status=dead }}{{cite web |url=http://www.ewashtenaw.org/government/departments/parks_recreation/parksplan/2010-2014/draft/app%20d.pdf |title=WASHTENAW COUNTY PARKS AND RECREATION COMMISSION Parks and Recreation Master Plan 2010 - 2014 Appendix D – Capital Improvement Program for Parks |publisher=Washtenaw County Parks and Recreation Commission |year=2010 |page=143 |access-date=2010-09-29 |archive-url=https://web.archive.org/web/20120612174254/http://www.ewashtenaw.org/government/departments/parks_recreation/parksplan/2010-2014/draft/app%20d.pdf |archive-date=2012-06-12 |url-status=dead}}

scope="row"| D2

| Park Connector Trail, Dexter-Huron Metropark to Delhi Metropark || 2.9 || Scio Township || $996,000 (2006) / $1,500,000 (2012) || TBD || Concept / budgeted for 2012

scope="row"| E

| Delhi Metropark to Tubbs Road || 1.0 || Scio Township || $344,000 (2006) || TBD || Concept{{cite web |url=http://twp-scio.ewashtenaw.org/pdfs/Parks/ |title=SCIO TOWNSHIP PARK, RECREATION, AND OPEN SPACE MASTER PLAN |date=February 2008 |publisher=Scio Township Board of Trustees |page=31 |format=PDF |access-date=2010-09-29 |archive-url=https://web.archive.org/web/20110726043450/https://twp-scio.ewashtenaw.org/pdfs/Parks/ |archive-date=2011-07-26 |url-status=dead}}

scope="row"| F

| Tubbs Road to Maple Road || 1.5 || Scio Township || $515,000 (2006) || TBD || Concept

scope="row"| G

| Maple Road to Barton Pond || 2.2 || Ann Arbor City || $756,000 (2006) || TBD || Concept

scope="row"| H

| Ann Arbor West Barton Pond to Mitchell Field || 3.0 || City of Ann Arbor || $1,030,000 (2006) || ?? || Partially complete{{cite web |url=http://www.a2gov.org/government/communityservices/ParksandRecreation/Documents/bike.pdf |title=City of Ann Arbor Bikeway System |page=1 |publisher=Ann Arbor Parks and Recreation Department }}

scope="row"| H?

| Bandemer Park Railroad Tunnel from Bandemer Park to Barton Park Bridge || ?? || City of Ann Arbor || $2,555,595 (2010) || City of Ann Arbor || Unfunded{{cite web |url=http://www.a2gov.org/government/publicservices/systems_planning/capitalimprovements/Documents/FY2011-2016%20CIP/FY2011-CIP_FullDocument_FINAL.pdf |title=CITY OF ANN ARBOR FY2011–2016 CAPITAL IMPROVEMENTS PLAN (CIP) (Adjustments to FY2010–2015 CIP) |year=2010 |publisher=City of Ann Arbor |page=2 of ExistingApprovedCombined.pdf |access-date=2010-09-29 |archive-url=https://web.archive.org/web/20110723151751/http://www.a2gov.org/government/publicservices/systems_planning/capitalimprovements/Documents/FY2011-2016%20CIP/FY2011-CIP_FullDocument_FINAL.pdf |archive-date=2011-07-23 |url-status=dead }}

scope="row"| I

| Ann Arbor East Mitchell Field to Dixboro Road || 3.0 || City of Ann Arbor || $1,030,000 (2006) || ?? || Complete{{cite web |url=http://www.a2gov.org/government/communityservices/ParksandRecreation/Documents/bike.pdf |title=City of Ann Arbor Bikeway System |page=1 |publisher=Ann Arbor Parks and Recreation Department }}

scope="row"| J

| Dixboro Road to Hewitt Road || 2.5 || Ann Arbor Township/Ypsilanti Township || $858,000 (2006) || WCPARC Community foundation for Southeastern Michigan Michigan Department of Transportation || Completed 2004{{cite web |url=http://www.ewashtenaw.org/government/departments/parks_recreation/greenways/greenway%20update |title=Greenway Update -- Official Website of Washtenaw County, MI |year=2010 |publisher=Washtenaw County Parks and Recreation Commission |access-date=2010-09-15 |archive-url=https://web.archive.org/web/20100924162924/http://www.ewashtenaw.org/government/departments/parks_recreation/greenways/greenway%20update |archive-date=2010-09-24 |url-status=dead }}

scope="row"| J?

| Washtenaw Community College || 0.32 || ?? || ?? || WCPARC || Completed 2008

scope="row"| K

| Hewitt Road to Michigan Avenue || 2.5 || City of Ypsilanti || $858,000 (2006) || City of Ypsilanti, Michigan Department of Natural Resources || Partially complete{{cite web |url=http://www.ewashtenaw.org/government/departments/parks_recreation/forms%20and%20publications/brochure/brochure_b2b.pdf |title=Border-to-Border Trail: Trail Map: Ypsilanti Area: East Ann Arbor to Washtenaw/Wayne County Line |page=3 |publisher=Washtenaw County Parks and Recreation Commission |access-date=2010-09-15 |archive-url=https://web.archive.org/web/20100729004818/http://www.ewashtenaw.org/government/departments/parks_recreation/forms%20and%20publications/brochure/brochure_b2b.pdf |archive-date=2010-07-29 |url-status=dead }}

scope="row"| K1

| Hewitt Road, Eastern Michigan University (EMU) Rail Trail to Huron River Drive, Huron River Drive to Westview with connection to the Rail Trail || 0.75 || City of Ypsilanti || ?? || WCPARC and EMU || Completed 2009

scope="row"| K2

| EMU Rail Trail reconstruction, Hewitt to Cornell and extension to EMU Student Union || 0.75 || City of Ypsilanti || ?? || WCPARC and EMU || Completed 2008 and 2009

scope="row"| L

| Michigan Avenue to Ford Lake || 1.5 || City of Ypsilanti || $515,000 (2006) || TBD || Partially complete

scope="row"| L?

| [http://bordertoborder.intuitwebsites.com/FOBO_Spring_2010_Update.doc Bike bridge under the Michigan Avenue Bridge] || ?? || City of Ypsilanti || $500,000 (2010) || TBD || Concept{{cite web |url=http://bordertoborder.intuitwebsites.com/FOBO_Spring_2010_Update.doc |title=Friends of the Border to Border Trail Spring 2010 Newsletter |date=Spring 2010 |author=Bob Krzewinski |format=DOC |page=2 |publisher=Friends of the Border to Border Trail}}

scope="row"| L1

| I-94 to Ford Lake || 0.2 || Ypsilanti Township || $69,000 (2006) || TBD || Partially complete

scope="row"| L?

| Grove Road || 0.15 || ?? || ?? || WCPARC || Complete

scope="row"| L?

| [https://web.archive.org/web/20120610050812/http://www.ewashtenaw.org/government/departments/parks_recreation/news/2005/border_to_border.html River's Edge Park], also known as [http://bordertoborder.intuitwebsites.com/Water-Street-Trail-Project.html Water Street Trail] || 1.0 || City of Ypsilanti || ?? || City of Ypsilanti, Community Foundation for Southeastern Michigan, WCPARC / Volunteers || On hold / gravel trail complete{{cite web |author= |date=September 24, 2010 |title=Trail through Water Street property in Ypsilanti ready for citizen use |url=http://www.annarbor.com/news/ypsilanti/trail-through-water-street-property-ready-for-citizen-use/ |website=annarbor.com |publisher=}}

scope="row"| M

| Ford Lake to Wayne County || 4.0 || Ypsilanti Township || $1,373,000 (2006) || TBD || Partially complete

scope="row"| M1

| Ypsilanti Township, Hydro Park North/Bridge Road (bike lanes) || 0.33 || Ypsilanti Township || $159,000 || Ypsilanti Township, Hydro Park North/Bridge Road || Scheduled to complete in 2011 as part of another overlap project{{cite web |url=http://www.ewashtenaw.org/government/departments/parks_recreation/commission/minutes/2010/july-2010/view |title=Washtenaw County Parks and Recreation Commission Minutes of Meeting |editor=Jimmie Maggard |date=July 13, 2010 |publisher=Washtenaw County Parks and Recreation Commission |format=PDF |page=5 }}{{Dead link|date=June 2019 |bot=InternetArchiveBot |fix-attempted=yes}}

scope="row"| M2

| Bridge Road/Textile to Wayne County Border || 1.0 || Ypsilanti Township || $197,000 || WCPARC || Scheduled to complete in 2010

References