Bucharest Metro Line M5

{{Short description|Metro line in Bucharest, Romania}}

{{Infobox rail line

| box_width =

| name = Line M5

| other_name =

| native_name =

| native_name_lang =

| color = {{rcr|RATB|m5}}

| logo = Metrorex logo.svg

| logo_width = 50px

| logo_alt =

| image = Valea_Ialomiței_după_deschidere.jpg

| image_width = 265px

| image_alt =

| caption = M5 Valea Ialomiței metro station

| type = Rapid transit

| system = Bucharest Metro

| status = Operational

| locale =

| start = Râul Doamnei or Valea Ialomiței

| end = Eroilor

| stations = 10

| routes =

| daily_ridership =

| ridership2 =

| planopen =

| open = {{Start date|2020|09|15|df=y}}

| event1label =

| event1 =

| operator =

| character =

| depot =

| stock = Bombardier Movia 346, Alstom Metropolis

| linelength_km =

| linelength_mi =

| linelength =

| tracklength_km =

| tracklength_mi =

| tracklength =

| tracks =

| gauge = {{Track gauge|1432mm|lk=on}}

| old_gauge =

| load_gauge =

| minradius =

| racksystem =

| routenumber =

| linenumber =

| electrification = {{750 V DC|conductor=y}}

| speed_km/h =

| speed_mph =

| speed =

| signalling =

| elevation_m =

| elevation =

| website =

| map = {{M5 Line|inline=1}}

| map_name =

| map_state = uncollapsed

| embedded =

}}

M5 is the newest of the five lines of the Bucharest Metro, opened on 15 September 2020. In the first phase ({{convert|6.87|km|mi|1|abbr=on}}), it runs from Eroilor to Râul Doamnei, and to Valea Ialomiței, in the Drumul Taberei neighbourhood.

File:Bucharest Metro stationed in Eroilor 2 Station.jpg]]

History

In 2011, construction started on the first section of the M5.[http://www.metrorex.ro/_read170-1 Metrorex Press release 15 March 2011] {{in lang|ro}}[http://www.metrorex.ro/_read178-1 Metrorex Press release 15 April 2011] {{in lang|ro}} The expected construction cost was €708.6 million.{{cite web |url=https://ec.europa.eu/regional_policy/en/projects/major/romania/extension-of-bucharest-metro-line-5 |title=Extension of Bucharest Metro Line 5 |website=ec.europa.eu |access-date=2020-09-21}} Opened on 15 September 2020, the first section, Râul Doamnei to Eroilor is around {{convert|7|km|mi|abbr=on}} long with 10 stations.

After that, the line will be extended to Iancului, and from there under Iancului Road (Șoseaua Iancului) until it reaches the Pantelimon station of M1.

Rolling stock

Until 2023, when new Alstom Metropolis French trains for this line are meant to arrive, 8 Canadian Bombardier Movia 346 train sets are used, redistributed from M3.

Stations

{{Rapid transit OSM map

| system_qid = Q1641397

| stations = yes

| frame-width = 750

| frame-height = 470

| length = yes

| single_line=y

| text=Bucharest M5

}}

File:Metro București.svg

class="wikitable"
PhaseTerminalsLengthStationsConstructorConstruction sinceOpening
rowspan="2" |IRâul DoamneiEroilorrowspan="2"| 6.9 km9Astaldi-FCC-AB Construct-Delta ACMrowspan="2"|April 2011rowspan="2" |15 September 2020
1

| RomancierilorValea Ialomiței

1Max Bögl
rowspan="2" |IIEroilorUniversitaterowspan="2"| 5.4 km3-rowspan="2"| TBArowspan="2"|2025 (est.)
UniversitateIancului3-
IIIIanculuiPantelimon3.8 km6-On hold2032 (est.)

Sources: metrorex.ro,{{Cite web|url=http://www.metrorex.ro/Resurse/RaportActivitate/METROREX%20rom%202018.pdf|title=Metrorex (2018). Details for M5 at page 46|publisher=Metrorex.ro|access-date=2020-09-21}} adevarul.ro,[http://adevarul.ro/news/bucuresti/mai-putine-statii-magistrala-5-metrou-tronsonul-universitate-pantelimon-1_52f0e14fc7b855ff5610c00e/index.html Mai puține stații în magistrala 5 de metrou tronsonul Universitate-Pantelimon] {{in lang|ro}} wall-street.ro{{Cite web|url=https://www.wall-street.ro/articol/Auto/237846/in-ce-stadiu-este-proiectul-metroului-pana-la-pantelimon-si-cand-ar-putea-fi-gata.html|title=În ce stadiu este proiectul metroului pâna la Pantelimon și când ar putea fi gata?|language= ro}}

References

{{Reflist}}