Bucharest Metro Line M6

{{Short description|Future Metro Line in Bucharest}}

{{M6 Line}}

M6 is an under construction metro line of the Bucharest Metro. The M6 Line will connect Bucharest North railway station ({{lang|ro|Gara de Nord}}) to Henri Coandă International Airport ({{lang|ro|Aeroportul Otopeni}}). The line is expected to be completed by 2028.{{cite news|last1=Chirileasa|first1=Andrei|title=Romania pays for Bucharest airport subway link with money from emissions trading|url=http://www.romania-insider.com/romania-pays-for-bucharest-airport-subway-link-with-money-from-emissions-trading/147785/|access-date=7 March 2016|agency=Romania Insider|date=29 April 2015|archive-url=https://web.archive.org/web/20150716232918/http://www.romania-insider.com/romania-pays-for-bucharest-airport-subway-link-with-money-from-emissions-trading/147785/|archive-date=16 July 2015|url-status=dead}} As of 2019, only the section from 1 Mai station to Tokyo station had secured funding.{{cite web|url= https://www.railwaygazette.com/projects-and-planning/tenders-called-for-bucureti-metro-line-m6/48221.article|title=Tenders called for București metro Line M6|website=Railway Gazette International|date=19 March 2019|access-date=8 April 2020}} On March 8, 2022, the contract for construction was signed; the contract for the second section — from Tokyo station to the airport — was signed on May 2, 2023.

Construction work has effectively started on December 15, 2023, for the first section between the 1 Mai station of M4 and the future Tokyo station.

Cost

The construction of the new line is estimated to cost around 1.2 billion. The Japan Bank for International Cooperation is financing the project with €300 million.[http://www.railwayinsider.eu/wp/?p=20178&lang=ro Metrorex demarează licitațiile pentru linia de metrou către Aeroportul Otopeni] {{in lang|ro}}

Stations

The M6 Line will have a total of 16 stations: 4 stations shared with the existing M4 Line and 12 planned new stations: Pajura, Expoziției, Piața Montreal, Gara Băneasa, Aeroport Băneasa, Tokyo, Washington, Paris, Bruxelles, Otopeni, Ion I.C. Brătianu, and Aeroport Otopeni.{{cite news|url=http://m.mediafax.ro/social/metrorex-metroul-din-drumul-taberei-va-circula-de-la-mijlocul-anului-viitor-cand-vor-incepe-lucrarile-la-linia-de-metrou-otopeni-15751045|title=Metrorex: Metroul din Drumul Taberei va circula de la mijlocul anului viitor. Când vor începe lucrările la linia de metrou Otopeni|publisher=Mediafax|date=29 September 2016|language=ro}}

class="wikitable"
PhaseTerminalsLengthTotal stationsConstruction sinceOpening
IGara de Nord1 Mai (as part of M4){{convert|3.6|km|mi|abbr=on}}419892000
II1 Mai – Tokyo{{convert|6.6|km|mi|abbr=on}}6December 2023{{cite web | url=https://clubferoviar.ro/metroul-de-otopeni-doi-ani-de-la-semnarea-contractului-la-eliberarea-autorizatiei-de-construire/| title=Metroul de Otopeni: Doi ani de la semnarea contractului la eliberarea autorizației de construire| date=13 December 2023}}2027 (est.)
IIITokyo – Otopeni Airport{{convert|7.6|km|mi|abbr=on}}6March 20252028{{cite web | url=https://www.profit.ro/insider/guvernul-extinde-pana-2032-acord-imprumut-japonia-magistrala-metrou-m6-statiile-tokyo-aeroport-henri-coanda-cheltuit-11-ani-8-5-milioane-euro-consultanta-20563253 | title=Metrou - Guvernul extinde cu mult, până în 2032, un împrumut cu Japonia pentru linia Aeroport Henri Coandă, din care a cheltuit în 11 ani doar 8,5 milioane de euro pe consultanță }} (est.)

References

{{reflist}}

{{Bucharest Metro navbox}}

{{Transport in Bucharest}}

Category:Bucharest Metro Lines

Category:Proposed rail infrastructure in Romania

{{Bucharest-metro-stub}}