Bukit Kiara MRT station
{{Short description|Rapid transit station in Malaysia}}
{{Infobox station
| style = Rapid KL
| name = {{KLRT code|KG|12A}} {{KLRT code|CC|01}} Bukit Kiara Selatan
| type = File:Rapid KL Logo.svg {{!}} Future MRT station
| image =
| image_caption =
| address = Damansara Link, Bukit Kiara, Kuala Lumpur
| country = Malaysia
| coordinates = {{coord|3|8|2.35|N|101|39|4.86|E|display=title,inline}}
| owned = MRT Corp
| line = {{rint|my|9}} {{rcb|KLRT|9|xroute}}
{{rint|my|13}} {{rcb|KLRT|13|xroute}}
| platform =
| tracks = 4
| other =
| structure = Elevated
| parking = Not available
| bicycle = Not available
| accessible =
| status = Planning
| code = {{KLRT code|KG|12A}} {{KLRT code|CC|01}}
| zone =
| opened =
| opening = 2027 (Kajang Line)
December 2028 (Circle Line)
| rebuilt =
| electrified =
| mpassengers =
| passengers =
| pass_system =
| pass_year =
| pass_percent =
| services = {{Adjacent stations
|system=Rapid KL
|line1=Kajang|left1=Phileo Damansara|note-mid1=Future service|right=Pusat Bandar Damansara
|line2=Circle|left2=UM|right2=Sri Hartamas}}
| logo =
| logo_size =
| image_size =
| baggage_check =
}}
The Bukit Kiara Selatan MRT station, previously known as the Bukit Kiara MRT Station, is a future mass rapid transit (MRT) station on the MRT Circle Line and MRT Kajang Line.{{Cite web |title=mrt3-proposed-line-latest-from-Pian-2147 |url=https://assets.theedgemarkets.com/pictures/20220315-mrt3-proposed-line-latest-from-Pian-2147.png |access-date=15 March 2022 |website=The Edge Markets}} The proposed site for the station will be located in between {{mrts|Phileo Damansara}} and {{mrts|Pusat Bandar Damansara}} stations. The station is expected to be built as an interchange for both of the lines with constructions slated to begin in 2023. It will be an elevated station under the working name of Bukit Kiara South.{{Cite web|last=|title=MASS RAPID TRANSIT LINE 3: CIRCLE LINE - DRAFT|url=https://i.ibb.co/FxyrKN2/77d16c60-bcb5-465c-9c1e-65c220a5e675-jpeg.jpg|url-status=usurped|access-date=1 September 2021|archive-url=https://web.archive.org/web/20210906125912/https://i.ibb.co/FxyrKN2/77d16c60-bcb5-465c-9c1e-65c220a5e675-jpeg.jpg |archive-date=2021-09-06 }}
Location
Bukit Kiara South station is planned to be to the south of the Bukit Kiara suburban area, where it would serve nearby administration buildings, convention centers, a small residential community, sports complexes and the Royal Selangor Club. The station location is also within the reach of the Medan Damansara residential area.{{cite map |url=https://www.google.com.my/maps/@3.1339857,101.6513506,208m/data=!3m1!1e3?hl=en |title=Bukit Kiara MRT Station |website=Google Maps |accessdate=16 November 2018 |quote="The station location are marked by the two extra curbs on both sides of the track."}}
History
In 2006, initial plans were to construct an LRT line from Kota Damansara to Cheras, serving areas such as TTDI, Section 17, Section 16 and Bukit Damansara which are near Bukit Kiara.{{cite news| title=Kota Damansara-Cheras Rail Line Right on Track | url=https://www.thestar.com.my/news/nation/2008/06/15/kota-damansaracheras-rail-line-right-on-track/ | work=The Star| date=15 June 2008| url-status=dead| archiveurl=https://web.archive.org/web/20181027072442/https://www.thestar.com.my/news/nation/2008/06/15/kota-damansaracheras-rail-line-right-on-track/ | archivedate=27 October 2018 | df=dmy-all}} The planned termini have since been extended to Sungai Buloh and Kajang in 2009 to provide a convenient interchange to the KTM lines and to boost development in Sungai Buloh.{{cite news| title=Additional routes for Cheras-Kota Damansara line| url=http://www.theedgeproperty.com/opinion/2528-additional-routes-for-cheras-kota-damansara-line-sector-report-overweight.html| publisher=TheEdgeDaily| date=9 April 2010 |accessdate=30 October 2018 |url-status=dead |archiveurl=https://web.archive.org/web/20120303052612/http://www.theedgeproperty.com/opinion/2528-additional-routes-for-cheras-kota-damansara-line-sector-report-overweight.html |archivedate=3 March 2012}} In 2010, the line plan has been altered to be a rapid transit line which costs RM36 billion.{{cite news| title= KL to have MRT system, say sources| url= http://www.theedgeproperty.com/news-a-views/3529-kl-to-have-mrt-system-say-sources.html| work= The Edge| date= 7 June 2010| access-date= 16 November 2018| archive-url= https://web.archive.org/web/20120303052659/http://www.theedgeproperty.com/news-a-views/3529-kl-to-have-mrt-system-say-sources.html| archive-date= 3 March 2012| url-status= dead}}{{cite news| title=LRT, MRT, what's next? Bullet Train?| url=http://www.theedgeproperty.com/news-a-views/3530-lrt-mrt-whats-next-bullet-train-construction-sector-june-7-2010-.html| publisher=The Edge (OSK)| date=7 June 2010| access-date=16 November 2018| archive-url=https://web.archive.org/web/20170403110418/http://www.theedgeproperty.com/news-a-views/3530-lrt-mrt-whats-next-bullet-train-construction-sector-june-7-2010-.html| archive-date=3 April 2017| url-status=dead}}{{cite news| title=RM30b MRT plan| url=http://www.nst.com.my/nst/articles/RM30bMRTplan/Article/##ixzz0qKFQIc6G| work=The New Straits Times| date=8 June 2010| url-status=dead| archiveurl=https://web.archive.org/web/20100611055431/http://www.nst.com.my/nst/articles/RM30bMRTplan/Article| archivedate=11 June 2010| df=dmy-all}}
After the 2011 public displays, it was announced that Bukit Kiara is to be a future station, located between Phileo Damansara and Pusat Bandar Damansara stations.{{cite web|last=transitmy|title=MRT Update: MyRapidTransit launching & public viewing on 8 July 2011 at KL Convention Centre|url=http://transitmy.org/2011/07/07/mrt-update-myrapidtransit-launching-public-viewing-on-8-july-2011-at-kl-convention-centre/|publisher=Malaysian Transit|accessdate=11 July 2011|url-status=dead|archiveurl=https://archive.today/20120720174504/http://transitmy.org/2011/07/07/mrt-update-myrapidtransit-launching-public-viewing-on-8-july-2011-at-kl-convention-centre/|archivedate=20 July 2012|df=dmy-all}} Construction began on the MRT line in 2012 with marks placed along the tracks for the future station site.{{Cite news| title= MRT project moves into active construction phase| url=http://biz.thestar.com.my/news/story.asp?file=/2012/8/2/business/11776262&sec=business| work=The Star| date=2 August 2012}} The first phase of the line opened on 16 December 2016 which skips the site.{{cite web |url=https://www.mymrt.com.my/events/mrt-sungai-buloh-kajang-line-begins-operations/ |title=MRT Sungai Buloh–Kajang Line Begins Operations |website=MyMRT |accessdate=16 November 2018 |url-status=live |archivedate=16 November 2018 |archiveurl=https://web.archive.org/web/20181116143713/https://www.mymrt.com.my/events/mrt-sungai-buloh-kajang-line-begins-operations/}}
The MRT Circle Line was planned with an interchange here, between Pusat Sains Negara and PPUM stations. However, it has been scrapped since May 2018 due to shortage of funds.{{cite web|title=Possible segment of MRT Circle Line at Ekspo Negaraku 2017|url=https://i.imgur.com/3b24FWph.jpg|accessdate=9 February 2018}}{{cite news|title=Govt scraps MRT 3 project|url=https://www.thestar.com.my/news/nation/2018/05/30/govt-scraps-mrt-3-project/|accessdate=30 May 2018|work=The Star Online|publisher=Star Media Group Berhad|date=30 May 2018}}
A revival was then announced in November 2020 for the MRT Circle Line project, with plans to build the Bukit Kiara MRT station along with other stations for the loop line. Constructions are expected to begin in 2023 and it will be opening in stages, starting with Phase 1 which will include Bukit Kiara.{{Cite web|last=|title=MASS RAPID TRANSIT LINE 3: CIRCLE LINE - DRAFT|url=https://i.ibb.co/FxyrKN2/77d16c60-bcb5-465c-9c1e-65c220a5e675-jpeg.jpg|url-status=usurped|access-date=1 September 2021|archive-url=https://web.archive.org/web/20210906125912/https://i.ibb.co/FxyrKN2/77d16c60-bcb5-465c-9c1e-65c220a5e675-jpeg.jpg |archive-date=2021-09-06 }}
Planned services
The MRT Kajang Line is currently having a typical frequency of 7 to 9 minutes during off-peak hours, equivalent to 6 to 9 trains per hour (tph).{{cite web |url=https://www.myrapid.com.my/traveling-with-us/how-to-travel-with-us/rapid-kl/mrt/train-frequency |title= MRT operated by RapidKL - Train Frequency |accessdate=16 November 2018 |url-status=live |website=MyRapid |archiveurl=https://web.archive.org/web/20181116150104/https://www.myrapid.com.my/traveling-with-us/how-to-travel-with-us/rapid-kl/mrt/train-frequency |archivedate=16 November 2018}} Trains run non-stop between Phileo Damansara and Pusat Bandar Damansara where it is nearer to the former.
References
{{reflist}}
Category:Proposed rail infrastructure in Malaysia
Category:Sungai Buloh-Kajang Line
{{Klang Valley train stations|state=collapsed}}