Bulgana Green Power Hub

{{Use Australian English|date=November 2019}}

{{Use dmy dates|date=November 2019}}

{{Infobox power station}}

Bulgana Green Power Hub is a wind farm north of Stawell in the Australian state of Victoria. The project is owned by Neoen. Construction of the 56 wind turbines, with a total generation capacity of 194MW, was completed in August 2019,{{cite news |url=https://www.araratadvertiser.com.au/story/6334218/bulgana-green-power-hub-works-progress/ |title=All 56 wind turbines have been installed at the Landsborough site |date=19 August 2019 |first=JessieAnne |last=Gartlan |newspaper=Ararat Advertiser |access-date=12 November 2019}}{{cite news |url=https://www.stawelltimes.com.au/story/5903571/progress-continues-at-bulgana-green-power-hub-photos-video/ |newspaper=Stawell Times-News |date=13 February 2019 |first=Lachlan |last=Williams |title=First wind turbine installed at Bulgana Green Power Hub |access-date=12 November 2019}} and connections to the national grid reached full capacity in 2021.{{cite news|first1=Sonali|last1=Paul|access-date=2022-01-29|title=Neoen says Australian wind farm hits full tilt, two years behind plan|url=https://www.reuters.com/markets/commodities/neoen-says-australian-wind-farm-hits-full-tilt-two-years-behind-plan-2021-12-29/|newspaper=Reuters|date=2021-12-29|via=www.reuters.com}}

90% of the energy is contracted for supply to the Government of Victoria.{{cite web |url=https://bulganagreenpowerhub.com.au/bulgana-signs-mou-with-victorian-government/ |title=Bulgana signs MoU with Victorian Government |date=27 June 2017 |publisher=Neoen |access-date=12 November 2019}} The Engineering, procurement, and construction contract and 25 years of maintenance is with Siemens Gamesa Renewable Energy.

References

{{reflist}}

{{Energy in Victoria}}

{{Wind farms in Australia}}

{{Victoria-stub}}

Category:Wind farms in Victoria (state)