Channel Islands Electricity Grid

The Channel Islands Electricity Grid (CIEG) is the joint company set up in 1998 between Guernsey Electricity and Jersey Electricity to operate and manage the submarine cables between mainland Europe and the Channel Islands.

The grid physically comprises a network of high voltage (90 kV, 3-phase, 50 Hz) submarine and underground cables linking the French electricity grid to the electricity systems on the islands of Jersey and Guernsey.{{Cite web |date=2017 |title=Implementation of a system integrity protection scheme in the Channel Islands |url=https://www.researchgate.net/publication/321202546 |access-date=}} The grid enables electricity generated from renewable sources in France to be transmitted to Jersey and Guernsey.

Development

The CIEG is continuing to develop the undersea cable network with additional subsea cables between the islands and France being devised{{cn|date=May 2021}} to give both Guernsey and Jersey greater security and better affordability, as they will give the islands the opportunity to increase the amount of imported energy.

Long term agreements with Électricité de France (EdF) ensure the imported electricity is low carbon.{{cite web |url=http://www.sustainableguernsey.info/blog/2013/05/channel-islands-electricity-grid-strengthened-with-new-agreement/ |title= Channel Island grid strengthened |publisher=Sustainable Guernsey |date=29 May 2013}} Ninety percent of Guernsey’s electricity is imported from the grid.{{Cite web |title=Channel Islands Electricity Grid |url=https://library.e.abb.com/public/6e3b8cadb22a8e4fc1257b0c005527b7/815_CIEG_Referenz.pdf}}

Co-operating through the CIEG means the islands can work together towards improving the reliability of the grid system.

Cable connections

class="wikitable sortable"
Name

!Type

Operational periodRouteDistanceCapacityStatusNotes
Normandie 2{{cite web |url=http://www.4coffshore.com/windfarms/interconnector-normandie-2-icid46.html |title=Normandie 2 |publisher= 4C Offshore}}

|Submarine

2000–presentSaint-Rémy-des-Landes,(fr) [http://clients.rte-france.com/lang/fr/visiteurs/services/actualites.jsp?id=1381&mode=detail Présentation de la seconde interconnexion électrique entre l'île de Jersey et la France] website rte-france.com France to Archirondel, Jersey{{convert|17|km|mi}}style="text-align: right;" | 90 MWOperationalCable contains fibre optic cables
GJ1{{cite web |url=http://www.4coffshore.com/windfarms/interconnector-channel-islands-electricity-grid-jersey-guernsey-1-(gj1)-icid47.html |title=GJ1 |publisher=4C Offshore}}

|Submarine

2000–2018

2019-present
Queen's Road, Jersey to Barkers Quarry, Guernsey{{convert|37.4|km|mi}}style="text-align: right;" | 60 MWOperationalCable contains 3 fibre optic cables of 24 fibres each, ceased working in 2018 after 2 faults.
Replaced in 2019 at a cost of £30m.{{cite web |title=Guernsey's supply of green electricity |url=https://www.nkt.com/references/guernsey-s-supply-of-green-electricity |access-date=22 May 2023}}
Normandie 3{{cite web |url=https://www.bbc.co.uk/news/world-europe-jersey-27622690 |title=New Jersey electricity cable 'will be more secure' |publisher=BBC |date=30 May 2014}}

|Submarine

2014–presentArmanville (Pirou), France to Grouville Bay Jersey then to South Hill sub-station{{convert|32|km|mi}} (+ 17 km overland in France and 7 km overland in Jersey)style="text-align: right;" | 100 MWOperational
Normandie 1{{cite web |url=https://www.jec.co.uk/about-us/latest-news/je-signs-contract-for-third-£40m-french-cable-link/ |title=Jersey Electricity signs contract for third power cable |publisher=JE}}

|Submarine

2017–present

|Surville to Archirondel, Jersey

{{convert|27|km|mi}} (+ 2 km overland in France)style="text-align: right;" | 100 MWOperationalWork started in 2016.{{cite web |url=https://www.electricity.gg/news/undersea-cable-laying-starts-on-new-link-to-france/ |title=Undersea Cable laying starts on new link to France |publisher=GE}} Follows same route as EDF1 at a cost of £40m it became operational in February 2017.
GJ2{{cite web |url=http://www.4coffshore.com/windfarms/interconnector-channel-islands-electricity-grid-jersey-guernsey-2-(gj2)-icid81.html |title=GJ2 |publisher=4C Offshore}}

|Submarine

Jersey to Petit Bot, Guernsey{{convert|38|km|mi}}100 MWpending
GF1{{cite web |title=Talks under way on direct cable link with France |url=https://guernseypress.com/news/2021/05/06/talks-under-way-on-direct-cable-link-with-france/ |date=6 May 2021}}

|Submarine

Vale, Guernsey to La Manche, France{{convert|54|km|mi}}pending
FAB Link{{cite web |url=http://www.transmissioninvestment.com/projects/02/ |title=The France-Alderney-Britain ("FAB") project |publisher=Transmission Investment |date=}}

|Submarine

France to Alderney to Britain (FAB Link){{convert|220|km|mi}}style="text-align: right;" | 1,400 MWsuspended
EDF1{{cite web |url=http://www.jersey.com/english/discoverjersey/aboutjersey/practical-information/Pages/Electricity.aspx |title=The Channel Island Electricity Grid (CIEG) |date=15 March 2021 |publisher=Visit Jersey}}

|Submarine

1984 - 2012Surville, France to Archirondel,Jersey{{convert|27|km|mi}}50 MWRemovedFaulty cable lifted in 2016 for recycling{{cite web |url=http://guernseypress.com/news/2016/04/23/faulty-undersea-cable-removed-ready-for-powerful-replacement/ |title=Faulty undersea cable removed ready for powerful replacement |publisher=Guernsey press |date=23 April 2016}}
|Underground

|

|Archirondel substation to South Hill substation via Rue des Pres substation, Jersey

|

|

|Operational

|

|Underground

|

|Archirondel substation to Queen's Road substation, Jersey

|

|

|Operational

|

|Underground

|

|South Hill s/s to Queen's Road s/s via St. Helier West s/s, Jersey

|

|

|Operational

|

|Underground

|

|South Hill s/s to Western Primary s/s, Jersey

|

|

|Operational

|

|Underground

|

|Western Primary s/s to Queen's Road s/s, Jersey

|

|

|Operational

|

|Underground

|

|Queen's Road to Greve de Lecq, Jersey (GJ1)

|

|

|Operational

|

|Underground

|

|Barkers Quarry to Bellegreve, Guernsey

|

|

|Operational

|

Future

  • Possible - France to Guernsey {{cite web |url=http://guernseypress.com/news/2015/11/04/direct-power-cable-to-france-needed-guernsey-electricity/ |title=Direct power cable to France needed – Guernsey Electricity |publisher=Guernsey Press |date=4 Nov 2015}}
  • Unlikely - Guernsey to Sark {{cite web |url=http://guernseypress.com/news/2015/03/27/prove-you-can-pay-6m-for-power-cable-tr-tells-sark/ |title=Prove you can pay £6m. for power cable, T&R tells Sark |publisher=Guernsey Press |date=27 Mar 2015}}

See also

References