Coquitlam Dam
{{Short description|Dam in Coquitlam, British Columbia, Canada}}
{{Infobox dam
| name =Coquitlam Dam
| image =
| image_caption =
| name_official =
| dam_crosses =Coquitlam River
| res_name =Coquitlam Lake
| location = Coquitlam, British Columbia
| operator = BC Hydro
| dam_length =290 m
| dam_height =31 m
| dam_width_base =
| construction_began =
| opening = 1914
| cost =
| res_capacity_total =
| res_catchment =
| res_surface = 1100 ha
| coordinates = {{coord|49|21|14|N|122|46|37|W|region:CA-BC_type:landmark|display=inline,title}}
| extra =
}}
Coquitlam Dam is a hydraulic fill embankment dam on the Coquitlam River in the city of Coquitlam, British Columbia. Although it has no powerhouse of its own, its waters divert to Buntzen Lake, making it part of BC Hydro's electrical generation infrastructure.BC Hydro: [http://www.bchydro.com/bcrp/about/docs/ch08_final.pdf Coquitlam River and Buntzen Lake Watersheds] {{webarchive|url=https://web.archive.org/web/20071013113112/http://www.bchydro.com/bcrp/about/docs/ch08_final.pdf |date=2007-10-13 }} Retrieved on 22 February 2009 It is also one of the main reservoirs for the Greater Vancouver Water District. BC Hydro has released a new document in March 2018 that addresses emergency preparedness and outlines the areas effected should the dam fail as a result of an extreme earthquake event.{{Cite web|url=https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/safety/March-2018-Coquitlam-Dam-Emergency-Prep-Map.pdf|title=Coquitlam Dam Emergency Flood Map|last=|first=|date=|website=|archive-url=|archive-date=|access-date=}}
History
The first Coquitlam Dam, built to raise the water level of Coquitlam Lake by five feet, was begun in April 1904, and completed in 1905. It was built to protect the water supply to powerhouses on Indian Arm, via a tunnel to Buntzen Lake, and also supplied water to New Westminster.Will Koop: [http://www.belcarra.ca/reports/Coquitlam_Watershed_History.pdf Coquitlam Watershed History] {{Webarchive|url=https://web.archive.org/web/20061007112849/http://www.belcarra.ca/reports/Coquitlam_Watershed_History.pdf |date=2006-10-07 }} Retrieved on 22 February 2009 By 1906 the original dam was discovered to be leaking, and while repairs were made the leak continued through 1908, until a second dam was completed in 1914. At the time of the tunnel's completion, it was the longest power diversion tunnel in the world. Due to seismic concerns, an embankment dam was built on the downstream side of the original rockfill dam in 2008.BC Hydro: [http://www.bchydro.com/planning_regulatory/projects/coquitlam_dam_seismic_upgrade.html Coquitlam Dam Seismic Upgrade] {{webarchive|url=https://web.archive.org/web/20090215012647/http://bchydro.com/planning_regulatory/projects/coquitlam_dam_seismic_upgrade.html |date=2009-02-15 }} Retrieved 12 March 2009
The Port Moody-Coquitlam Railway, no longer operating, was built to assist with the dam's construction.
References
{{reflist}}
External links
- [https://web.archive.org/web/20150919124901/http://www.bchydro.com/content/dam/hydro/medialib/internet/images/places/bc_hydro_facilities/coquitlam/coquitlam_lake_dam0.jpeg Aerial image of dam, BC Hydro]
- https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/safety/March-2018-Coquitlam-Dam-Emergency-Prep-Map.pdf
{{IBWaterDiv}}
Category:Geography of Coquitlam
Category:Buildings and structures in Coquitlam
Category:Dams in British Columbia
Category:Dams completed in 1914
Category:Publicly owned dams in Canada
{{GVRD-geo-stub}}
{{dam-stub}}