Datunludong station

{{short description|Beijing Subway interchange station}}

{{Infobox station

| name = Datunludong

| native_name = 大屯路东

| native_name_lang = zh-Hans

| symbol_location = beijing

| symbol = subway

| image = Northbound platform of L5 Datunlu East Station (20210207113710).jpg

| caption = Line 5 northbound platform
300px
Line 15 platform

| mlanguage =

| other_name = Datundong{{cite web|url=https://news.sina.com.cn/c/2004-03-12/15232033948s.shtml|title=北京密织轨道交通网 地铁10号线二期规划亮相|date=2004-03-12|author=北京晚报|archive-url=http://web.archive.org/web/20040315164148/http://news.sina.com.cn:80/c/2004-03-12/15232033948s.shtml|archive-date=2004-03-15|quote=立水桥站、立水桥南站、北苑西站、大屯东站、惠新西桥站、北土城东路站、和平西桥站}}{{cite web|url=http://www.rertr.anl.gov/meeting_announcements/2009meeting/beijingsubw.pdf|archive-url=http://web.archive.org/web/20100528003616/http://www.rertr.anl.gov/meeting_announcements/2009meeting/beijingsubw.pdf|website=Argonne National Laboratory|title=Beijing Subway Plan 2008|archive-date=2010-05-28}} (大屯东)

| address = Beiyuan Road ({{lang|zh|北苑路}}) and Datun Road ({{nowrap|{{lang|zh|大屯路}}}})

| borough = Datun Subdistrict, Chaoyang District, Beijing

| country = China

| map_type = Beijing

| map_caption = Location in central Beijing

| coordinates = {{coord|40.003841|N|116.417377|E|format=dms|type:railwaystation_region:CN-11_source:Gaode|display=it}}

| operator = Beijing Mass Transit Railway Operation Corporation Limited

| line = {{plainlist|1=

  • {{rail color box|system=BJS|line=5|inline=yes}}
  • {{rail color box|system=BJS|line=15|inline=yes}}}}

| platforms = 4 (1 island platform and 2 side platforms)

| tracks = 4

| structure = Elevated (Line 5)
Underground (Line 15)

| accessible = Yes

| opened = {{start date and age|2007|10|07}} (Line 5)
{{start date and age|2015|12|26}}
(Line 15)

| services = {{Adjacent stations|system1=BJS

|line1=5|left1=Beiyuanlubei|right1=Huixin Xijie Beikou

|line2=15|left2=Anli Lu|right2=Guānzhuang

}}

}}

Datunludong station{{cite web|url=https://www.bjsubway.com/jpg.html|title=JPG格式线路图下载|archive-url=https://web.archive.org/web/20240102011720/https://www.bjsubway.com/jpg.html|archive-date=2024-01-02|access-date=2024-05-11}} ({{zh|s=大屯路东站|t=大屯路東站|p=Dàtúnlù Dōng Zhàn}}) is an interchange station of Line 5 and Line 15 on the Beijing Subway.

History

{{stack|File:大屯路东站换乘改造20151023-1.JPG}}

The line 5 station opened on October 27, 2007. It was too small to handle the interchange between line 5 and 15, so the line 15 station was left unopened when the western extension was opened in December 2014. From October to December 2015, the line 5 station was closed to widen the station and build a transfer corridor.{{cite web |title=10月17日起5号线蒲黄榆站、大屯路东站因换乘改造施工临时封站 |url=https://www.bjsubway.com/news/qyxw/yyzd/2015-10-12/2748.html |website=Beijing Subway |access-date=2020-09-18 |language=zh |archive-date=2020-05-08 |archive-url=https://web.archive.org/web/20200508114852/https://www.bjsubway.com/news/qyxw/yyzd/2015-10-12/2748.html |url-status=dead }} The line 15 station opened on December 26, 2015,{{cite web |title=两条地铁线今日试运营 |url=http://bjrb.bjd.com.cn/html/2015-12/26/content_340398.htm |website=Beijing Daily |access-date=2020-09-18 |archive-url=https://web.archive.org/web/20151227013727/http://bjrb.bjd.com.cn/html/2015-12/26/content_340398.htm |archive-date=2015-12-27 |language=zh |url-status=dead}} one year later than the other stations on the line.

Station layout

The line 5 station has 2 elevated side platforms. The line 15 station has an underground island platform.

Exits

There are 5 exits in operation, lettered A1, B1, B2, G, and H2. Exits A1, B1 and G are accessible.

Exit H1 is under planning.

Gallery

Datunlu east.jpg|Line 5 platform before renovation

Hall_of_datunlu_east.jpg|Line 15 station hall

大屯路东站15号线站台.JPG|Line 15 platform

Concourse of L5 Datunlu East Station (20210403163827).jpg|Line 5 concourse after renovation

Concourse of L15 Datunlu East Station (20210403163410).jpg|Line 15 concourse

References

{{reflist}}