Design quality indicator

{{Short description|Design quality toolkit}}

{{Redirect|DQI|the first video game of the Dragon Quest video game series|Dragon Quest (video game)}}

{{Use dmy dates|date=August 2021}}

The Design Quality Indicator (DQI) is a toolkit to measure, evaluate and improve the design quality of buildings.

Development of DQI was started in the United Kingdom by the Construction Industry Council (CIC) in 1999.Page 6, Spencer, N. and Winch, G. (2002). How Buildings add value for clients, London: Thomas Telford. {{ISBN|0-7277-3128-9}} It was initiated in response to the success of Key Performance Indicators devised for assessing construction process issues such as timely completion, financial control and safety on site by the construction industry's Movement for Innovation (M4I). The aim of the DQI systems was to ensure that the M4I's indicators of construction process were balanced by an assessment of the building as a product.Macmillan, S. (2004) Preface to Designing Better Buildings: quality and value in the built environment, London: Spon Press. {{ISBN|0-415-31525-5}} The Science Policy Research Unit at the University of Sussex was commissioned to develop the indicator tool, which was launched as an online resource on 1 October 2003.Construction Industry Council. [http://www.dqi.org.uk/DQI/Common/031001_Launch.pdf DQI Online – How well is your building designed?] 1 October 2003 In 2004 the DQI received recognition from the British Institute of Facilities Management for the role of involving users in the design process.{{cite web|url=http://www.elsalvadorproject.org.uk/maps/downloads/2004/IStructE%20online.pdf|title=DQI online service gets recognition from BIFM – The Structural Engineer|date=2 November 2004|website=elsalvadorproject.org.uk|access-date=8 September 2009|archive-url=https://web.archive.org/web/20111008210600/http://www.elsalvadorproject.org.uk/maps/downloads/2004/IStructE%20online.pdf|archive-date=8 October 2011|url-status=dead}} The DQI tool was made available to users in the United States in 2006, and an online American version was launched on 20 October 2008.

Unlike its forerunner the Housing Quality Indicator (HQI) system devised for the UK's Department for the Environment, Transport and the Regions (DETR) by the consultancy DEGW and published on open access in February 1999,Wheeler, P. (2004) 'Housing quality indicators in practice' in Macmillan, S. (2004) Designing Better Buildings: quality and value in the built environment, London: Spon Press. {{ISBN|0-415-31525-5}} the DQI system instead could be used only by approved facilitators. The criteria and the method of assessment, which though unacknowledged is a simple form of multi-attribute utility analysis, remained inaccessible to design teams and their clients unless they employed a facilitator licensed to use it. Guidance on using the HQI system can be found on the government website.{{cite web|url=https://www.gov.uk/guidance/housing-quality-indicators|title=Housing quality indicators - GOV.UK|website=gov.uk|date=7 March 2023 }} The DQI version for hospitals is also on open access on the national archive.http://webarchive.nationalarchives.gov.uk/20130124042007/http://www.dh.gov.uk/prod_consum_dh/groups/dh_digitalassets/@dh/@en/documents/digitalasset/dh_082085.pdf {{Bare URL PDF|date=March 2022}}

Conceptual framework

DQI applies a structured approach to assess design quality based on the model by the architect Vitruvius, the Roman author of the earliest surviving theoretical treatise on building in Western culture, who described design in terms of utilitas, firmitas and venustas, often translated as commodity, firmness and delight.Gann et al. (2003), Design Quality Indicator as a tool for thinking: Building Research and Information, London: Spon Press. {{doi|10.1080/0961321032000107564}} DQI uses a modern-day interpretation of these terms as:

  • Functionality (utilitas) – the arrangement, quality and interrelationship of spaces and how the building is designed to be useful to all.
  • Build Quality (firmitas) – the engineering performance of the building, which includes structural stability and the integration, safety and robustness of the systems, finishes and fittings.
  • Impact (venustas) – the building's ability to create a sense of place and have a positive effect on the local community and environment.

Methodology

DQI is completed by a range of stakeholders in the briefing and design stages of a building project, or on a completed building. Stakeholders who participate include:

DQI is applied in a facilitated workshop that is led by a certified DQI facilitator.

References

{{reflist}}

Other references

  • Whyte, J and Gann, D (2003), Design Quality Indicators: work in progress: Building Research and Information, London: Spon Press. {{doi|10.1080/0961321032000107537}}
  • Markus, T. (2003), Lessons from the Design Quality Indicator: Building Research and Information, London: Spon Press. {{doi|10.1080/0961321032000088016}}
  • Thomson at al. (2003), Managing value and quality in design: Building Research and Information, London: Spon Press. {{doi|10.1080/0961321032000087981}}
  • Prasad, S. (2004) 'Inclusive maps', in Designing Better Buildings: quality and value in the built environment edited by Macmillan, S. London: Spon Press {{ISBN|0-415-31525-5}}
  • Dickson, M. (2004) 'Achieving quality in building design by intention', in Designing Better Buildings: quality and value in the built environment edited by Macmillan, S. London: Spon Press {{ISBN|0-415-31525-5}}
  • Whyte, J Gann, D and Salter, A (2004) 'Building indicators of design quality', in Designing Better Buildings: quality and value in the built environment edited by Macmillan, S. London: Spon Press {{ISBN|0-415-31525-5}}
  • Prasad, S. (2004), Clarifying intentions: the design quality indicator: Building Research and Information, London: Spon Press. {{doi|10.1080/0961321042000312376}}
  • Cole, R. (2005), Building environmental assessment methods: redefining intentions and roles: Building Research and Information, London: Spon Press. {{doi|10.1080/09613210500219063}}
  • Kaatz, E., Root, D. and Bowen, P (2005), Broadening project participation through a modified building sustainability assessment: Building Research & Information, London: Spon Press. {{doi|10.1080/09613210500219113}}
  • Commission for Architecture and the Built Environment (2009), [http://www.cabe.org.uk/case-studies/international-digital-laboratory Case study: International Digital Laboratory, University of Warwick, Coventry]
  • Commission for Architecture and the Built Environment (2009), [http://www.cabe.org.uk/case-studies/maples Case study: Maples Respite Centre, Harlow, Essex]
  • Commission for Architecture and the Built Environment (2009), [http://www.cabe.org.uk/case-studies/st-nicholas Case study: St Nicholas Church of England Primary School, Essex]
  • Commission for Architecture and the Built Environment (2009), [http://www.cabe.org.uk/case-studies/centre-for-conservation Case study: British Library Centre for Conservation, London]
  • Commission for Architecture and the Built Environment (2009), [http://www.cabe.org.uk/case-studies/frederick-bremer Case study: Frederick Bremer School, Waltham Forest London]

{{Design}}

Category:Construction

Category:Architectural design