Duber Khwar Hydroelectric Plant

{{Short description|Hydroelectric power station in Khyber Pakhtunkhwa, Pakistan}}

{{Infobox dam

|name = Duber Khwar Hydropower Plant

|image =

|name_official = Duber Khwar Hydropower Plant

| location_map =Pakistan

| location_map_size =

| location_map_caption =

| coordinates = {{coord|35|7|9.82|N|072|55|38.51|E|type:landmark|display=inline,title}}

|dam_crosses = Duber Khwar River

|location = Pattan, Kohistan, KPK, Pakistan

|dam_type = Gravity, roller-compacted concrete

|dam_length = {{convert|202|m|ft|abbr=on}}

|dam_height = {{convert|40.5|m|ft|abbr=on}}

|dam_width_base =

|construction_began = June 2003

|opening = June 2013

|status = Operational

|owner = Water and Power Development Authority (WAPDA)

| plant_name = Duber Khwar Hydroelectric Plant

| plant_coordinates = {{coord|35|6|17.98|N|72|59|39.02|E|type:landmark}}

| plant_operator =WAPDA

| plant_commission =January 2014

| plant_decommission =

| plant_type =

| plant_turbines =2 x 65 MW Pelton-type

| plant_capacity =130 MW

| plant_annual_gen =595GWh

|extra =

}}

The Duber Khwar Hydropower Plant is located near the town of Pattan in Kohistan, Khyber Pakhtunkhwa, Pakistan on the Duber Khwar River, a right bank tributary of the Indus River. It is approximately 340 km NW from Islamabad, the federal capital of Pakistan.{{Cite web |title=Duber Khwar Hydropower Project: Updated as on 31.05.2014 |url=http://www.wapda.gov.pk/htmls/duberkpj.html |url-status=dead |archive-url=https://web.archive.org/web/20140707073015/http://wapda.gov.pk/htmls/duberkpj.html |archive-date=7 July 2014 |access-date=22 March 2014 |website=Water & Power Development Authority}}

The total electricity generation capacity of the Duber Khwar project is 130 MW. There are two vertical Pelton wheel turbine units of 65 MW installed at the Duber Khwar Hydroelectric Station. These turbines are manufactured by Andritz Hydro Austria.{{Cite web |date=6 January 2014 |title=First Unit at Pakistan's 130-MW Duber Khwar Hydroelectric Plant Generating Power |url=http://www.hydroworld.com/articles/2014/01/first-unit-at-pakistan-s-130-mw-duber-khwar-hydroelectric-plant-generating-power.html |url-status=dead |website=HydroWorld.com |access-date=22 March 2014 |archive-date=22 March 2014 |archive-url=https://web.archive.org/web/20140322043730/http://www.hydroworld.com/articles/2014/01/first-unit-at-pakistan-s-130-mw-duber-khwar-hydroelectric-plant-generating-power.html }} Andritz Hydro Austria supplied and installed the complete electro-mechanical equipment and services with a focus on its "water to wire" concept. The supplies consisted of two 65 MW Pelton-type turbines with a rated head of 516 m, associated generators and generator auxiliaries and the complete electrical power systems.{{Cite news |date=4 January 2014 |title=30MW Duber Khwar Hydropower Project Starts Test Production |work=The Nation |agency=Associated Press of Pakistan |url=http://www.nation.com.pk/business/04-Jan-2014/30mw-duber-khwar-hydropower-project-starts-test-production |url-status=dead |access-date=22 March 2014 |archive-date=29 April 2014 |archive-url=https://web.archive.org/web/20140429184817/http://www.nation.com.pk/business/04-Jan-2014/30mw-duber-khwar-hydropower-project-starts-test-production }}

Construction of the Duber Khwar Hydropower Plant commenced in June 2003, and the project was completed in June 2013. The plant began commercial operations in January 2014. The total cost of the project was about PKR 16.325 billion. At its completion, the Duber Khwar hydropower project was projected to generate 595 million units of low-cost hydel electricity per annum.{{Cite news |author=Munawar Hasan |date=1 March 2014 |title=Duber Khwar Hydropower Project Completed |work=The News International |url=http://www.thenews.com.pk/Todays-News-3-235461-Duber-Khwar-hydropower-project-completed |url-status=dead |access-date=22 March 2014 |archive-url=https://web.archive.org/web/20140322160558/http://www.thenews.com.pk/Todays-News-3-235461-Duber-Khwar-hydropower-project-completed |archive-date=22 March 2014}}

Dam

Type: Concrete gravity dam
Length: 202 m.
Height: 40.5 m.
Design Discharge: 29 cusecs
Headrace tunnel length: 4.873 km
Design head: 535 m.{{Cite web |title=Pakistan, Duber Khwar Hydropower Project |url=http://eng.sinohydro.com/index.php?m=content&c=index&a=show&catid=42&id=105 |url-status=dead |archive-url=https://web.archive.org/web/20140322073553/http://eng.sinohydro.com/index.php?m=content&c=index&a=show&catid=42&id=105 |archive-date=22 March 2014 |access-date=22 March 2014 |website=Sinohydro}}