Elizabeth Quay railway station

{{Short description|Railway station in Perth, Western Australia}}

{{Use Australian English|date=January 2012}}

{{Use dmy dates|date=November 2020}}

{{Redirect-distinguish|Esplanade railway station|The Esplanade railway station|Esplanade MRT station|Esplanade metro station}}

{{Infobox station

| name = Elizabeth Quay

| type =

| style = Transperth

| image = Elizabeth Quay Station, Western Australia, November 2023 01.jpg

| caption = Main station entrance and building, November 2023

| address = Mounts Bay Road & William Street, Perth

| borough = Western Australia

| country = Australia

| coordinates = {{coord |region:AU-WA_type:railwaystation_dim:{{wikidata |property |qualifier |raw |P625 |P2386 |format=%q}} |name={{wikidata |property |P1448 }} |display=inline,title |format=dms}}{{EditAtWikidata|pid=P625}}

| elevation =

| distance = {{convert|0.6|km|0}} from Perth Underground

| line = {{plainlist|1=

  • {{rcb|Transperth|YAN|inline=yes}}
  • {{rcb|Transperth|MAN|inline=yes}}

}}

| connections = {{plainlist|1=

}}

| structure = Underground

| platform = 1 island platform with 2 platform edges

| depth =

| levels =

| tracks = 2

| bicycle =

| opened = 15 October 2007

| closed =

| rebuilt =

| accessible = Yes

| owned = Public Transport Authority

| operator = Transperth Train Operations

| zone = 1/{{abbr|FTZ|Free transit zone}}

| former = Esplanade (2007–2016)

| passengers = 11,860 per day

| pass_year = October 2017

| services = {{Adjacent stations|system=Transperth

|line1=YAN|through-left1=MAN|right1=Perth Underground|type1=All/K/W

|line2=MAN|right2=Perth Underground|left2=Canning Bridge|to-left2=Cockburn Central or Mandurah|type2=All, W|to-right2=Perth Underground

}}

| mapframe = yes

| mapframe-caption = Location of Elizabeth Quay station

| mapframe-stroke-colour = #C60C30

| mapframe-stroke-width = 3

| mapframe-marker = rail-underground

| mapframe-marker-colour = #009D58

| mapframe-zoom = 13

}}

Elizabeth Quay railway station, also known as Esplanade station prior to 2016, is an underground railway station on the southern side of the Perth central business district in Western Australia.

Description

File:Elizabeth Quay Station, Western Australia, November 2023 04.jpg

Elizabeth Quay station is surrounded by Mounts Bay Road to the north, William Street to the east, and Elizabeth Quay bus station to the west. The adjacent stations are Perth Underground station to the north and Canning Bridge station to the south. The station is owned by the Public Transport Authority.{{cite web |title=Public Transport Authority: Railway System: April 2019 |url=https://pta.wa.gov.au/Portals/15/AA_DOCUMENTS/Our_system/Freight%20network/PTA%20Rail%20Network%20Map_2019.pdf |website=Public Transport Authority |access-date=26 October 2023 |archive-date=24 July 2019 |archive-url=https://web.archive.org/web/20190724085310/https://www.pta.wa.gov.au/Portals/15/AA_DOCUMENTS/Our_system/Freight%20network/PTA%20Rail%20Network%20Map_2019.pdf |url-status=live }}

Elizabeth Quay station has one island platform with two platform faces. The platform is connected to the ground-level concourse by stairs, escalators and a lift. Initially four escalators were planned to be installed, but that was reduced to two to cut costs, with there being room to install more later.{{cite news |last1=Pryer |first1=Wendy |title=Esplanade problems escalate |work=The West Australian |date=17 February 2005 |page=9}} There is one entrance to the station: on the northern side. The station is fully accessible.{{cite web |title=Elizabeth Quay Station |url=https://www.transperth.wa.gov.au/using-transperth/station-facilities/stations-maps?sid=32 |website=Transperth |access-date=27 October 2023}}{{cite web |title=Elizabeth Quay Station – Access Map |url=https://www.transperth.wa.gov.au/timetablePDFs/BusStationMaps/Elizabeth%20Quay%20Station.pdf |website=Transperth |access-date=27 October 2023}} The station initially opened without toilets due to there being toilets at the Esplanade Busport, but by July 2008, public toilets were built at the station due to public demand.{{cite web |title=Question On Notice No. 1650 asked in the Legislative Assembly on 23 November 2006 by Dr J.M. Woollard |url=https://www.parliament.wa.gov.au/parliament/pquest.nsf/e38eea3a0c4bca1b4825718e00182568/00d8a2b206472ab4c825732c00259671 |website=Parliament of Western Australia |access-date=1 November 2023 |date=1 January 2007}}{{cite web |title=New public toilet at Esplanade Train Station |url=https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/New-public-toilet-at-Esplanade-Train-Station-20080706 |website=Media Statements |access-date=1 November 2023 |date=6 July 2008}}

=Artwork=

File:Elizabeth Quay Station, Western Australia, November 2023 13.jpg

There are two pieces of public art at Elizabeth Quay station: Journey as One, by Norma MacDonald, Les MacDonald and Robyn Templeton, and Journey, by The Glow Studio (Jude Bunn). Journey as One is a mosaic made of glass, glass mosaics, ceramic, ceramic tiles, natural stone and aluminium, on the station's southern interior wall. It consists of 12 side-by-side segments which are each {{convert|1.2|m}} wide and {{convert|1.8|m}} high, and "presents a continuous narrative depicting the past, present and future association of the Nyoongar people with the [...] station site.{{cite web |title=Journey as One |url=https://www.pta.wa.gov.au/our-system/public-art#cbp=mediaid411 |website=Public Transport Authority |access-date=27 October 2023}}{{cite web |title=OnTrack: Issue 17 |url=http://www.newmetrorail.wa.gov.au/Portals/0/NMR/Documents/Resources/Publications/On%20Track/OnTrack%20August%202007.pdf |website=New MetroRail |archive-url=https://web.archive.org/web/20070828235832/http://www.newmetrorail.wa.gov.au/Portals/0/NMR/Documents/Resources/Publications/On%20Track/OnTrack%20August%202007.pdf |archive-date=28 August 2007 |page=8 |date=August 2007}} Journey is a plaque which contains abstract imagery relating to the Mandurah line, including the names of stations on the line. During the opening on 23 December 2007, a circular icon was placed on the plaque which commemorates the opening. A similar plaque is located at Mandurah station on the other end of the line.{{cite web |title=Journey |url=https://www.pta.wa.gov.au/our-system/public-art#cbp=mediaid337 |website=Public Transport Authority |access-date=27 October 2023}}

History

=Planning=

Upon opening on 20 December 1992, Yanchep line (then Joondalup line) trains stopped at the above-ground Perth station and continued east of there as the Armadale line. The first South West Metropolitan Railway Master Plan, published in 1999, detailed the route of the future Mandurah line. It would branch off the Armadale line at Kenwick, requiring no new stations in the Perth central business district (CBD).{{sfn|South West Metropolitan Railway Master Plan|1999|loc=Figure 1}} Following the election of the Labor Party to power in the 2001 state election, the route of the Mandurah line was changed. A new master plan was released, outlining the new and more direct route, which travels in a tunnel under the Perth CBD before surfacing and running down the median of the Kwinana Freeway from Perth to Kwinana. The new route had two new stations within the Perth CBD: Perth Underground station, which was known during construction as William Street station, and Elizabeth Quay station, which was known prior to 2016 as Esplanade station, after the nearby road named The Esplanade and the Esplanade Reserve.{{sfn|Perth Urban Rail Development Project – Supplementary Master Plan|2002|p=v, figure 2}} Esplanade station had a predicted number of weekday boardings of 10,000.{{sfn|Perth Urban Rail Development Project – Supplementary Master Plan|2002|p=48}}

=Construction=

New MetroRail was formed in March 2003 to manage the construction of the Mandurah line, among other rail projects in Perth.{{cite web |title=OnTrack: Issue 1 |url=http://www.newmetrorail.wa.gov.au/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202003-03.pdf |website=New MetroRail |access-date=20 August 2023 |archive-url=https://web.archive.org/web/20070829000033/http://www.newmetrorail.wa.gov.au/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202003-03.pdf |archive-date=29 August 2007 |page=1 |date=March 2003}}{{cite web |title=Visionary rail expansion moves from plan to reality |url=https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/Visionary-rail-expansion-moves-from-plan-to-reality-20030320 |website=Media Statements |access-date=26 October 2023 |date=20 March 2003 |archive-date=27 October 2023 |archive-url=https://web.archive.org/web/20231027035707/https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/Visionary-rail-expansion-moves-from-plan-to-reality-20030320 |url-status=live }}

The construction of the Mandurah line, also known as the Southern Suburbs Railway, was divided into eight main packages. Esplanade station was part of Package F, which also included {{convert|700|m}} of bored tunnels, {{convert|600|m}} of cut-and-cover tunnels, the construction of Perth Underground station, the connection of the railway to the rest of the network west of Perth station, and construction of tracks and overhead wiring within the tunnels. This was also known as the City Project.{{sfn|Longhurst|2008|p=309}} Expressions of interest for the Package F contract were called for in March 2003.{{cite web |title=Interest call for inner city rail project |url=https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/Interest-call-for-inner-city-rail-project-20030315 |website=Media Statements |access-date=26 October 2023 |date=15 March 2003 |archive-date=26 October 2023 |archive-url=https://web.archive.org/web/20231026145254/https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/Interest-call-for-inner-city-rail-project-20030315 |url-status=live }} Five consortia submitted expressions of interest by May 2003.{{cite web |title=Construction, tunnelling and rail experts compete for $580million works on Perth-to-Mandurah section of New MetroRail project |url=https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/Construction,-tunnelling-and-rail-experts-compete-for-$580million-works-on-Perth-to-Mandurah-section-of-New-MetroRail-project-20030515 |website=Media Statements |access-date=26 October 2023 |date=15 May 2003 |archive-date=26 October 2023 |archive-url=https://web.archive.org/web/20231026145244/https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/Construction,-tunnelling-and-rail-experts-compete-for-$580million-works-on-Perth-to-Mandurah-section-of-New-MetroRail-project-20030515 |url-status=live }} The contract for the design and construction of Package F was awarded to a joint venture between Leighton Contractors and Kumagai Gumi in February 2004 at a cost of A$324.5{{nbsp}}million.{{sfn|Longhurst|2008|p=309}}{{cite web |title=City section of New MetroRail Project signed |url=https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/City-section-of-New-MetroRail-Project-signed-20040214 |website=Media Statements |access-date=26 October 2023 |date=14 February 2004 |archive-date=26 October 2023 |archive-url=https://web.archive.org/web/20231026145315/https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/City-section-of-New-MetroRail-Project-signed-20040214 |url-status=live }} Leighton Kumagai appointed architecture firm Hassell to design the two stations.{{cite magazine |title=All aboard and right on track: Leighton Kumagai’s New MetroRail City Project |url=https://ancr.com.au/metrorail.pdf |magazine=Australian National Construction Review |access-date=29 October 2023 |page=106 |date=2006 |issn=1449-7344 |issue=7}}

File:TransperthEsplanadeTrainStationConstruction2 gobeirne.jpgs are being installed.|alt=Construction site with two crawler cranes and sheet piles sticking out of the ground. Excavation of the station box has not begun yet. The city is in the background.]]

The construction site for Esplanade station was established in May 2004.{{cite web |title=City Project Site - The Esplanade |url=http://www.newmetrorail.wa.gov.au/Default.aspx?tabid=177 |website=New MetroRail |archive-url=https://web.archive.org/web/20070829035124/http://www.newmetrorail.wa.gov.au/Default.aspx?tabid=177 |archive-date=29 August 2007}} The portion of William Street directly next to Esplanade station was closed during the station's construction.{{cite web |title=OnTrack: Issue 5 |url=http://www.newmetrorail.wa.gov.au/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202004-04.pdf |website=New MetroRail |archive-url=https://web.archive.org/web/20070829000131/http://www.newmetrorail.wa.gov.au/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202004-04.pdf |archive-date=29 August 2007 |page=3 |date=April 2004}} Esplanade station lies on land reclaimed from the Swan River, resulting a challenging environment for digging and tunnelling.{{sfn|Longhurst|2008|p=30}} Before the station could be constructed, a large water main that passed directly through the future station box, {{convert|1|m|0|adj=on}} in diameter, had to be diverted. The water main carried much of the CBD's water supply, so the diversion took place over an Easter long weekend, when demand for water was low.{{sfn|Longhurst|2008|p=30}} By July 2004, sheet piling to form the walls of the station box was underway.{{cite web |title=OnTrack: Issue 6 |url=http://www.newmetrorail.wa.gov.au/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202004-07.pdf |website=New MetroRail |archive-url=https://web.archive.org/web/20070829000009/http://www.newmetrorail.wa.gov.au/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202004-07.pdf |archive-date=29 August 2007 |page=1 |date=July 2004}} This was one of the largest uses of sheet piles in Australia as of the time of construction.{{sfn|Longhurst|2008|p=39}}

File:TransperthEsplanadeTrainStationConstruction4 gobeirne.jpg

On 13 March 2005, the tunnel boring machine (TBM) arrived on site.{{sfn|Longhurst|2008|p=45}} The two bored tunnels between Esplanade station and the Roe Street dive structure were to be dug by the single TBM, which was to be dismantled and transported back to Esplanade station once the first tunnel had been completed.{{cite web |title=OnTrack: Issue 8 |url=http://www.newmetrorail.wa.gov.au/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202005-04.pdf |website=New MetroRail |archive-url=https://web.archive.org/web/20070828235454/http://www.newmetrorail.wa.gov.au/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202005-04.pdf |archive-date=28 August 2007 |page=6 |date=April 2005 |url-status=dead}} On 14 August, it was craned into the Esplanade station box, and on 25 October, the TBM began tunnelling north towards Perth Underground station and the Roe Street dive structure.{{sfn|Longhurst|2008|p=XVII}}{{cite web |title=Tunnel Boring Machine begins digging under Perth city |url=https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/Tunnel-Boring-Machine-begins-digging-under-Perth-city-20051025 |website=Media Statements |access-date=1 November 2023 |date=25 October 2005}} The first tunnel was completed in June 2006 when the TBM reached the dive structure next to Roe Street.{{cite web |title=OnTrack: Issue 13 |url=http://www.newmetrorail.wa.gov.au/Portals/0/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202006-07.pdf |website=New MetroRail |archive-url=https://web.archive.org/web/20070828235346/http://www.newmetrorail.wa.gov.au/Portals/0/NMR/Documents/Resources/Publications/On%20Track/OnTrack%202006-07.pdf |archive-date=28 August 2007 |pages=1, 4 |date=July 2006}}{{cite web |title=Perth to Mandurah rail project hits milestone |url=https://www.abc.net.au/news/2006-06-04/perth-to-mandurah-rail-project-hits-milestone/1769264 |website=ABC News |access-date=1 November 2023 |date=4 June 2006}} Tunnelling was completed on 24 October 2006 when the TBM reached the Roe Street dive structure for the second time.{{sfn|Longhurst|2008|p=XVII}}{{cite web |title=Final breakthrough of CBD tunnel achieves engineering feat |url=https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/Final-breakthrough-of-CBD-tunnel-achieves-engineering-feat-20061027 |website=Media Statements |access-date=1 November 2023 |date=27 October 2006}} By the end of 2006, most structural work had been completed and architectural finishes and electrical and mechanical fit-out had commenced.{{cite web |title=OnTrack: Issue 15 |url=http://www.newmetrorail.wa.gov.au/Portals/0/NMR/Documents/Resources/Publications/On%20Track/OnTrack%20December%202006.pdf |website=New MetroRail |archive-url=https://web.archive.org/web/20070828235135/http://www.newmetrorail.wa.gov.au/Portals/0/NMR/Documents/Resources/Publications/On%20Track/OnTrack%20December%202006.pdf |archive-date=28 August 2007 |page=5 |date=December 2006 |url-status=dead}}

In April 2005, Minister for Planning and Infrastructure Alannah MacTiernan announced that the New MetroRail project completion date had been delayed from December 2006 to April 2007.{{cite web |title=Revised timetable for New MetroRail |url=https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/Revised-timetable-for-New-MetroRail-20050427 |website=Media Statements |access-date=26 October 2023 |date=27 April 2005 |archive-date=26 October 2023 |archive-url=https://web.archive.org/web/20231026145847/https://www.wa.gov.au/government/media-statements/Gallop-Labor-Government/Revised-timetable-for-New-MetroRail-20050427 |url-status=live }}{{cite news |last1=Williams |first1=Ruth |title=Alannah's train derails |work=The West Australian |date=28 April 2005 |page=5}} In April 2006, she announced that the project's opening date had been delayed to July 2007.{{cite web |title=Budget and timetable review of New MetroRail project |url=https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/Budget-and-timetable-review-of-New-MetroRail-project-20060412 |website=Media Statements |access-date=26 October 2023 |date=12 April 2006 |archive-date=26 October 2023 |archive-url=https://web.archive.org/web/20231026145838/https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/Budget-and-timetable-review-of-New-MetroRail-project-20060412 |url-status=live }} In April 2007, MacTiernan revealed another delay, this time with the likely opening date being October 2007.{{cite web |last1=Spagnolo |first1=Joe |title=Mandurah rail delay likely |url=https://www.perthnow.com.au/news/wa/mandurah-rail-delay-likely-ng-5de1cf72fb61c6ad80c139d3afa69060 |website=PerthNow |access-date=26 October 2023 |date=27 April 2007 |archive-date=20 January 2022 |archive-url=https://web.archive.org/web/20220120061049/https://www.perthnow.com.au/news/wa/mandurah-rail-delay-likely-ng-5de1cf72fb61c6ad80c139d3afa69060 |url-status=live }}

The first test train ran through the tunnels on 11 August 2007.{{cite web |title=Our history |url=https://www.pta.wa.gov.au/about-us/our-role/our-history#2001-to-2010-24 |website=Public Transport Authority |access-date=27 October 2023 |archive-date=16 October 2021 |archive-url=https://web.archive.org/web/20211016074956/https://www.pta.wa.gov.au/about-us/our-role/our-history#2001-to-2010-24 |url-status=live }} The City Project achieved practical completion in September 2007, and was handed over from the contractor to the PTA on 10 September.{{cite web |title=City tunnel project completion announced. |url=https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/City-tunnel-project-completion-announced.-20070908 |website=Media Statements |access-date=26 October 2023 |date=8 September 2007 |archive-date=26 October 2023 |archive-url=https://web.archive.org/web/20231026150326/https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/City-tunnel-project-completion-announced.-20070908 |url-status=live }} From 7 October to 14 October 2007, the Fremantle and Joondalup lines were shut down to connect the tunnel tracks to the rest of the network.{{sfn|Longhurst|2008|p=XVII}} From 15 October, Joondalup line services began running via Perth Underground and Esplanade station, marking the opening of those stations to passenger service.{{sfn|Longhurst|2008|p=XVII}}{{cite web |title=Perth's new underground railway stations ready for action. |url=https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/Perth%27s-new-underground-railway-stations-ready-for-action.-20071014 |website=Media Statements |access-date=26 October 2023 |date=14 October 2007 |archive-date=26 July 2023 |archive-url=https://web.archive.org/web/20230726105743/https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/Perth%27s-new-underground-railway-stations-ready-for-action.-20071014 |url-status=live }}{{cite web |title=Perth CBD's first underground train station in operation |url=https://www.abc.net.au/news/2007-10-15/perth-cbds-first-underground-train-station-in/698954 |website=ABC News |access-date=26 October 2023 |date=15 October 2007 |archive-date=22 July 2022 |archive-url=https://web.archive.org/web/20220722034601/https://www.abc.net.au/news/2007-10-15/perth-cbds-first-underground-train-station-in/698954 |url-status=live }} Mandurah line services south of Esplanade station commenced on 23 December 2007.{{sfn|Longhurst|2008|p=XVII}}{{cite web |title=All aboard as the new Perth-to-Mandurah Railway begins |url=https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/All-aboard-as-the-new-Perth-to-Mandurah-Railway-begins-20071223 |website=Media Statements |access-date=26 October 2023 |date=23 December 2007 |archive-date=26 October 2023 |archive-url=https://web.archive.org/web/20231026150355/https://www.wa.gov.au/government/media-statements/Carpenter-Labor-Government/All-aboard-as-the-new-Perth-to-Mandurah-Railway-begins-20071223 |url-status=live }}

=Rename=

File:Elizabeth Quay railway station, seen from Central Park, January 2021.jpg. Bus lanes for the Elizabeth Quay bus station are visible as well.|alt=View from a skyscraper of a curved roof that fully covers the station. Next to the station is a busway that enters and exits Elizabeth Quay bus station. East of the station are buildings being constructed at Elizabeth Quay.]]

Esplanade station was renamed Elizabeth Quay station on 31 January 2016, two days after the opening of the nearby Elizabeth Quay inlet, which replaced the Esplanade Reserve. Esplanade bus station was renamed Elizabeth Quay bus station as well, and Transperth ferries moved from stopping at the Barrack Street Jetty to stopping at the nearby Elizabeth Quay Jetty.{{cite web |title=Smart names for Elizabeth Quay stations |url=https://www.pta.wa.gov.au/news/media-statements/smart-names-for-elizabeth-quay-stations |website=Public Transport Authority |access-date=27 October 2023 |date=12 November 2015}}{{cite web |last1=McNeill |first1=Heather |title=Elizabeth Quay opening celebrations to last three weeks |url=https://www.watoday.com.au/national/western-australia/elizabeth-quay-opening-celebrations-to-last-three-days-20160120-gmae84.html |website=WAtoday |access-date=27 October 2023 |date=21 January 2016}} The cost of the renaming was estimated to be $700,000, which was criticised by the state opposition as a waste of money.{{cite web |last1=Kagi |first1=Jacob |title=WA Government attacked for costly renaming of Elizabeth Quay bus and train station |url=https://www.abc.net.au/news/2015-12-16/government-criticised-over-elizabeth-quay-train-station-renaming/7035242 |website=ABC News |access-date=27 October 2023 |date=16 December 2015}} Planning Minister John Day said the renaming was done to "make the precinct easily identifiable for locals and visitors", and that "it makes sense to have a consistent precinct, similar to Sydney's Circular Quay and the nearby train station."

=Other=

The escalators at Elizabeth Quay station, which were manufactured by Otis Worldwide, have had severe reliability issues since the station opened. In 2020, the escalators were replaced, seven years before the end of their expected life.{{cite web |last1=Emerson |first1=Daniel |title=Escalators keep going down |url=https://thewest.com.au/news/wa/escalators-keep-going-down-ng-ya-391244 |website=The West Australian |access-date=26 October 2023 |date=5 June 2015 |archive-date=26 October 2023 |archive-url=https://web.archive.org/web/20231026150811/https://thewest.com.au/news/wa/escalators-keep-going-down-ng-ya-391244 |url-status=live }}{{cite web |title=Escalator Maintenance Program: PUG and EQ escalator update |url=https://www.pta.wa.gov.au/projects/completed-projects/escalator-maintenance-program#PUG-AND-EQ-443 |website=Public Transport Authority |access-date=26 October 2023 |archive-date=23 October 2023 |archive-url=https://web.archive.org/web/20231023122458/https://www.pta.wa.gov.au/projects/completed-projects/escalator-maintenance-program#PUG-AND-EQ-443 |url-status=live }}

Services

File:Esplanade station platforms.jpg

Elizabeth Quay station is served by Transperth Yanchep line and Mandurah line services, which are operated by the PTA via its Transperth Train Operations division.{{cite web |title=Transperth |url=https://www.pta.wa.gov.au/our-services/transperth |website=Public Transport Authority |access-date=26 October 2023 |archive-date=5 October 2021 |archive-url=https://web.archive.org/web/20211005173906/https://www.pta.wa.gov.au/our-services/transperth |url-status=live }}{{cite web |title=About Transperth |url=https://www.transperth.wa.gov.au/about-us |website=Transperth |access-date=26 October 2023 |archive-date=8 October 2021 |archive-url=https://web.archive.org/web/20211008135913/https://www.transperth.wa.gov.au/about-us |url-status=live }} The Yanchep and Mandurah lines form one continuous line. The service between Elizabeth Quay and Perth Underground stations is considered part of the Joondalup and Mandurah lines simultaneously. South of Elizabeth Quay station are Mandurah line services and north of Perth Underground station are Yanchep line services.{{cite web |title=Train System Map |url=https://www.transperth.wa.gov.au/Portals/0/Asset/Documents/Using%20Transperth/Transperth%20System%20Map.pdf |website=Transperth |access-date=26 October 2023 |archive-date=16 August 2022 |archive-url=https://web.archive.org/web/20220816063012/https://www.transperth.wa.gov.au/Portals/0/Asset/Documents/Using%20Transperth/Transperth%20System%20Map.pdf |url-status=live }}

Yanchep and Mandurah line trains run at a five-minute frequency during peak hour and a fifteen-minute frequency outside peak and on weekends and public holidays. At night, trains are half-hourly or hourly. The earliest trains depart at 5:32{{nbsp}}am on weekdays and Saturdays and 7:19{{nbsp}}am on Sundays. The latest trains depart at 12:17{{nbsp}}am on weeknights and 2:17{{nbsp}}am on weekend nights.{{cite web |title=Joondalup Line Train Timetable |url=https://www.transperth.wa.gov.au/timetablepdfs/Joondalup%20Line%2020231120.pdf |website=Transperth |access-date=26 October 2023 |date=20 November 2023}}{{cite web |title=Mandurah Line Train Timetable |url=https://www.transperth.wa.gov.au/timetablepdfs/Mandurah%20Line%2020231120.pdf |website=Transperth |access-date=26 October 2023 |date=20 November 2023}}

In the 2013–14 financial year, the station had 3,311,932 boardings.{{cite web |title=Question On Notice No. 4245 asked in the Legislative Assembly on 25 June 2015 by Mr M. Mcgowan |url=https://parliament.wa.gov.au/parliament/pquest.nsf/viewLAPQuestByDate/83179454975BA57448257E6E00292EBA |website=Parliament of Western Australia |access-date=26 October 2023 |archive-date=15 April 2023 |archive-url=https://web.archive.org/web/20230415020621/https://www.parliament.wa.gov.au/parliament/pquest.nsf/viewLAPQuestByDate/83179454975BA57448257E6E00292EBA |url-status=live }} On an average weekday in October 2017, Elizabeth Quay station had 11,860 boardings.{{cite web |last1=Perpitch |first1=Nicolas |title=Welcome to Seaforth — the loneliest train station on the Perth rail network |url=https://www.abc.net.au/news/2018-03-13/perth-least-and-most-used-train-stations-seaforth/9540522 |website=ABC News |access-date=27 October 2023 |date=13 March 2018}}

References

{{Reflist}}

=Book sources=

{{commons}}

  • {{cite book |last1=Longhurst |first1=Derek |title=48 months, 48 minutes: Building the Perth to Mandurah Railway |date=2008 |publisher=Rawlhouse Publishing |isbn=0-9587406-8-2 |url=https://catalogue.nla.gov.au/Record/4300108}}
  • {{cite web |title=South West Metropolitan Railway Master Plan |url=http://www.newmetrorail.wa.gov.au/NMR/Documents/Plans/Master%20Plan/SWMR%20MP%20-%20199903%20-%20Complete.zip |website=New MetroRail |archive-url=https://web.archive.org/web/20070829023933/http://www.newmetrorail.wa.gov.au/NMR/Documents/Plans/Master%20Plan/SWMR%20MP%20-%20199903%20-%20Complete.zip |archive-date=29 August 2007 |date=March 1999 |ref={{harvid|South West Metropolitan Railway Master Plan|1999}}}}
  • {{cite web |title=Perth Urban Rail Development Project – Supplementary Master Plan |url=http://www.newmetrorail.wa.gov.au/NMR/Documents/Plans/Master%20Plan/PURD%20MP%20-%20200208%20-%20Supplementary.pdf |website=New MetroRail |archive-url=https://web.archive.org/web/20070829024413/http://www.newmetrorail.wa.gov.au/NMR/Documents/Plans/Master%20Plan/PURD%20MP%20-%20200208%20-%20Supplementary.pdf |archive-date=29 August 2007 |date=August 2002 |isbn=0-7307-2426-3 |ref={{harvid|Perth Urban Rail Development Project – Supplementary Master Plan|2002}}}}

{{Perth landmarks}}

{{Public Transport Authority of Western Australia railway stations|Yanchep=y|Mandurah=y}}

Category:Elizabeth Quay

Category:Yanchep line

Category:Mandurah line

Category:Transperth railway stations

Category:Railway stations in Australia opened in 2007

Category:Railway stations located underground in Perth, Western Australia