Euripus Bridge
{{Infobox bridge
| name =
| native_name = Υψηλή Γέφυρα Ευρίπου
| native_name_lang = el
| image = Chalkida Bridge - Flickr - stefg74.jpg
| image_upright =
| alt =
| caption = The bridge in May 2007
| coordinates =
| os_grid_reference =
| qid =
| refs =
| carries =
| crosses = Euripus Strait
| locale = Chalcis, Euboea, Greece
| starts = Micro Vathi
| ends = Euboea
| official_name = High Bridge of Evripos
(or Euripos or Euripus)
| other_name = New Bridge of Chalkida
| named_for =
| owner =
| maint =
| heritage =
| id =
| id_type =
| website =
| preceded =
| followed =
| design = cable-stayed
| material = concrete
| material1 =
| material2 =
| length = {{convert|694.5|m}} (including approaches)
| width = {{convert|13.50|m|ftin}}
| height = {{convert|34.5|m}}
| depth =
| traversable =
| towpath =
| mainspan = {{convert|215|m}}
| number_spans = 3
| piers_in_water =
| load =
| clearance_above =
| clearance_below =
| lanes = 2 carriageways + 2 pedestrian sidewalks
| life =
| first_length =
| first_diameter =
| second_length =
| second_diameter =
| third_length =
| third_diameter =
| capacity =
| num_track =
| track_gauge =
| structure_gauge =
| electrification =
| architect =
| designer = S. Schleich
| contracted_designer =
| winner =
| engineering =
| builder = Volos Technical Company SA
Hellenic Technodomiki SA
| fabricator =
| begin = {{Start date|1985|05|df=y}}
| complete =
| cost =
| open = {{Start date and age|1993|07|09|df=y}}
| inaugurated =
| rebuilt =
| collapsed =
| closed =
| replaces =
| replaced_by =
| traffic =
| toll =
| extra =
}}
Euripus Bridge (also Euripos Bridge, Evripos Bridge; {{langx|el|Γέφυρα Ευρίπου}}) is a {{convert|395|m|ft|adj=mid|-long}} cable-stayed bridge located in Chalcis that crosses the Euripus Strait, the central and narrowest part of the channel separating the island of Euboea from the Greek mainland.[http://encyclopedia2.thefreedictionary.com/%c3%89vripos "The Free Dictionary evripos"]
Built in 1992, the bridge was the first cable-stayed road bridge in Greece. A technical challenge during the design and the construction phase was the extremely slender (L/480) longitudinally and transversally pre-stressed concrete deck with only {{convert|45|cm}} constant thickness, providing sufficient stiffness to omit longitudinal girders. The multi-strand stay-cables therefore have a closer spacing of approximately {{convert|5|m}} with a minimum inclination of 23 degrees (0.4 rad) and were directly used to support the free cantilever form-works during deck construction. For purpose of higher seismic performance, the concrete deck is monolithically connected with the towers. Constrained reaction due to temperature rise can be handled well due to the slender towers and the soft superstructure. At the transition piers at the bridge ends hinged tension pendulum members are used to transfer uplift forces into the substructure.[http://www.sbp.de/en/build/show/27-Evripos_Bridge "evripos bridge sbp.de"]
Technical data
- Total length: {{convert|395|m}}
- Main bridge span lengths: {{convert|90|+|215|+|90|m|ft}}
- Bridge deck width: {{convert|13.50|m|ftin}} (2 carriageways + 2 pedestrian sidewalks)
- Deck surface: {{convert|5390|m2}}
- Tower height: {{convert|90|m}} (approximately {{convert|45|m|round=5}} above and {{convert|45|m|round=5}} below deck level)
- Thickness of the concrete deck: {{convert|45|cm}}{{cite web|url=https://structurae.net/structures/evripos-bridge|title=Evripos Bridge|publisher=Structurae|accessdate= 23 January 2017}}