Future Ready Combat Vehicle
{{Short description|Indian main battle tank programme}}
{{Use dmy dates|date=August 2015}}
{{Use Indian English|date=January 2025}}
The Future Ready Combat Vehicle (FRCV), also designated as Project Ranjeet ({{Lit|Victorious in Battle}}), is a design and development programme to develop a next generation main battle tank to replace the T-72 fleet of the Indian Army. As of 2024, T-72 is the mainstay of the Indian Army Armoured Corps. Around 1,770 units shall be inducted in three phases (approx. 590 each).{{Cite news |date=2024-02-19 |title=Army eyes Rs 57,000cr project to make combat vehicles to replace T-72 tanks |url=https://timesofindia.indiatimes.com/india/army-eyes-57000cr-project-to-make-combat-vehicles-to-replace-t-72-tanks/articleshow/107801757.cms |url-status=live |archive-url=https://web.archive.org/web/20240831123137/https://timesofindia.indiatimes.com/india/army-eyes-57000cr-project-to-make-combat-vehicles-to-replace-t-72-tanks/articleshow/107801757.cms |archive-date=31 August 2024 |access-date=2024-02-19 |work=The Times of India |issn=0971-8257}}{{Cite web |last=Deshpande |first=Smruti |date=2024-09-04 |title=Defence Ministry approves Future Ready Combat Vehicles procurement. Here's the roadmap for the project |url=https://theprint.in/defence/defence-ministry-approves-future-ready-combat-vehicles-procurement-heres-the-roadmap-for-the-project/2251918/ |access-date=2024-09-05 |website=ThePrint |language=en-US}}
History
On 22 June 2015, it was reported that the Indian Army has released a Request for Information (RFI) to global tank manufacturers to submit proposals to design a "new generation, state-of-the-art combat vehicle platform". The design would serve as the "base platform" for the development of 10 other variants including bridge laying and trawl tanks, self-propelled artillery and air defence gun, a combat engineering vehicle and tracked ambulance. The initiative, from the Directorate General of Mechanised Forces, was named Future Ready Combat Vehicle (FRCV). This was a parallel development with the Defence Research and Development Organisation (DRDO) Future Main Battle Tank (FMBT) which, as of 2010, was expected to be completed by 2020. The FMBT project was worth around {{INRConvert|25000|c|lk=on|year=2010}} for designing, development and testing followed by production at a rate of {{INRConvert|50|c|lk=off|year=2010}} per tank. The total project would be worth {{INRConvert|1.5|lc|lk=off|year=2010}}.{{Cite news |date=2018-06-26 |title=Army invites proposals for building FRCV tanks, DRDO surprised |url=https://economictimes.indiatimes.com/news/defence/army-invites-proposals-for-building-frcv-tanks-drdo-surprised/articleshow/47830259.cms?from=mdr |access-date=2025-01-01 |work=The Economic Times |issn=0013-0389}}{{Cite news |date=2015-06-22 |title=Army's new battle tank proposal sets stage for MoD tussle |url=https://www.business-standard.com/article/economy-policy/army-s-new-battle-tank-proposal-sets-stage-for-mod-tussle-115062200028_1.html |access-date=2025-01-01 |work=Business Standard}}
FRCV would proceed in three stages - design stage, prototype development stage and production stage. The RFI is open to both domestic and international firms. The prototypes of the competing manufacturers would be tested and evaluated. The "best" prototype would be chosen and then produced by a "nominated developing agency".
As of July 2015, Tata Motors responded to the FRCV RFI.{{Cite web |title=Tata Motors Submits Response For Indian Army’s FRCV RFI |url=https://www.defensemirror.com/news/13440/Tata_Motors_Submits_Response_For_Indian_Army___s_FRCV_RFI |access-date=2025-01-01 |website=www.defensemirror.com}}
As per the Ministry of Defence, the FMBT and the FRCV are two parallel projects and FRCV is meant for "futuristic requirements beyond 2027" and "not in conflict with the current MBT Arjun programme and its future orders". The Army had been against the further ordering of 118 units of Arjun MkII variant (now, Arjun Mk1A) as it has a weight of around 67 tonnes in spite of successfully demonstrating 53 of the 73 upgrades over Arjun Mk1. Army officers stated that, "Many bridges and culverts in Punjab will not be able to take its weight. Moreover, our rail tank transporters will find it tough to carry the Arjuns from one sector to another".{{Cite news |date=2015-08-05 |title=Army, DRDO fight it out again over Arjun and futuristic tanks |url=https://timesofindia.indiatimes.com/india/army-drdo-fight-it-out-again-over-arjun-and-futuristic-%20tanks/articleshow/48355161.cms |access-date=2025-01-01 |work=The Times of India |issn=0971-8257}}
Design
The tank will have a weight of less than 60 tonnes, carry 4 troops and will feature superior mobility, all terrain ability, multilayered protections, precision and lethal fires, and real-time situational awareness along with artificial intelligence, drone integration, active protection system, network centric operation capabilities. It should be transportable by existing infrastructure of rail, road and aircraft.{{Cite web |date=2024-09-03 |title=DAC approves 10 capital acquisition proposals worth Rs 1.45 lakh crore to enhance defence preparedness |url=https://pib.gov.in/PressReleasePage.aspx?PRID=2051323 |access-date=2024-09-03 |website=Press Information Bureau}}
Current status
The programme worth {{INRConvert|57000|c|lk=on|year=2024}} was approved by Defence Acquisition Council (DAC) of the MoD on 3 September 2024.{{Cite news |last= |first= |date=2024-09-03 |title=Defence Acquisition Council accords preliminary approval for 10 procurement proposals worth ₹1.44 lakh crore |url=https://www.thehindu.com/news/national/government-approves-procurement-of-frcvs-air-defence-fire-control-radars-dornier-228-aircraft/article68601298.ece/ |access-date=2024-09-05 |work=The Hindu |language=en-IN |issn=0971-751X}} The project will follow [https://www.makeinindiadefence.gov.in/admin/writereaddata/upload/2018-08-16-174652MAKE-I_Procedure.pdf Make I procedure] of defence procurement, through which the government will fund 70% of the project and the industry partner(s) will fund the remainder. As the Acceptance of Necessity (AoN) has been granted by DAC, the Army will roll out an Expression of Interest (EoI) in which all the necessary parameters required by the Army will be published. When interested industry partner(s) respond to it, Request for Proposal (RFP) will be issued. Then, 2 developing agencies shall be shortlisted (most likely private sector companies) to whom project sanction order will be extended. This process is expected to take 6–8 months post-DAC approval. The developing agencies shall roll out their prototypes within 3–4 years followed by user trials and induction by 2030. The order will be split between the selected companies.{{Cite web |last=Suciu |first=Peter |date=2024-09-10 |title=India Wants to 'Scrap' Its Russian-Designed T-72 Tanks |url=https://nationalinterest.org/blog/buzz/india-wants-scrap-its-russian-designed-t-72-tanks-212619 |access-date=2024-09-23 |website=The National Interest |language=en}}{{Cite news |date=2024-09-04 |title=High-tech warships, next-gen tanks: Indian Army and Navy to get Rs 1.2 lakh crore firepower to combat China |url=https://economictimes.indiatimes.com/news/defence/with-high-tech-warships-next-gen-tanks-indian-army-and-navy-to-get-rs-1-3-lakh-crore-firepower-to-combat-china/articleshow/113009942.cms?from=mdr |access-date=2024-09-23 |work=The Economic Times |issn=0013-0389}} The FRCV project is renamed as Project Ranjit as reported in November 2024.{{Cite news |last=Pubby |first=Manu |date=2024-11-13 |title=Army to test indigenously designed and developed light battle tank in 2025 |url=https://economictimes.indiatimes.com/news/defence/army-to-test-indigenously-designed-and-developed-light-battle-tank-next-year/articleshow/115228487.cms?from=mdr |access-date=2024-11-14 |work=The Economic Times |issn=0013-0389}}
See also
- {{lwc|Arjun (tank)}}
- {{lwc|Zorawar (tank)}}
- {{lwc|Future Main Battle Tank}}
References
{{reflist}}
{{Post-Cold War tanks}}
Category:Main battle tanks of India
Category:Post–Cold War main battle tanks