Galeru Nagari Sujala Sravanthi Project

{{More citations needed|date=September 2024}}

{{Use dmy dates|date=June 2019}}

{{Use Indian English|date=June 2019}}

{{Infobox dam

| name = Galeru Nagari

| name_official = Galeru Nagari Sujala Sravanthi project

| image = File:G N Canal near Gandikota.jpg

| image_size =

| image_caption = Galeru Nagari Canal near Gandikota Reservoir

| image_alt =

| location_map =

| location_map_size =

| location_map_caption =

| coordinates =

| country = South India

| location = Srisailam dam right main canal - Bhanakacherla

| purpose = Irrigation, Drinking water

| status =

| construction_began = 2005

| opening = Under Construction

| demolished =

| cost =

| owner = Government of Andhra Pradesh

| dam_type =

| dam_height =

| dam_height_thalweg =

| dam_height_foundation=

| dam_length = 430 kilometers

| dam_width_crest =

| dam_width_base =

| dam_volume =

| dam_elevation_crest =

| dam_crosses =

| spillway_count =

| spillway_type =

| spillway_capacity =

| res_name =

| res_capacity_total =

| res_capacity_active =

| res_capacity_inactive=

| res_catchment =

| res_surface =

| res_elevation =

| res_max_depth =

| res_max_length =

| res_max_width =

| res_tidal_range =

| plant_operator =

| plant_commission =

| plant_decommission =

| plant_type =

| plant_turbines =

| plant_capacity =

| plant_annual_gen =

| website =

| extra =

}}

File:Canal in Nagari.jpg

Galeru Nagari Sujala Sravanthi Project or GNSS project is an irrigation project in Kadapa and Chitoor districts of Andhra Pradesh.{{cite web|url=http://www.hindu.com/2009/04/20/stories/2009042053550700.htm|archive-url=https://web.archive.org/web/20090423110819/http://www.hindu.com/2009/04/20/stories/2009042053550700.htm|url-status=dead|archive-date=2009-04-23|work=The Hindu|date=2009-04-20|title=YSR warns people against voting back TDP to power}}

It is envisaged to irrigate {{convert|265,000|acre|km2}} in two phases besides providing drinking water facilities to villages and towns en route the canal alignment.{{cite web|url=http://india-wris.nrsc.gov.in/wrpinfo/index.php?title=Gnss_(Galeru_Nagari_Sujala_Sravanthi)_JI00006 |title=Galeru Nagari Sujala Sravanthi, JI00006 |accessdate=17 August 2015 }}{{dead link|date=January 2017 |bot=InternetArchiveBot |fix-attempted=yes }} The main canal, Gandikota, Vamikonda and Sarvarajasagar reservoirs are under construction.{{cite web|url=http://www.hindu.com/2009/01/27/stories/2009012755710300.htm|archive-url=https://web.archive.org/web/20090129233615/http://hindu.com/2009/01/27/stories/2009012755710300.htm|url-status=dead|archive-date=2009-01-29|work=The Hindu|date=2009-01-27|title=Patriotic fervour marks Republic Day}}{{cite web|url=http://www.hindu.com/2007/04/20/stories/2007042009130500.htm|archive-url=https://web.archive.org/web/20071204162819/http://www.hindu.com/2007/04/20/stories/2007042009130500.htm|url-status=dead|archive-date=2007-12-04|work=The Hindu|date=2007-04-20|title=CPI wants Galeru Nagari works expedited}}

The scheme envisages drawl of 40 TMC surplus flood waters of river Krishna from the foreshore of Srisailam Reservoir through Srisailam Right Bank Canal (SRBC) system up to Gorakallu Reservoir and thereafter through an independent flood flow canal to feed nine storage reservoirs en route and utilize the stored water for irrigation during the Rabi season.

The project construction started in 2005, but the work is still in progress. This project doesn't have any assured water allocation and the Rayalaseema region people are strongly demanding the government to allocate assured water to the project.

References

{{reflist}}

{{Coord|14|48|28|N|78|14|59|E|type:landmark_region:IN-AP|display=title}}

Category:Irrigation in Andhra Pradesh

Category:Proposed canals

{{Watersupply-stub}}