Grootegeluk Coal Mine
{{Use dmy dates|date=March 2025}}
{{Use South African English|date=October 2013}}
{{Infobox mine
| name = Grootegeluk Coal Mine
| image =
| width =
| caption =
| pushpin_map = South Africa
| pushpin_label_position =
| pushpin_label =
| pushpin_map_alt =
| pushpin_mapsize =
| pushpin_map_caption =
| coordinates = {{coord|23|40|18|S|27|31|44|E|format=dms|display=inline,title}}
| place =
| subdivision_type = Province
| state/province = Limpopo
| country = South Africa
| owner = Exxaro
| official website =
| acquisition year = 1980
| stock_exchange =
| stock_code =
| products = Coal
| financial year =
| amount = 18.8 Mtpa final coal products
| opening year =
| active years =
| closing year =
}}
The Grootegeluk Coal Mine is an open cast coal mine within the Waterberg Coalfield of the Limpopo province of South Africa.
It is operated by Exxaro.
The mine is {{convert|25|km}} from Lephalale, and employs 2,000 people.{{sfn|Grootegeluk}}
Discovery
In 1920, coal was found in the Ellisras Basin, but at first little was done to investigate the size of the resource.{{sfn|Fourie|Du Plessis|Henry2006}}
Between 1941 and 1952, 143 diamond-drill holes and two prospecting shafts were sunk to obtain a geological map of the Waterberg coalfield.
In 1957 Iscor (later unbundled into Kumba Resources and Mittal Steel South Africa) bought surface rights on six farms located in the coalfield.
In 1973 Iscor began detailed exploration of the deposits below the farms to determine the quality and quantity of coal.
In 1979 Iscor obtained the mining leases on the farms and in 1980 established the Grootegeluk Coal Mine.{{sfn|Grootegeluk Coal Mine, South Africa}}
The mine contains semi-soft coking coal, thermal coal and metallurgical coal.
There is estimated to be 2,800 Mt of accessible coal out of a total measured resource of 4,600 Mt of coal.{{sfn|Grootegeluk}}
A {{convert|19|m|adj=on}} overburden covers {{convert|94.7|m}} of usable coal, which is interspersed with three dirt bands that total {{convert|13.4|m}} in thickness.{{sfn|Winterton|Winterton|1989|p=36}}
The raw coal has less than 25% of burnable substance.{{sfn|Fettweis|1985|p=103}}
Operation
{{multiple image
| align = right
| direction = vertical
| header =
| header_align = center
| image1 = Matimbakragstasie, Ellisras, Limpopo.jpg
| alt1 =
| width1 = 220
| caption1 =
| image2 = Medupikragstasie, Ellisras, Limpopo, a.jpg
| alt2 =
| width2 = 220
| caption2 = The coal for Matimba and Medupi power stations is extracted and processesed by Grootegeluk mine.
| background color=;border:none;
}}
In 2005 the Grootegeluk open-pit colliery was the only coal operation in the Waterberg coalfield.{{sfn|Jeffrey|2005|p=453}}
The mine employed almost 2,000 people to produce 14.5 million tons of coal annually. Of these employees, only a very small percentage were managers, in part because of a severe shortage of management skills in South Africa.{{sfn|Smit|Brevis|Cronje|Vrba|2007|p=294}}
The miners blast the {{convert|15|m|adj=on}} high benches, then excavate the broken coal and truck it to the concentration plant.{{sfn|GEOLOGY HONOURS 1998...}} The mine uses trolley-assist trucks to reduce fuel and maintenance costs and increase productivity.{{sfn|Hartman|Britton|Mutmansky|1992|p=1356}} The major fleet of 20 x Komatsu Haulpak 730E's utilize the trolley assist feature as well as a subsidiary fleet of Hitachi EH4500 and EH3500 trucks. The trolley assist trucks are powered by DC electricity from overhead catenary lines at 1200V.{{sfn|Woof|2006|p=46}}
The Grootegeluk plant uses horizontal belt vacuum filtration to dewater fines.{{sfn|Arnold|Klima|Bethell|2007|p=17}} The mine has the world's largest coal beneficiation facility, with six plants that upgrade 8,000 tonnes per hour of run-of-mine coal.{{sfn|Grootegeluk}}
The new plant installed to extract and process coal for the new Medupi Power Station will be the first in the world to use mobile tipping bins and crushers in the pit near the benches. This equipment will advance as the mine advances. To minimize production stoppages, there will be run-of-mine stockpiles between the pit and the plant. Stockpiles will also be used between the plant and the discard dump stackers. The plant will use dry screening to avoid having to pump tailings to tailings dams.{{sfn|Holman|2008}}
The waste material from the Grootegeluk mine, particularly from the lower levels, is prone to spontaneous combustion.
Various experiments have been conducted to discover the best way to cover this material as the mine is back-filled so as to minimize the risk. A concern is that the covering will become less effective as it absorbs oxygen.{{sfn|Stracher|2007|p=89}}
Output
The mine produces 18.8 Mt of final coal products annually.{{sfn|Grootegeluk}}
As of 2008, Exxaro was supplying Eskom's coal-fired Matimba Power Station.{{sfn|Ndaba|2008}}
Exxaro delivered 14.8 Mt annually of power station coal to the Matimba power station via a {{convert|7|km|adj=on}} conveyor belt.{{sfn|Grootegeluk}}
Grootegeluk produces 1.5 Mt of metallurgical coal for sale to metals industries and other users in South Africa annually.
Exxaro exports or sells to domestic customers about 1Mt of thermal and semi-soft coking coal.
The mine produces 2.5 Mt of semi-soft coking coal annually, delivering most of it to Mittal SA by rail.{{sfn|Grootegeluk}}
In the late 2000s the rail link to the Grootegeluk mine was being upgraded.{{sfn|Aswathanarayana|2009|p=60-61}}
Exxaro expects to expand exports of high-quality coal through the Port of Richards Bay.{{sfn|Ndaba|2008}}
In 2007 Exxaro announced a contract to supply Eskom's new Medupi Power Station, which is also in the Waterberg and was due to open in 2012.{{sfn|Ndaba|2008}}
The contract was finalized in December 2008. Exxaro was to invest R9 billion to speed up extraction from the existing pit, with delivery of coal to the first generation unit at Medupi to start in the 3rd quarter of 2011. Two new dense media coal beneficiation plants were to be built at the mine, and would be operating at full capacity by 2014.
They would supply the Medupi generators with about 14.6 Mt of power station-grade coal annually for the next forty years. The expansion will create about 550 permanent jobs at Grootegeluk.{{sfn|Medupi coal supply agreement finalised}}
References
Citations
{{Reflist}}
Sources
{{Refbegin}}
- {{cite book |last1=Arnold|first1=Barbara J.|last2=Klima|first2=Mark S.|last3=Bethell|first3=Peter J.|title=Designing The Coal Preparation Plant of the Future
|url=https://books.google.com/books?id=pHE944RwAd8C&pg=PA17|access-date=2012-09-25
|date=2007-09-30|publisher=SME|isbn=978-0-87335-257-4}}
- {{cite book |last=Aswathanarayana|first=U|title=Energy Portfolios: Customization and Management
|url=https://books.google.com/books?id=21BUMhtrfPAC&pg=PA61|access-date=2012-09-25
|date=2009-06-01|publisher=CRC Press|isbn=978-0-415-46985-2}}
- {{cite book |last=Fettweis|first=G.B.|title=Compte Rendu
|chapter-url=https://books.google.com/books?id=fxknZi53iT0C&pg=PA103|access-date=2012-09-25
|year=1985|publisher=IGME|isbn=978-84-7474-331-9|chapter=Considerations on coal deposits as basis of coal production}}
- {{cite web
|url = http://www.csir.co.za/mineral_resources/pdfs/CPO-0024.pdf
|last1 = Fourie
|last2 = Du Plessis
|last3 = Henry
|first1 = CJS
|first2 = SJ
|first3 = G
|title = New airborne geophysical data from the Waterberg Coalfield – South Africa's major future energy source
|publisher = CSIR Natural Resources and the Environment
|year = 2006
|access-date = 2012-09-25
|url-status = dead
|archive-url = https://web.archive.org/web/20110627072940/http://www.csir.co.za/mineral_resources/pdfs/CPO-0024.pdf
|archive-date = 27 June 2011
}}
- {{cite web |ref={{harvid|GEOLOGY HONOURS 1998...}} |url=http://web.uct.ac.za/depts/geolsci/dlr/hons1998/index.html |title=GEOLOGY HONOURS 1998 – ECONOMIC GEOLOGY FIELD EXCURSION – MAY/JUNE |publisher=University of Cape Town |access-date=2012-09-25 |archive-url=https://archive.today/20121224194507/http://web.uct.ac.za/depts/geolsci/dlr/hons1998/index.html |archive-date=24 December 2012 |url-status=dead }}
- {{cite web
|ref = {{harvid|Grootegeluk}}
|url = http://www.exxaro.com/content/ops/coal_grootegeluk.asp
|title = Grootegeluk
|publisher = Exxaro
|access-date = 2012-09-25
|url-status = dead
|archive-url = https://web.archive.org/web/20070223181025/http://www.exxaro.com/content/ops/coal_grootegeluk.asp
|archive-date = 23 February 2007
}}
- {{cite journal|ref={{harvid|Grootegeluk Coal Mine, South Africa}} |url=http://www.miningweekly.com/print-version/grootegeluk-coal-mine-2000-06-09
|title=Grootegeluk Coal Mine, South Africa
|date=9 June 2000
|journal=Mining Weekly
|access-date=2012-09-25}}
- {{cite book |last1=Hartman|first1=Howard L.|last2=Britton|first2=Scott G.|last3=Mutmansky|first3=Jan M.|title=SME Mining Engineering Handbook
|url=https://books.google.com/books?id=DsSmPKEOWDcC&pg=PA1356|access-date=2012-09-25
|year=1992|publisher=SME|isbn=978-0-87335-100-3}}
- {{cite journal |url=http://www.engineeringnews.co.za/article/coal-mine-grows-to-support-new-power-station-2008-06-20
|last=Holman|first=Jacqueline |date=20 June 2008
|title=Coal mine grows to support new power station
|journal=Engineering News
|access-date=2012-09-25}}
- {{cite journal |url=http://www.saimm.co.za/Journal/v105n06p453.pdf
|first=L. |last=Jeffrey |title=Challenges associated with further development of the Waterberg Coalfield
|journal=The Journal of the South African Institute of Mining and Metallurgy |volume=105 |date=July 2005
|access-date=2012-09-25}}
- {{cite journal |ref={{harvid|Medupi coal supply agreement finalised}} |url=http://www.miningweekly.com/article/medupi-coal-supply-agreement-finalised-2008-12-05
|journal=Mining Weekly |title=Medupi coal supply agreement finalised
|date=5 December 2008
|access-date=2012-09-25}}
- {{cite journal |url=http://www.miningweekly.com/article/abundant-waterberg-coalfield-capable-of-hosting-many-more-power-stations-2008-03-20
|last=Ndaba|first=Dennis |date=20 March 2008
|title=Abundant Waterberg coalfield capable of hosting many more power stations |journal=Mining Weekly
|access-date=2012-09-25}}
- {{cite web |url=http://www.limpoporak.org/en/river/water+quality/human+impacts/industry+and+mining/waterberg.aspx
|title=Waterberg Coalfield
|last=Oberholster|first=Paul |work=Limpopo River Awareness Kit |year=2010
|access-date=2012-09-25}}
- {{cite book |last1=Smit|first1=P. J.|last2=Brevis|first2=T.|last3=Cronje|first3=G.J.De J. |first4=M.J. |last4=Vrba |title=Management Principles: A Contemporary Edition for Africa
|url=https://books.google.com/books?id=rInm6bNmn9AC&pg=PT307|access-date=2012-09-25
|date=2007-01-01|publisher=Juta and Company Ltd|isbn=978-0-7021-7295-3}}
- {{cite book |last=Stracher|first=Glenn B.|title=Geology of Coal Fires: Case Studies from Around the World
|url=https://books.google.com/books?id=eJU0WOABSWIC&pg=PA89|access-date=2012-09-25
|date=2007-12-31|publisher=Geological Society of America|isbn=978-0-8137-4118-5|page=89}}
- {{cite book |last1=Winterton|first1=Jonathan|last2=Winterton|first2=Ruth|title=Coal, Crisis, and Conflict: The 1984-85 Miners' Strike in Yorkshire
|url=https://books.google.com/books?id=QwkNAQAAIAAJ&pg=PA36|access-date=2012-09-25
|year=1989|publisher=Manchester University Press ND|isbn=978-0-7190-2548-8}}
- {{cite book |last=Woof|first=Mike|title=Ultra Haulers: Global Giants of the Mining Industry
|url=https://books.google.com/books?id=4brmfLq44nAC&pg=PA46|access-date=2012-09-25
|date=2006-03-24|publisher=MotorBooks International|isbn=978-0-7603-2381-6}}
{{Refend}}
{{Authority control}}