Guiyang Metro

{{Short description|Metro system in Guiyang, China}}

{{Infobox Public transit

| name = {{nowrap|Guiyang Metro}}

| image = GuiyangMetro.png

| imagesize = 80px

| image2 = Guiyang URT (Metro) Line 1 CRRC Nanjing Puzhen B train.jpg

| imagesize2 = 275px

| locale = Guiyang, Guizhou Province, China

| transit_type = Rapid transit

| lines = 4

| stations = 93

| ridership =

| website = {{URL|http://www.gyurt.com/}}

| began_operation = {{Start date and age|2017|12|28}}

| operation_will_start =

| operator = Guiyang Urban Rail Transit Corporation

| system_length = {{convert|149|km|mi||abbr=on}}

| track_gauge = {{RailGauge|sg|allk=on}}

| el = 1500 V overhead line

| average_speed = {{convert|80|km/h||abbr=on}}

| map = 250px

| map_state = hide

| alt =

| caption =

| owner = Guiyang Urban Rail Transit Co., Ltd

| area served = Baiyun District
Guanshanhu District
Yunyan District
Nanming District
Huaxi District

| annual_ridership =

| chief_executive =

| character =

| vehicles =

| line_number =

| start =

| end =

}}

The Guiyang Metro is a rapid transit system in the city of Guiyang, Guizhou province, China. It is operated and branded as Guiyang Urban Rail Transit (GYURT).

A short northern section of Line 1 opened on 28 December 2017,{{cite news |date=2017-12-28 |title=贵阳地铁今日13时启程 |url=http://news.qx162.com/gz/2017/1228/211247.shtml |archive-url=https://web.archive.org/web/20171228171832/http://news.qx162.com/gz/2017/1228/211247.shtml |archive-date=2017-12-28 |access-date=2017-12-28 |publisher=黔讯网 |language=zh}} with the full line entering operation on 1 December 2018.{{cite web|url=http://news.gzdsw.com/gz/2018/1123/99960.html|title=贵阳,地铁来了!|website=news.gzdsw.com|access-date=2019-03-19|archive-date=2018-11-23|archive-url=https://web.archive.org/web/20181123200855/http://news.gzdsw.com/gz/2018/1123/99960.html|url-status=dead}} Line 2 opened on 28 April 2021. Line 3 opened on 16 December 2023.{{cite web |url=https://www.chinanews.com.cn/sh/2023/12-16/10129835.shtml |title=贵阳轨道交通3号线正式开通运营 |publisher=中国新闻网 |date=16 December 2023}} Line S1 opened on 28 December 2024. Line T2, a tram line, is also under construction.{{cite web|url=http://news.gog.cn/system/2023/01/09/018297540.shtml|date=2023-01-09|title=贵阳地铁3号线一期、S1线一期、T2线一期建成投用时间|quote=确保2023年3号线一期建成投用,2024年S1线一期、T2线一期建成投用}}{{cite web|url=https://wb.gywb.cn/ipaper/gywb/html/2020-04/01/content_5752.htm|publisher=贵阳晚报|title=贵阳有轨电车T2线正式开工}}

Fares

Fares are determined based on the distance traveled, with a maximum fare of RMB 6. Children under 1.3 meters in height ride for free, while other children pay half-price. Individuals over 70 years old enjoy free travel on public transportation in Guiyang.

Lines in operation

File:Guiyang Urban Rail Transit Map.png

class="wikitable sortable" style="cell-padding:1.5; font-size:96%; text-align:center;"

! data-sort-type="text"style="width:120px;" |Line

! class="unsortable" colspan="2" style="width:450px; line-height:1.05"|Terminals
(District)

! Commencement

! Newest
Extension

! style="line-height:1.05"| Length
km

! style="line-height:1.05"| Stations

style="text-align:center; line-height:1.05" | {{rint|guiyang|1}}

|style="text-align:center; width:225px; line-height:1.05"| Douguan
(Guanshanhu)

|style="text-align:center; width:225px; line-height:1.05"| Xiaomeng Industrial Park
(Huaxi)

|style="text-align:center; line-height:1.05" | 2017

|style="text-align:center; line-height:1.05" | 2019

|style="text-align:center; line-height:1.05" | 35.11{{cite web|url=http://www.xinhuanet.com/fortune/2018-12/01/c_1123794055.htm|archive-url=https://web.archive.org/web/20191025091521/http://www.xinhuanet.com/fortune/2018-12/01/c_1123794055.htm|url-status=dead|archive-date=October 25, 2019|date=2018-12-01|title=贵阳市轨道交通1号线全线正式开通初期运营}}{{cite web|url=http://app.myzaker.com/news/article.php?pk=5c026a1f1bc8e0343c000390|title=贵阳轨道交通1号线全线开通运营 全长35.11公里设25座车站|date=2018-12-01}}

|style="text-align:center; line-height:1.05" | 25

style="text-align:center; line-height:1.05" | {{rint|guiyang|2}}

|style="text-align:center; width:225px; line-height:1.05"| North Baiyun Road
(Baiyun)

|style="text-align:center; width:225px; line-height:1.05"| Zhongxing Road
(Nanming)

|style="text-align:center; line-height:1.05" | 2021

|style="text-align:center; line-height:1.05" |

|style="text-align:center; line-height:1.05" | 40.6

|style="text-align:center; line-height:1.05" | 32

style="text-align:center; line-height:1.05" | {{rint|guiyang|3}}

|style="text-align:center; width:225px; line-height:1.05"| Luowan
(Wudang)

|style="text-align:center; width:225px; line-height:1.05"| Tongmuling
(Huaxi)

|style="text-align:center; line-height:1.05" | 2023

|style="text-align:center; line-height:1.05" |

|style="text-align:center; line-height:1.05" | 43.03

|style="text-align:center; line-height:1.05" | 29

style="text-align:center; line-height:1.05" | {{rint|guiyang|S1}}

|style="text-align:center; width:225px; line-height:1.05"| Wangchengpo

|style="text-align:center; width:225px; line-height:1.05"| Zaojiaoba

|style="text-align:center; line-height:1.05" | 2024

|style="text-align:center; line-height:1.05" |

|style="text-align:center; line-height:1.05" | 30.3

|style="text-align:center; line-height:1.05" | 13

class="sortbottom"

| colspan="5" style="text-align:center; line-height:1.05" |Total

| style="text-align:center; line-height:1.05" |149.0

| style="text-align:center; line-height:1.05" |99

=Line 1=

{{Main|Line 1 (Guiyang Metro)}}

Line 1 was approved for construction on 6 May 2013, and approved for plan in 2006. The line goes through Guanshanhu, Yunyan, Nanming and Huaxi Districts. The line twice crosses Nanming River and connects the downtown area with a number of outlying districts. The line depots are Xiaohe Depot and Guanshanhu Depot. The railway electrification system uses an overhead line. Line 1 runs northwest to south.

=Line 2=

{{Main|Line 2 (Guiyang Metro)}}

Line 2 is 40.6 km with 32 stations,{{cite web |url=https://mp.weixin.qq.com/s/LyzoZA4JzgvbRcTdW7RF2w|title=官宣!贵阳地铁2号线全线试运行,票价及站名公布(附换乘攻略)|access-date=2020-12-30}} including 30 underground stations and 2 elevated stations.{{cite web|url=http://news.gog.cn/system/2020/12/29/017804381.shtml|date=2020-12-29|title=贵阳地铁2号线试运行 部分市民代表参加试乘体验}} Line 2 runs north to southeast. It opened on April 28, 2021.{{cite web|url=http://www.gz.xinhuanet.com/2021-04/26/c_1127378070.htm|archive-url=https://web.archive.org/web/20210426113938/http://www.gz.xinhuanet.com/2021-04/26/c_1127378070.htm|url-status=dead|archive-date=April 26, 2021|title=贵阳轨道交通2号线4月28日全线开通运营|quote=轨道交通2号线开通初期运营后,贵阳市有2条地铁线路开通运营,全网线路长度增加到75.7公里,其中,1号线35.1公里,2号线40.6公里}}

=Line 3=

{{Main|Line 3 (Guiyang Metro)}}

The first phase of Line 3 is 43.03 km in length and has 29 stations. Line 3 runs from northeast to south. It opened on 16 December 2023.

=Line S1=

The first phase of Line S1 opened in 2024. It is 30.32 km in length,{{cite web |date=2019-11-07 |title=贵阳市轨道交通S1线正式开工! |url=http://www.ddcpc.cn/detail/rongmei/common/11515115020278.html}} including a 22.64 km underground section and 7.68 km elevated section.{{cite web |date=2019-11-07 |title=刚刚,贵阳轨道交通S1线正式开工! |url=http://jgz.app.todayguizhou.com/news/news-news_detail-news_id-11515115020268.html}}

Lines under construction

=Line T2=

The first phase of tram line Line T2 is under construction. It will be 10.92 km in length, with 13 stations.{{cite web|url=https://www.thepaper.cn/newsDetail_forward_7787494|title=正公示!贵阳有轨电车T2线一期工程计划8月开工!13座车站公布→}}{{cite web|url=http://www.gyurt.com/system/2020/02/28/030367174.shtml|publisher=贵阳轨道交通|title=贵阳市有轨电车示范线(T2线一期工程) 首次环境影响评价信息公开}} It is expected to open in 2025.

Future development

Lines 4, S2, S3, S4, and Line G1 which passes through the Gui'an New Area, are in the planning stage.{{cite web|url=http://www.guiyang.gov.cn/ztzl/gygdjt/ghp/gyscsgdjtyjnxwght/20160711/i1064960.html|title=贵阳市城市轨道交通远景年线网规划图|date=2016-07-11}}

See also

Notes

{{Notelist}}

References

{{reflist}}