Gullen Range Wind Farm

{{Short description|Wind farm in New South Wales, Australia}}

{{Use Australian English|date=September 2019}}

{{Use dmy dates|date=September 2019}}

{{infobox power station

| name = Gullen Range Wind Farm

| image = Gullen Range Wind Farm and Wollondilly River at Pomeroy in 2021.jpg

| image_caption = Part of Gullen Range Wind Farm and Wollondilly River from Pomeroy

| country = Australia

| location = Gullen Range

| status = O

| construction_began = 2012

| commissioned = 2013

| owner = New Gullen Range Wind Farm

| wind_farm_type = Onshore

| wind_hub_height = {{convert|80|m|ft|0}} Goldwind GRW100-2.5MW
{{convert|85|m|ft|0}} Goldwind GW82-1.5MW

| wind_rotor_diameter = {{convert|82|m|ft|0}}
{{convert|100|m|ft|0}}

| ps_units_operational = 17 × 1.5 MW
56 × 2.5 MW

| ps_units_manu_model = Goldwind GW82-1.5MW
Goldwind GRW100-2.5MW

| ps_electrical_capacity = 165.5

}}

Gullen Range Wind Farm is a wind farm in the locality of Gurrundah in the Southern Tablelands region of New South Wales, Australia. It consists of 73 wind turbines and produces up to 165.5MW of electricity. It is owned by BJCE Australia and built and operated by Goldwind Australia. Gullen Range was BJCE Australia's first wind farm, when it bought the project in 2014.{{cite web |url=https://bjceaustralia.com/ |title=BJCE Australia |publisher=BJCE Australia |access-date=21 September 2019}}

The wind farm consists of two different turbine models, both manufactured by Goldwind. There are 56 GRW100-2.5MW turbines with 100m rotor diameters on 80m towers (total height 130m) which generate 2.5MW of electricity. There are also 17 smaller GW82-1.5MW turbines with 82m rotor diameters on 85m towers (total height 126m) which produce 1.5MW of electricity.{{cite web |url=https://gullenrangewindfarm.com/the-project/about-the-project/ |title=About the Project |publisher=Gullen Range Windfarm |access-date=21 September 2019}}

The project was developed by Epuron, who sold it to Goldwind Australia before construction. Goldwind began construction in 2012. It began generating electricity in 2013 and was fully operational by 23 December 2014. Goldwind onsold 75% of the project to BJCE Australia.