Hakubi Line

{{short description|Railway line in Japan}}

{{More citations needed|date=September 2014}}

{{Use dmy dates|date=December 2021}}

{{Infobox rail line

| name = Hakubi Line

| color = {{rcr|JR West|Hakubi}}

| logo = JRW san-V.svg

| logo_width = 50

| image = Hakubi-line Series273.jpg

| image_width = 300px

| image_alt = Image

| caption = Limited Express Yakumo

| type = Regional rail

| system =

| status =

| locale = Okayama and Tottori Prefectures

| start = {{STN|Kurashiki|x}}

| end = {{STN|Hōki-Daisen|x}}

| stations = 28

| routes =

| daily_ridership =

| open = {{start date and age|1919|08|10|df=y}}

| close =

| owner = {{ric|JR West|name=y}}

| operator = JR West
Ibara Railway (between Kiyone and Sōja)

| character =

| depot =

| stock = {{Plainlist|

}}

| linelength = {{Convert|138.4|km|abbr=on}}

| tracklength =

| tracks = 2 (KurashikiBitchū-Takahashi)
2 (IkuraIshiga)
2 (NiimiNunohara)
1 for rest of line

| gauge = {{track gauge|1067mm|lk=on}}

| electrification = {{1,500 V DC}}

| minradius = {{cvt|200|m|ft}}

| speed = {{cvt|110|km/h}} – {{cvt|120|km/h}}

| elevation =

| map =

| map_name =

| map_state = collapsed

}}

The {{Nihongo|Hakubi Line|伯備線|Hakubi-sen}} is a railway line operated by West Japan Railway Company (JR West) in the mountainous area of the Chūgoku region of Japan. It begins at the south end of Okayama Prefecture at Kurashiki Station in Kurashiki, passing through Niimi Station on the west side of Niimi, and terminating at Hōki-Daisen Station in Yonago, Tottori Prefecture, linking Okayama Prefecture and Yonago across the Chūgoku Mountains. The Hakubi Line follows the Takahashi River between Kurashiki and Niimi, and the Hino River between Shōyama and Hōki-Daisen.

As of April 2023, the ICOCA card can be used in all stations between Kurashiki Station and Niimi Station.{{Cite web |title=ご利用可能エリア│ICOCA:JRおでかけネット |url=https://www.jr-odekake.net/icoca/area/map/all.html |access-date=2023-08-22 |website=www.jr-odekake.net}}

Line data

The Okayama Division of JR West has jurisdictional control over operations between Kurashiki and Niizato stations, with the Yonago Division having control between Kami-Iwami and Hōki-Daisen Station. The boundary is midway between Niizato and Kami-Iwami Stations. The line color for the portion covered by the Okayama Division is vermillion orange, while the section covered by the Yonago Division is the standard blue.

Services

= Limited express =

Stations

class=wikitable
Line

!No.

!Station

!Japanese

!Distance
(km)

!Connecting lines

!colspan="2"|Location

rowspan=5|Sanyō Main Line

|{{RouteBox|JR-V01

#44954B}}

|{{STN|Okayama|x}}

|岡山

|align=right

15.9

|20px Sanyō Shinkansen
20px Sanyō Main Line
20px Tsuyama Line
20px Kibi Line (Momotaro Line)
Okaden:
Higashiyama Line
Seikibashi Line (Both at {{STN|Okayama-Ekimae|x}})

|rowspan=3|Kita-ku,
Okayama

|rowspan=23|Okayama

{{RouteBox|JR-V02#44954B}}

|Kitanagase

|北長瀬

|align=right

12.5

|

{{RouteBox|JR-V03#44954B}}

|Niwase

|庭瀬

|align=right

9.4

|

{{RouteBox|JR-V04#44954B}}

|Nakashō

|中庄

|align=right

4.7

|

|rowspan=3|Kurashiki

rowspan=2|{{RouteBox|JR-V05#44954B}}

|rowspan=2|{{STN|Kurashiki|x}}

|rowspan=2|倉敷

|rowspan=2 align="right"|0.0

|rowspan=2|20px San'yō Main Line
Mizushima Main Line (Kurashiki-shi Station)

rowspan=28|Hakubi Line
{{RouteBox|JR-V06#44954B}}

|{{STN|Kiyone|x}}

|清音

|align="right"|7.3

|Ibara Line

|rowspan=5|Sōja

{{RouteBox|JR-V07#44954B}}

|{{STN|Sōja|x}}

|総社

|align="right"|10.7

|20px Kibi Line (Momotaro Line)
Ibara Line

{{RouteBox|JR-V08#44954B}}

|{{STN|Gōkei|x}}

|豪渓

|align="right"|15.3

{{RouteBox|JR-V09#44954B}}

|{{STN|Hiwa|x}}

|日羽

|align="right"|19.0

{{RouteBox|JR-V10#44954B}}

|{{STN|Minagi|x}}

|美袋

|align="right"|22.7

{{RouteBox|JR-V11#44954B}}

|{{STN|Bitchū-Hirose|x}}

|備中広瀬

|align="right"|29.6

|rowspan="5"|Takahashi

{{RouteBox|JR-V12#44954B}}

|{{STN|Bitchū-Takahashi|x}}

|備中高梁

|align="right"|34.0

{{RouteBox|JR-V13#44954B}}

|{{STN|Kinoyama|x}}

|木野山

|align="right"|38.8

{{RouteBox|JR-V14#44954B}}

|{{STN|Bitchū-Kawamo|x}}

|備中川面

|align="right"|42.7

{{RouteBox|JR-V15#44954B}}

|{{STN|Hōkoku|x}}

|方谷

|align="right"|47.4

{{RouteBox|JR-V16#44954B}}

|{{STN|Ikura|x}}

|井倉

|align="right"|55.2

|rowspan="7"|Niimi

{{RouteBox|JR-V17#44954B}}

|{{STN|Ishiga|x}}

|石蟹

|align="right"|59.7

{{RouteBox|JR-V18#44954B}}

|{{STN|Niimi|x}}

|新見

|align="right"|64.4

|20px Kishin Line

rowspan="14"|

|{{STN|Nunohara|x}}

|布原

|align="right"|68.3

{{STN|Bitchū-Kōjiro|x}}

|備中神代

|align="right"|70.8

|20px Geibi Line

{{STN|Ashidachi|x}}

|足立

|align="right"|77.0

{{STN|Niizato|x}}

|新郷

|align="right"|82.8

{{STN|Kami-Iwami|x}}

|上石見

|align="right"|86.7

| rowspan="2"|Nichinan

|rowspan="10"|Tottori Prefecture

{{STN|Shōyama|x}}

|生山

|align="right"|95.4

{{STN|Kamisuge|x}}

|上菅

|align="right"|98.9

| rowspan="3"|Hino

{{STN|Kurosaka|x}}

|黒坂

|align="right"|103.7

{{STN|Neu|x}}

|根雨

|align="right"|111.3

{{STN|Muko|x}}

|武庫

|align="right"|116.0

| rowspan="2"|Kofu

{{STN|Ebi|x}}

|江尾

|align="right"|118.1

{{STN|Hōki-Mizoguchi|x}}

|伯耆溝口

|align="right"|127.3

| rowspan="2"|Hōki

{{STN|Kishimoto|x}}

|岸本

|align="right"|132.3

{{STN|Hōki-Daisen|x}}

|伯耆大山

|align="right"|138.4

|20px San'in Main Line

|Yonago

Rolling stock

{{Expand section|date=September 2014}}

  • 115 series
  • 213 series
  • 227 series{{Cite web |date=22 July 2023 |title=227系500番台「Urara」が営業運転を開始 |trans-title=227-500 series "Urara" starts commercial operation |url=https://railf.jp/news/2023/07/22/180000.html |access-date=22 January 2024 |website=Japan Railfan Magazine Online |language=Japanese}}
  • 273 series{{cite web |author= |date=21 October 2023 |title=JR西日本「やくも」新型車両273系「豊かな車内の過ごし方」実現へ |trans-title= |url=https://news.mynavi.jp/article/20231021-yakumo273/ |url-status=live |archiveurl=https://web.archive.org/web/20231021134929/https://news.mynavi.jp/article/20231021-yakumo273/ |archivedate=21 October 2023 |access-date=22 October 2023 |website=news.mynavi.jp |publisher=Mynavi Corporation |language=Japanese}}
  • 285 series
  • 381 series
  • KiHa 120
  • KiHa 126

The experimental "Smart BEST" battery electric train was tested on the Hakubi Line between October and December 2012.{{cite web |url= http://www.westjr.co.jp/press/article/2012/10/page_2766.html|script-title=ja:近畿車輛株式会社が開発した自己充電型バッテリー車両の走行試験について|trans-title=Test running of battery train developed by Kinki Sharyo|date= 30 October 2012|work= Press release|publisher= West Japan Railway Company|location= Japan|language= ja|archive-url= https://web.archive.org/web/20130606124539/http://www.westjr.co.jp/press/article/2012/10/page_2766.html|archive-date= 6 June 2013|access-date= 20 September 2014}}

History

The first section of the Hakubi Line to open was the northern section, initially named the {{Nihongo|Hakubihoku Line|伯備北線||lit. "Hakubi North Line"}}, between Hōki-Mizoguchi and Hōki-Daisen on 10 August 1919.{{cite book |title = 停車場変遷大辞典 国鉄・JR編 |trans-title=Station Transition Directory – JNR/JR|publisher = JTB | editor1-last = Ishino| editor1-first = Tetsu| year = 1998 |location = Japan |pages =96–97 |isbn = 4-533-02980-9}} The northern section was then progressively extended south, to Ebi Station on 25 March 1922, to Neu Station on 30 July 1922, to Kurosaka Station on 10 November 1922, to Shōyama Station on 28 November 1923, to Kami-Iwami Station on 6 December 1924, and to Ashidachi Station on 1 December 1926.

The first section of the southern part of the Hakubi Line, named the {{Nihongo|Hakubinan Line|伯備南線||lit. "Hakubi South Line"}}, was opened on 17 February 1925, between Shisawa (now Gōkei) and Kurashiki. The southern section was gradually extended north, extending to Bitchū-Kawamo on 31 July 1927, with connection between the north and south sections being made on 25 October 1928, from which date the entire line was named the Hakubi Line.

The Kiyone to Bitchu-Takahashi section was double-tracked between 1968 and 1973, with the Kurashiki to Kiyone and Niimi to Nunohara sections being double-tracked in 1979, and the Ishiga to Ikuta section double-tracked between 1982 and 1983 in conjunction with a realignment which shortened the route by 1.2 km.{{citation needed|date=September 2014}} CTC signalling was commissioned on the entire line in 1972, and the Kurashiki to Hokidaisen section was electrified in 1982.{{citation needed|date=September 2014}}

=Timeline=

  • 10 August 1919: The Hakubi North Line opens between Hōki-Mizoguchi and Hōki-Daisen Stations.
  • 25 March 1922: The Hakubi North Line opens between Hōki-Mizoguchi and Ebi Stations.
  • 30 July 1922: The Hakubi North Line opens between Ebi and Neu Stations.
  • 10 November 1922: The Hakubi North Line opens between Neu and Kurosaka Stations.
  • 28 November 1923: The Hakubi North Line opens between Kurosaka and Shōyama Stations.
  • 6 December 1924: The Hakubi North Line opens between Shōyama and Kami-Iwami Stations.
  • 17 February 1925: The Hakubi South Line opens between Kurashiki and Shisawa Station (now Gōkei Station).
  • 1 April 1925: The Hakubi North Line opens at Kamisuge Station.
  • 17 May 1925: The Hakubi South Line opens between Shisawa and Minagi Stations.
  • 20 June 1926: The Hakubi South Line opens between Minagi and Kinoyama Stations.
  • 1 December 1926: The Habuki North Line opens between Kami-Iwami and Ashidachi Stations.
  • 31 July 1927: The Hakubi South Line opens between Kinoyama and Bitchū-Kawamo Stations.
  • 25 October 1928: Service starts between Bitchū-Kawamo and Ashidachi stations. The line is completed and renamed the Hakubi Line.

See also

References