Indian locomotive class WCP-2

{{Use Indian English|date=May 2020}}

{{Use mdy dates|date=May 2020}}

{{Infobox locomotive

| name = GIPR EA/2
IR WCP-2

| image = Bahn-Transport GIPR EA2.jpg

| alt =

| caption = Locomotive shell of the WCP-2 being moved on special transport bogies

| powertype = Electric

| designer =

| builder = SLM, Metrovick

| ordernumber =

| serialnumber =

| buildmodel =

| builddate = 1938

| totalproduction = 1

| rebuilder =

| rebuilddate =

| numberrebuilt =

| website =

| aarwheels =

| uicclass = 2’Bo(A1)

| Britishclass =

| gauge = {{track gauge|1676mm}}

| trucks =

| bogies =

| wheeldiameter = {{convert|1600|mm|ftin|abbr=on}}

| trailingdiameter =

| minimumcurve =

| wheelbase = {{convert|11.883|m|ftin|frac=4|abbr=on}}

| truck =

| bogie =

| pivotcentres =

| pantoshoecentres =

| wheelspacing =

| length = {{convert|16.300|m|ftin|frac=4}} over buffers

| over couplers =

| over bufferbeams=

| body =

| width =

| height =

| pantodown =

| bodyonly =

| frametype =

| axleload =

| leadingbogie/pony=

| weightondrivers = {{convert|60|t|abbr=on}}

| trail bogie/pony =

| locoweight = {{convert|100|t|abbr=on}}

| sandcap =

| powersupply =

| electricsystem = 1500 volts D.C.

| collectionmethod =

| alternator =

| generator =

| tractionmotors = Six

| t/m amps 1 hr =

| t/m amps cont =

| headendpower =

| transmission = SLM universal drive

| gear ratio =

| multipleworking =

| trainheating =

| locobrakes =

| locobrakeforce =

| trainbrakes =

| reservoircap =

| compressorcap =

| exhaustercap =

| safety =

| coupling =

| maxspeed = {{convert|137|km/h|mph|0|abbr=on}}

| poweroutput =

| poweroutput start=

| poweroutput 1 hr= {{convert|1562|kW|hp|0|abbr=on}}

| poweroutput cont= {{convert|1368|kW|hp|0|abbr=on}}

| tractiveeffort =

| t/e starting = {{convert|150|kN|lbf|abbr=on}}

| t/e 1 hr =

| t/e continuous =

| factorofadhesion =

| f/adh starting =

| f/adh 1 hr =

| f/adh continuous=

| operator =

| operatorclass =

| powerclass =

| numinclass =

| fleetnumbers = {{ubl|GIPR 4025|IR 20024}}

| officialname =

| nicknames =

| axleloadclass =

| locale =

| deliverydate =

| firstrundate =

| lastrundate =

| retiredate =

| withdrawndate = 1980s

| preservedunits =

| restoredate =

| scrapdate =

| currentowner =

| disposition =

| notes =

}}

The Indian locomotive class WCP-2 (originally classified as EA/2) is a 1.5 kV DC electric locomotive built in 1938 by Swiss Locomotive and Machine Works (SLM) for the Great Indian Peninsula Railway. The model name stands for broad gauge (W), Direct Current (C), Passenger traffic (P) engine, 2nd generation (2).

Essentially identical to the EA/1 (WCP-1), the lone WCP-2 served passenger trains until its withdrawal in the 1980s. Afterwards, it was donated to the Nehru Science Center in Worli, Mumbai.

History

The electrification of the GIPR began in 1922. Powerful locomotives were required to transport the express trains on the mountain railway to overcome the Western Ghats. They also had to be able to reach speeds of 85 miles an hour (137 km/h){{citation|surname1=Jakob Buchli|periodical=Schweizerische Bauzeitung|title=Universal-Antrieb "Winterthur" für elektrische Lokomotiven|volume=Band 90|issue=23|year=1927|pages=294–296|language=de|doi=10.5169/seals-41817}} - a very high speed at that time, which was not even the case with the E 501 and 502 of the Paris-Orleans Railway had been requested.{{citation|surname1=Mitteilung der SLM|periodical=Schweizerische Bauzeitung|title=Neuerungen im mechanischen Aufbau elektrischer Schnellzuglokomotiven|volume=Band 89|issue=13|year=1927|pages=174–175|language=de|doi=10.5169/seals-41673}} Three test locomotives were therefore ordered from different manufacturers in order to be able to select a suitable design for the series. The tender and evaluation was monitored by the UK electrical engineering firm Merz & McLellan in London.{{sfn|Haut|2000|page=48}}

The first WCP-1 was quite successful so in 1938, a single replica locomotive with the number 4025 was ordered, which had the same construction as the other locomotives, but was nevertheless classified in a new series. The electrical equipment from Metrovick was installed in the halls of the SLM in Winterthur. After the voltage test, the locomotive body was lifted off the driving wheels and the bogies and the engines removed. For transport, it was placed on two special bogies of an SBB flat bed wagon and shipped by rails to Antwerp, where it was loaded onto a cargo ship to India. In Bombay, the locomotive body was mounted back on the undercarriage and brought on its own wheels to the main workshop in GIPR, where the locomotive was fully assembled and then went into operation.{{citation|periodical=Schweizerische Bauzeitung|title=Lokomotiv-Transport Winterthur-Bombay|volume=Band 112|issue=8|year=1938|pages=90–91|language=de|doi=10.5169/seals-49905|author1=[s.n.] }}

The locomotive remained in use until the 1980s and was given after being condemned at the Nehru Science Center in Bombay.{{cite web|title=Side view of the black beauty|periodical=The Indian Railways Fan Club Photo Gallery|url=http://www.irfca.org/gallery/Locos/Electric/wcpx/Side-view-of-the-black-beau.jpg.html|access-date=2016-05-07}}{{cite web|title=The Electric Locomotive Roster: DC & AC/DC Electrics|periodical=24 Coaches|url=http://24coaches.com/the-electric-locomotive-roster-dc-acdc-electrics/|access-date=2016-05-07|date=2014-10-18|language=en-US}}

Specification

File:Schiff-Verlad GIPR EA2.jpg

The locomotive has three individually driven axles, a two-axle bogie at one end and a single axle at the other end of the locomotive. The Winterthur bogie had a pivoting pivot that was centered with springs. The individual running axle was combined with the neighboring driving axle to form a Java bogie,{{sfn|Haut|2000|page=49}} which is why the locomotive had the axle sequence 2’Bo (A1) and not, as often written, 2’Co1.

Two drive motors each drive a drive axle via an SLM universal drive. The engines were arranged high in the engine room, which on the one hand gave the locomotive a favorable center of gravity, and on the other hand it protected it from damage during the frequent floods in Bombay when traveling through water. The engines could be removed laterally through maintenance openings in the lower area of the machine room side wall.

The locomotive's box extended the entire length of the frame. The engine room between the two cabs was divided into three rooms. The brake equipment with vacuum pump and the compressor with air reservoir were in the first room, the switchgear for the electro-pneumatic control was in the second room and the starting resistors were in the third room. The approach took place with all six traction motors connected in series, then two groups of three motors in series and finally three groups with two motors in series were formed. Two field weakening levels were available in each group, so that the locomotive had a total of nine continuous driving stages.{{citation|surname1=F. J. G. Haut|title=Die Geschichte der elektrischen Triebfahrzeuge|volume=Band 1|publisher=Springer|publication-place=Basel|year=1972|pages=35–36|isbn=3764305258|language=de}}

See also

References

{{reflist}}

Bibliography

  • {{cite book |last=Haut |first=F.J.G |date=January 2000 |title=The Pictorial History of Electric Locomotives |url=https://archive.org/details/pictorialhistory0000fjgh/mode/2up |url-access=registration |location= |publisher=Oak Tree Publications |page= |isbn=9780498076442 |access-date= |via=Internet Archive}}