Interstate 385

{{Short description|Interstate Highway in South Carolina}}

{{Use mdy dates|date=September 2018}}

{{Use American English|date=August 2022}}

{{Infobox road

| state = SC

| route = 385

| type = I

| map = {{maplink-road|from=Interstate 385.map}}

| map_custom = yes

| map_notes = I-385 highlighted in red

| length_mi = 42.16

| length_ref = {{cite web |last=Starks |first=Edward |date=January 27, 2022 |title=Table 2: Auxiliary Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways |url=https://www.fhwa.dot.gov/planning/national_highway_system/interstate_highway_system/routefinder/table02.cfm |access-date=August 28, 2022 |work=FHWA Route Log and Finder List |publisher=Federal Highway Administration}}

| established = 1962{{citation needed|date=June 2019}}

| spur_type = I

| spur_of = 85

| direction_a = South

| terminus_a = {{Jct|state=SC|I|26}} near Clinton

| junction = {{Plainlist|

}}

| direction_b = North

| terminus_b = {{Jct|state=SC|BS|385|dab1=Greenville|US|276}} in Downtown Greenville

| counties = Laurens, Greenville

| previous_type = SC

| previous_route = 381

| next_type = SC

| next_route = 385

}}

Interstate 385 (I-385) is an auxiliary Interstate Highway located in the Upstate region of South Carolina. I-385 is a spur route of I-85. The highway provides a connection between Greenville and I-26 to the south, connecting Greenville to Columbia and Charleston. Around Greenville, the last several miles of I-385 forms the northeastern quadrant of a partial beltway around Greenville's southern suburbs along with I-185.

Route description

File:SC Highway 49 exit on I-385.JPG exit on I-385, {{Convert|4|mi|km|spell=in}} before the road ends at I-26]]

After exit 42, I-385 turns into I-385 Business (I-385 Bus.) and becomes East North Street and later—for northbound motorists only—Beattie Place. The business route promptly ends at US Highway 29 (US 29; Church Street) near Bon Secours Wellness Arena in downtown Greenville.

The explosive economic growth of southern Greenville county is largely attributed to I-385 and its connection to the city of Greenville and the major cities of Atlanta and Charlotte (via I-85). This area is known by locals as the "Golden Strip".

I-385 features a rather unusual rest area in the median strip near Laurens that serves both directions of traffic. It was completed as part of the original design of the US 276 expressway in 1958, modeled after the type of single median-located rest areas shared by both north and southbound traffic (to save money). The design is similar to many of those built on turnpikes that predated the Interstate System.

{{-}}

History

{{More citations needed|date=July 2010}}

Image:Greenville, South Carolina 1955 Yellow Book.jpg]]

The general idea—but none of the specifics—of I-385 were present on the 1955 Yellow Book map of the Greenville area. Also of note is that I-85 would have used the US 29 corridor from Greenville east toward Spartanburg based on the diagram.

The portion of I-385 that replaced US 276{{Cite web|url=http://projectprofiles.transportation.org/i385.html |title=AASHTO Project Profiles: South Carolina Department of Transportation I-385 Rehabilitation Project |access-date=May 15, 2012 |author=American Association of State Highway and Transportation Officials |author-link=American Association of State Highway and Transportation Officials |date=May 2012 |archive-url=https://web.archive.org/web/20160303235444/http://projectprofiles.transportation.org/i385.html |archive-date=March 3, 2016 |url-status=dead }} (from South Carolina Highway 417 [SC 417] in Mauldin to SC 56/I-26 in Clinton) was initially the first phase built of a South Carolina Department of Transportation (SCDOT) plan that predated the Interstate System to upgrade and bypass existing through routes, the goal of forming a single limited-access highway from Greenville to the port of Charleston via the state capital of Columbia. This plan was scrapped as soon as the future I-26 was added to the act of Congress that set into motion the Interstate System. As a result, I-26 was one of the first Interstates in the south to open in significant mileage (most in South Carolina between 1959 and 1963).{{Citation needed|date=October 2009}}

Before 1985, I-385 was only signed as such from downtown Greenville to I-85. The portion of the freeway from US 276 in Mauldin to the southern terminus at I-26 was signed as US 276. When the connecting portion was completed, the entire freeway was signed as I-385.{{Citation needed|date=July 2010}}

For seven months ending July 23, 2010, northbound traffic could not use a {{Convert|15|mi|km|adj=on}} section of I-385 in Laurens County due to a $60.9-million (equivalent to ${{Formatprice|{{inflation|US-GDP|60900000|2010}}}} in {{Inflation/year|index=US-GDP}}{{Inflation/fn|index=US-GDP}}) project to pave the portion extending from SC 101 to the I-385/I-26 interchange near Clinton in concrete. The closing of a major highway generated controversy.{{cite news|url=http://www.thesunnews.com/2010/07/25/1601956/i-385-reopened-after-7-month-closure.html|title=I-385 reopened after 7-month closure|last=Cay|first=Nathaniel|work=Greenville News|date=July 25, 2010|access-date=July 25, 2010}} Closing the Interstate for construction saved approximately $34 million (equivalent to ${{Formatprice|{{inflation|US-GDP|34000000|2010}}}} in {{Inflation/year|index=US-GDP}}{{Inflation/fn|index=US-GDP}}).

Between 2002 and 2012, I-385 was widened from two to three lanes in each direction from just north of exit 24 near Fountain Inn to just south of Woodruff Road/SC 146 (exit 35), with the portion between exits 31 and 35 resurfaced in concrete.{{cite news|url=http://www.scdot.org/inside/I-385/altroutes.aspx|title=I-385 widening|work=South Carolina Department of Transportation|date=September 9, 2012|access-date=January 8, 2013}}

Between February 2016 and January 2020, the I-385/I-85 interchange was overhauled to decrease congestion and related accidents.{{Cite web|url=http://www.85385gateway.com/|title=I-85/385 Gateway|website=www.85385gateway.com}}

Exit list

{{jcttop|state=SC|exit|length_ref=}}

{{SCint|exit

|county=Laurens

|cspan=8

|location=Clinton

|lspan=2

|mile=0.00

|exit=

|road={{jct|state=SC|I|26|dir1=east}}

|notes=Continuation beyond southern terminus; I-26 exit 51

}}

{{SCint|exit

|mile=2.00

|exit=2

|road={{jct|state=SC|SC|308|city1=Ora|city2=Clinton}}

}}

{{SCint|exit

|location=Laurens

|lspan=2

|mile=5.31

|exit=5

|road={{jct|state=SC|SC|49|city1=Laurens|city2=Cross Anchor}}

}}

{{SCint|exit

|mile=8.55

|exit=9

|road={{jct|state=SC|US|221|city1=Laurens|city2=Enoree}}

}}

{{SCint|exit

|location=Gray Court

|lspan=3

|mile=10.34

|exit=10

|road=Metric Road – Gray Court

}}

{{SCint|exit

|mile=15.87

|exit=16

|road={{jct|state=SC|SC|101|city1=Woodruff|city2=Gray Court}}

}}

{{SCint|exit

|type=concur

|mile=18.87

|exit=19

|road={{jct|state=SC|SC|14|dir1=east|city1=Owings|city2=Gray Court}}

|notes=Southern end of SC 14 concurrency

}}

{{SCint|exit

|location=Fountain Inn

|lspan=3

|mile=21.63

|exit=22

|type=concur

|road={{jct|state=SC|SC|14|dir1=west|city1=Fountain Inn}}

|notes=Northern end of SC 14 concurrency

}}

{{SCint|exit

|county=Greenville

|cspan=17

|mile=23.10

|exit=23

|road={{jct|state=SC|SC|418|city1=Fountain Inn|city2=Pelzer}}

}}

{{SCint|exit

|mile=24.11

|exit=24

|road=Fairview Street – Fountain Inn

}}

{{SCint|exit

|location=Simpsonville

|lspan=3

|mile=25.77

|exit=26

|road=Harrison Bridge Road

}}

{{SCint|exit

|mile=27.13

|exit=27

|road=Fairview Road – Simpsonville

}}

{{SCint|exit

|mile=28.71

|exit=29

|road=Georgia Road – Simpsonville

}}

{{SCint|exit

|espan=2

|location=Mauldin

|lspan=6

|type=incomplete

|mile=30.14

|mspan=2

|exit=30

|road={{jct|state=SC|I-Toll|185|dir1=north|name1=Southern Connector|US|276|dir2=west|location1=Atlanta|city2=Anderson|city3=Mauldin}}

|notes=Northbound exit and southbound entrance; I-185 exit 1B; eastern terminus of US 276

}}

{{SCint

|type=incomplete

|mile=none

|road={{jct|state=SC|road|Old Stage Road|road|E. Standing Springs Road|to3=to|US|276}}

|notes=Southbound exit and northbound entrance

}}

{{SCint|exit

|mile=30.98

|exit=31

|road={{jct|state=SC|I-Toll|185|dir1=north|location1=Atlanta}}


{{jct|state=SC|SC|417|name1=Laurens Road|city1=Simpsonville}}

|notes=I-185 not signed northbound

}}

{{SCint|exit

|mile=33.07

|exit=33

|road=Bridges Road – Mauldin

}}

{{SCint|exit

|mile=34.13

|exit=34

|road=Butler Road – Mauldin

}}

{{SCint|exit

|mile=35.50

|exit=35

|road={{jct|state=SC|SC|146|name1=Woodruff Road|city1=Mauldin}}

}}

{{SCint|exit

|location=Greenville

|lspan=6

|mile=36.20

|exit=36

|road={{jct|state=SC|I|85|city1=Spartanburg|city2=Anderson}}

|notes=Signed as exits 36A (north) and 36B (south) northbound; single exit 36 southbound; I-85 exits 51B-C

}}

{{SCint|exit

|mile=37.29

|exit=37

|road=Roper Mountain Road

}}

{{SCint|exit

|mile=38.87

|exit=39

|road=Haywood Road

}}

{{SCint|exit

|mile=40.11

|exit=40

|road={{jct|state=SC|SC|291|name1=Pleasantburg Drive}}

}}

{{SCint|exit

|mile=41.86

|exit=42

|road={{jct|state=SC|US|276|city1=Travelers Rest|city2=Mauldin}}

}}

{{SCint|exit

|exit=—

|mile=42.16

|road=East North Street (I-385 Bus. north)

|notes=Continuation as unsigned I-385 Bus.

}}

{{jctbtm|exit|keys=concur}}

Interstate 385 Business

{{Infobox road small

|state=SC

|type=BS

|route=385

|location=Greenville

|formed=1962

|length_mi=0.490

|length_ref={{cite web |url=https://ris.scdot.org/LogMileReport.aspx?county=23&type=2&number=385&auxiliary=5&map=y |title=Highway Logmile Report |publisher=South Carolina Department of Transportation |access-date=December 14, 2020 }}

}}

Interstate 385 Business (I-385 Bus.) is a {{convert|0.490|mi|km|adj=on}} boulevard-grade business route of I-385 along North Street, between Stone Avenue (US 276) and Church Street (US 29). It is an unsigned highway. Its continuation along North Street becomes SC 183. It also connects to US 123 (Academy Street) and SC 183 (Beattie Place).{{google maps |url=https://maps.google.com/maps?saddr=E+North+St&daddr=E+North+St&hl=en&sll=34.853784,-82.385788&sspn=0.029477,0.055747&geocode=FfXTEwIdwOsW-w%3BFaXKEwId6cEW-w&t=p&mra=dme&mrsp=1&sz=15&z=15 |title=Overview map of I-385 Bus. (Greenville) |access-date=May 19, 2013 }} Signage previously existed for this spur route but, by 2007, has been removed;{{citation needed|date=December 2020}} appears only in the SCDOT Greenville–Spartanburg Metro map.{{cite map |url=http://info2.scdot.org//GISMapping/GISMapdl/Greenville_Metro.pdf |title=Greenville–Spartanburg Urban Area |page=Sheet 16 |section=G5 |publisher=South Carolina Department of Transportation |date=September 2013 |access-date=December 14, 2020 |archive-date=November 10, 2020 |archive-url=https://web.archive.org/web/20201110111157/http://info2.scdot.org//GISMapping/GISMapdl/Greenville_Metro.pdf |url-status=dead }}

{{-}}

See also

  • {{Portal-inline|U.S. roads}}

References

{{Reflist}}