Interstate 555
{{Short description|Interstate Highway in Arkansas, United States}}
{{Use mdy dates|date=March 2016}}
{{Use American English|date=March 2022}}
{{Infobox road
| state = AR
| type = I
| route = 555
| map = {{maplink-road |from=Interstate 555.map }}
| map_custom = yes
| map_notes = I-555 highlighted in red
| length_mi = 49.57
| length_ref = {{Cite web |last=Starks |first=Edward |date=January 27, 2022 |title=Table 2: Auxiliary Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways |url=https://www.fhwa.dot.gov/planning/national_highway_system/interstate_highway_system/routefinder/table02.cfm |access-date=December 27, 2023 |work=FHWA Route Log and Finder List |publisher=Federal Highway Administration |archive-date=July 3, 2017 |archive-url=https://web.archive.org/web/20170703182115/https://www.fhwa.dot.gov/planning/national_highway_system/interstate_highway_system/routefinder/table02.cfm |url-status=live }}
| established = {{start date|2016|03|11}}{{cite news |first = Johnathan |last = Reaves |date = March 9, 2016 |title = I-555 to Be Dedicated Friday in Jonesboro |url = http://kasu.org/post/i-555-be-dedicated-friday-jonesboro#stream/0 |location = Jonesboro, Arkansas |publisher = KASU-FM |access-date = March 10, 2016 |archive-date = March 10, 2016 |archive-url = https://web.archive.org/web/20160310102409/http://kasu.org/post/i-555-be-dedicated-friday-jonesboro#stream/0 |url-status = live }}{{cite news |title = 40 Years in the Making, I-555 in Arkansas Becoming Reality |url = http://katv.com/news/local/40-years-in-the-making-i-555-in-arkansas-becoming-reality |location = Little Rock, Arkansas |publisher = KATV-TV |agency = Associated Press |date = March 10, 2016 |access-date = March 11, 2016 |archive-date = March 12, 2016 |archive-url = https://web.archive.org/web/20160312005134/http://katv.com/news/local/40-years-in-the-making-i-555-in-arkansas-becoming-reality |url-status = live }}
| spur_type = I
| spur_of = 55
| direction_a = South
| terminus_a = {{Jct|state=AR|I|55|US|61|US|78|AR|77}} in Turrell
| junction = {{jct|state=AR|US|49|US|63|US|78|AR|18}} in Jonesboro
| direction_b = North
| terminus_b = {{Jct|state=AR|US|63|AR|18|AR|91}} in Jonesboro
| counties = Crittenden, Poinsett, Craighead
| previous_type = AR
| previous_route = 549
| next_type = AR
| next_route = 612
}}
Interstate 555 (I-555) is an Interstate Highway connecting I-55 in Turrell with Highway 91 in Jonesboro. It provides a complete freeway corridor between Jonesboro, Arkansas's fifth-largest city, and Memphis, Tennessee. Formerly known as U.S. Route 63 (US 63), the highway was converted in the early 2000s to Interstate Highway standards. I-555 was dedicated in March 2016.
Route description
File:Interstate 555 exit 44.jpg
I-555 begins at an interchange of I-55, US 61, and AR 77 in Turrell. I-55 goes south to Memphis, Tennessee. The road parallel to the Interstate, AR 463, is a former alignment of US 63. I-555 passes through farmland and Gilmore. Then, it passes through Tyronza and Marked Tree. The section between Marked Tree and Payneway is also used for farm equipment vehicles to drive on. Next, it passes through Trumann before entering Jonesboro. It briefly has an overlap with US 49. I-555 ends in Jonesboro at an interchange with AR 91; from there, the road continues as US 63.
History
The I-555 route was approved on January 10, 2001, consisting of a widened section of US 63 between Turrell to Jonesboro to Interstate Highway standards. A few mainline bridges between Marked Tree and Turrell are from original two-lane US 63 and are narrower than current standards, but I-530 was approved in 1999 despite having a similar issue.
The last requirement to formally designate this route as I-555 was the construction of a parallel access road across a floodway between Payneway and Marked Tree, so that farm equipment would no longer have to use US 63 to cross the floodway. No crossing has ever been built, but an exemption for agricultural vehicles was added to I-555 between Marked Tree and Payneway. The exemption was introduced by U.S. Representative Rick Crawford and passed as part of the House Transportation Bill on December 4, 2015. It was announced in December 2015 that I-555 would be officially designated in early 2016.{{cite news |url = http://swtimes.com/news/state-news/highway-commission-approves-i-555-designation-section-us-63 |title = Highway Commission Approves I-555 Designation for Section of US 63 |agency = Arkansas News Bureau |date = December 3, 2015 |work = Times Record |access-date = January 28, 2016 |archive-date = February 6, 2016 |archive-url = https://web.archive.org/web/20160206055400/http://swtimes.com/news/state-news/highway-commission-approves-i-555-designation-section-us-63 |url-status = dead }} In early 2016, signs along the section of the highway cautioned travelers that there may be farm equipment driving on the roadway. The road was officially dedicated on March 11, 2016, in Jonesboro.{{Cite web |date=2016-03-12 |title=After delays, leg of U.S. 63 named I-555 {{!}} Arkansas Democrat Gazette |url=https://www.arkansasonline.com/news/2016/mar/12/after-delays-leg-of-u-s-63-named-i-555-/ |access-date=2024-05-16 |website=www.arkansasonline.com |language=en}} In 2021, US 63 was rerouted off the entire route of I-555, but a short extension on November 23 of that same year redesignated US 63 along a section of I-555 again.{{cite news |title = Highway 63 in Jonesboro redesignated as I-555 |url = https://talkbusiness.net/2021/11/highway-63-in-jonesboro-redesignated-as-i-555/ |access-date = May 22, 2023 |work = Talk Business & Politics |date = November 23, 2021 |archive-date = May 22, 2023 |archive-url = https://web.archive.org/web/20230522204239/https://talkbusiness.net/2021/11/highway-63-in-jonesboro-redesignated-as-i-555/ |url-status = live }}
Future
ARDOT is currently running studies that will determine whether improvements to interchanges and cross-streets are needed for I-555 in Craighead County. Public meetings about the study were held in December 2021 and October 2023.{{cite web |title=Interstate 555 Corridor Study |url=https://www.ardot.gov/divisions/planning/project-planning/planning-studies/interstate-555-corridor-study/ |publisher=Arkansas Department of Transportation |access-date=April 17, 2024}} Comments about the study were also requested between October and December 2023.{{cite news |title=ARDOT to hold public meeting for Interstate 555 |url=https://www.kait8.com/2023/10/21/ardot-hold-public-meeting-interstate-555/ |access-date=April 17, 2024 |work=KAIT 8 |location = Jonesboroo, Arkansas |publisher = KAIT-TV |date=October 21, 2023 |language=en}}{{cite web |title=Public Meeting 101113 I-555 Jonesboro Planning Study EN |url=https://public-meeting-i555-planning-study-ardot.hub.arcgis.com/ |publisher=Arkansas Department of Transportation |access-date=April 17, 2024 |language=en-us}}
Exit list
{{jcttop|exit}}
{{ARint|exit
|county=Crittenden
|cspan=2
|type=concur
|location=Turrell
|mile=0.0
|exit=1
|road={{jct|state=AR|I|55|US|61|dir2=south|AR|77|dir3=south|US|78|city1=Turrell|city2=Blytheville|city3=West Memphis}}
|notes=Southern end of AR 77 concurrency; I-55 exit 23; signed as exits 1A (I-55/US 61 south) and 1B (I-55 north); US 61 north and AR 77 south continue past interchange
}}
{{ARint|exit
|location=Gilmore
|type=concur
|mile=1.9
|exit=2
|road={{jct|state=AR|AR|77|dir1=north|city1=Gilmore}}
|notes=Northern end of AR 77 concurrency
}}
{{ARint|exit
|county=Poinsett
|cspan=7
|location=none
|mile=7.1
|exit=7
|road={{jct|state=AR|AR|135|city1=Lepanto}}
}}
{{ARint|exit
|location=Tyronza
|mile=8.7
|exit=8
|road={{jct|state=AR|AR|118|city1=Tyronza}}
}}
{{ARint|exit
|location=Marked Tree
|lspan=2
|mile=13.2
|exit=13
|road={{jct|state=AR|AR|149|city1=Marked Tree|city2=Earle}}
}}
{{ARint|exit
|mile=14.2
|exit=14
|road={{jct|state=AR|AR|75|dir1=south|city1=Marked Tree|city2=Lepanto|city3=Parkin}}
}}
{{ARint|exit
|location=none
|mile=18.2
|exit=18
|road={{jct|state=AR|AR|14|dir1=west|city1=Payneway|city2=Harrisburg}}
}}
{{ARint|exit
|location=none
|mile=24.0
|exit=24
|road={{jct|state=AR|AR|463|city1=Trumann}}
|notes=Former US 63
}}
{{ARint|exit
|location=Trumann
|mile=28.7
|exit=29
|road={{jct|state=AR|AR|69|city1=Trumann}}
}}
{{ARint|exit
|county=Craighead
|cspan=10
|location=Bay
|mile=34.6
|exit=35
|road={{jct|state=AR|AR|463|name1=AR 158|city1=Bay}}
|notes=Former US 63
}}
{{ARint|exit
|location=Jonesboro
|lspan=9
|mile=36.2
|exit=36
|road=Nestlé Road
}}
{{ARint|exit
|type=concur
|mile=39.1
|exit=39
|road={{jct|state=AR|US|78|dir1=east|AR|18S|dir2=east|name2=Dr. Martin Luther King Drive}}
|notes=Southern end of US 78 concurrency
}}
{{ARint|exit
|mile=40.3
|exit=40
|road={{jct|state=AR|AR|463|dir1=south|name1=Nettleton Avenue}}
|notes=Former US 63
}}
{{ARint|exit
|type=concur
|mile=41.7
|exit=42
|road={{jct|state=AR|US|49|dir1=north|AR|1|name2=Stadium Boulevard / Red Wolf Boulevard|road|Caraway Road|city1=Paragould}}
|notes=Southern end of US 49 concurrency; former AR 173
}}
{{ARint|exit
|mile=43.4
|exit=44
|road={{jct|state=AR|AR|1B|dab1=Jonesboro|name1=Harrisburg Road}}
}}
{{ARint|exit
|type=concur
|mile=44.8
|exit=45
|road={{jct|state=AR|US|49|dir1=south|US|63|dir2=south|dir4=east|US|78|AR|18|dir3=west|name4=Southwest Drive}}
|notes=Northern end of US 49/US 78 concurrency; southern end of US 63/AR 18 concurrency
}}
{{ARint|exit
|mile=45.8
|exit=46
|road={{jct|state=AR|AR|226|dir1=west|name1=Wood Springs Road|road|Strawfloor Road}}
}}
{{ARint|exit
|mile=47.1
|exit=47
|road=Washington Avenue
}}
{{ARint|exit
|type=concur
|mile=49.4
|exit=49
|road={{jct|state=AR|AR|91|name1={{jct|state=AR|AR|18|dir1=west|noshield=yes}} / Dan Avenue|US|63|dir2=north}}
|notes=Northern end of AR 18 concurrency; northern end of freeway; northern terminus of I-555
}}
{{jctbtm|exit|keys=concur}}
References
{{Reflist}}
External links
{{Attached KML}}
- [http://www.interstate-guide.com/i-555_ar.html Interstate 555 Arkansas]
- [https://web.archive.org/web/20070927005149/http://www.kait8.com/Global/story.asp?s=6249236 Putting the "Future" in I-555] (KAIT-TV)
{{3di|55}}
Category:Transportation in Crittenden County, Arkansas