Jiamin line
{{Short description|Future rail line in Shanghai, China}}
{{Infobox rail line
| name =
| other_name = L3 (planned name Shanghai Metro)
Line 17 (planned name Shanghai Metro up to 2011)
| logo = {{huge|{{rint|shanghai|Jiamin}}}}
| logo_width =
| color = {{rcr|SHM|jm}}
| image =
| image_width = 265px
| image_alt =
| caption =
| type = Commuter rail
| system = Shanghai Suburban Railway
| status = Under construction
| start = {{stl|SHM|Yindu Road}}
| end = {{stl|SHM|Chengbei Road}}
| connectinglines = {{rint|shanghai|1}} {{rint|shanghai|2}} {{rint|shanghai|5}} {{rint|shanghai|9}} {{rint|shanghai|10}} {{rint|shanghai|11}} {{rint|shanghai|12}} {{rint|shanghai|13}} {{rint|shanghai|14}} {{rint|shanghai|22}} {{rint|shanghai|25}} {{RouteBox|Airport Link|Airport Link line (Shanghai Suburban Railway)|#bbbbbb|white|}}
| stations = 15
| routes =
| yearcommenced = {{Start date and age|2021|06|28}}
| open =
| close =
| owner =
| operator = Shentong Metro Group
| character =
| depot =
| stock = China Railway CRH6
| linelength = {{convert|44.04|km|mi|0|abbr=on}} km
| tracklength =
| tracks = 2
| gauge = {{RailGauge|1435mm}}
| electrification = Overhead lines (AC 25 kV)
| speed = {{convert|160|km/h|0|abbr=on}}
| elevation =
| website =
| map =
| map_state = collapsed
}}
Jiamin line ({{zh|s=嘉闵线|p=Jiāmǐn xiàn}}) is a commuter rail line currently under construction on the Shanghai Suburban Railway, and will be run by Shentong Metro Group.{{cite news | title = 上海规土局:机场联络线和嘉闵线已明确采用市郊铁路制式| publisher = 澎湃新闻 | date = 2016-08-10 | url=http://www.thepaper.cn/newsDetail_forward_1511321 | language = zh }} It runs from {{stl|SHM|Yindu Road}} in Minhang District to {{stl|SHM|Chengbei Road}} in Jiading District.{{cite web|title=上海市轨道交通嘉闵线(城北路站—银都路站)选线专项规划(草案公示)|url=http://www.shsttz.cn/STTZOAGS/ext_resource/notice2.pdf|date=2020-11-13|accessdate=2020-11-15|archive-url=https://web.archive.org/web/20201113115545/http://www.shsttz.cn/STTZOAGS/ext_resource/notice2.pdf|archive-date=2020-11-13}} Construction started on 28 June 2021. The line is expected to open in 2027.{{cite web|url=http://jtw.sh.gov.cn/jtyw/20210701/ebe058bd1e3c4664ad888a8090bd2a1e.html|date=2021-07-01|title=本市17个交通建设工程集中开工 全面构建"五个新城"综合交通体系}}
Proposed Stations
File:Shanghai Commuter Rail Jiamin Line 2025.png
class="wikitable"
! rowspan="2" | Connections ! colspan="2" rowspan="2" | Distance ! rowspan="2" | Location ! rowspan="2" | Open- |
{{small|English}}
! {{small|Chinese}} |
---|
style = "background:#{{rcr|SHM|Jiamin}}; height: 2pt"
| colspan = "7" | |
{{stl|SHM|Yindu Road}}
|{{large|{{lang|zh-cn|银都路}}}} |{{rint|shanghai|5}} |0.0 |0.0 |rowspan="8"|Minhang |rowspan="15"|Phase I |
{{stl|SHM|Xinjian Road}}
|{{large|{{lang|zh-cn|莘建路}}}} |{{rint|shanghai|1}}Extension of the line under planning. (via Humin Road/North Xinzhuang Station) | 2.123 | 2.123 |
{{stl|SHM|Qixin Road}}
|{{large|{{lang|zh-cn|七莘路}}}} |{{rint|shanghai|12}} | 2.991 | 5.114 |
{{stl|SHM|Qibao}}
|{{large|{{lang|zh-cn|七宝}}}} |{{rint|shanghai|9}} | 2.843 | 7.957 |
{{stl|SHM|Huxing Road}}
|{{large|{{lang|zh-cn|沪星路}}}} |{{rint|shanghai|25}}Line under planning. | 1.218 | 9.175 |
{{stl|SHM|Yingbinsan Road}}
|{{large|{{lang|zh-cn|迎宾三路}}}} | | 2.079 | 11.254 |
{{stl|SHM|Hongqiao Airport Terminal 2}}
|{{large|{{lang|zh-cn|虹桥2号航站楼站}}}} |{{rint|shanghai|2}}{{rint|shanghai|10}} {{rint|shanghai|17}}(via {{Stl|SHM|Hongqiao Railway Station}}) |
{{nowrap|{{rint|cn|crh|link=Shanghai Hongqiao railway station}}}}{{nowrap| AOH}}
| 2.417
| 13.671
|-
|{{stl|SHM|Tianshan Road}}
|{{large|{{lang|zh-cn|天山路}}}}
|
| 2.859
| 16.530
|-
|{{stl|SHM|Jinyun Road}}
|{{large|{{lang|zh-cn|金运路}}}}
|{{rint|shanghai|13}}
| 2.250
| 18.780
|rowspan="7"|Jiading
|-
|{{stl|SHM|Lexiu Road}}
|{{large|{{lang|zh-cn|乐秀路}}}}
|{{rint|shanghai|14}}
| 3.275
| 22.075
|-
|{{stl|SHM|Nanxiang}}
|{{large|{{lang|zh-cn|南翔}}}}
|{{rint|shanghai|11}}{{rint|shanghai|22}}Line under construction.
| 3.815
| 25.870
|-
|{{stl|SHM|Fengmao Road}}
|{{large|{{lang|zh-cn|丰茂路}}}}
|
| 7.179
| 33.049
|-
|{{stl|SHM|Jiajian Highway}}
|{{large|{{lang|zh-cn|嘉戬公路}}}}
|
| 3.236
| 36.285
|-
|{{stl|SHM|Xincheng Road}}
|{{large|{{lang|zh-cn|新成路}}}}
|
| 3.883
| 40.168
|-
|{{stl|SHM|Chengbei Road}}
|{{large|{{lang|zh-cn|城北路}}}}
|{{rint|shanghai|11}} (via {{stl|SHM|North Jiading}})
| 3.086
| 43.255
|- style = "background:#{{rcr|SHM|Jiamin}}; height: 2pt"
| colspan = "7" |
|}
=Important stations=
Except for the Hongqiao hub section, which is laid on the ground, the length of the ground section is 2.68 kilometers, and the rest are all underground sections, the length of which is 41.36 kilometers. There are 14 underground stations and 1 ground station on the whole line. It adopts EMU trains with a maximum operating speed of 160 km/h, and a combined fast and slow train transportation mode.[https://www.seetao.com/details/82868.html The work report of the Jiamin Line of Shanghai Metro City Line was approved]
The line has double island platforms in some stations, allowing express/local services.
=Future extensions=
File:Shanghai Commuter Rail Jiamin Line 2025.svg The line is expected to be extended north to Taicang in neighboring Jiangsu Province in the future.[http://english.shanghai.gov.cn/nw48081/20201106/ac71c519dfc649e4a5482c13e549422d.html New railway to connect Minhang with Jiading]
References
{{reflist}}
Notes
{{reflist|group=note}}
{{Shanghai}}
{{Shanghai transit}}
{{Shanghai Metropolitan Area Intercity Railway}}
{{Regional and commuter rail transit in China}}
{{Rapid transit in China}}
Category:Shanghai Suburban Railway lines
Category:Proposed buildings and structures in Shanghai
{{Shanghai-metro-stub}}