Jiaxing Tram
{{Short description|Tram service in Jiaxing, China}}
{{Expand Chinese|date=July 2021|topic=transp}}
{{use dmy dates|date=June 2021}}
{{Infobox public transit
| box_width =
| name = Jiaxing Tram
| image = Jiaxing Tram, 2021-10-30 08.jpg
| alt =
| imagesize = 275px
| caption = Jiaxing Tram in October 2021
| image2 =
| alt2 =
| imagesize2 =
| caption2 =
| image3 =
| alt3 =
| imagesize3 =
| caption3 =
| native_name =
| owner =
| area served = Jiaxing, Zhejiang, China
| locale =
| transit_type = Tram
| lines = 1
| line_number =
| start =
| end =
| stations = 12
| daily_ridership =
| annual_ridership =
| chief_executive =
| headquarters =
| website =
| began_operation = {{Start date and age|2021|06|25}}
| operation_will_start =
| ended_operation =
| operator = Shanghai Keolis
| marks =
| host =
| character =
| stock =
| vehicles = 20
| train_length =
| headway =
| system_length = {{convert|11.2|km|mi|abbr=on}}
| notrack =
| track_gauge =
| ogauge =
| minimum_radius_of_curvature =
| el =
| average_speed =
| top_speed =
| map =
| map_name =
| map_state =
}}
Jiaxing Tram ({{zh|s=嘉兴有轨电车}}) is a tram system in Jiaxing, Zhejiang Province, China. There are seven lines planned for construction, which will span a length of about {{convert|98|km|mi}}.{{cite web|url= https://zj.zjol.com.cn/openapi/uc_rss/uc_news/1283266.html|title= 怎么规划?工期多长?十问嘉兴有轨电车线|date= 2019-09-08|language= zh|access-date= 6 March 2022|archive-date= 6 March 2022|archive-url= https://web.archive.org/web/20220306023452/https://zj.zjol.com.cn/openapi/uc_rss/uc_news/1283266.html|url-status= dead}}
History
File:Jiaxing Tram Planning.svg
Jiaxing first disclosed the rail plan in 2015.{{cite web|url=http://www.cnjxol.com/xwzx/jxxw/jxshxw/content/2015-06/12/content_3371438.htm|title=线网规划方案来了,轨道交通还会远吗? - 嘉兴在线|date=12 June 2015|archive-url=https://web.archive.org/web/20171006161659/http://www.cnjxol.com/xwzx/jxxw/jxshxw/content/2015-06/12/content_3371438.htm|archive-date=6 October 2017|language=zh|url-status=dead}} On 16 September 2019, the Jiaxing Municipal People's Government approved the construction plan of the tram for 2019–2023.{{cite web|url=http://www.cp-xinxi.cn/cpfc/90200.html|title=嘉兴市现代有轨电车线网规划获批复通过|website=Changping Information Network|date=29 March 2020|language=zh}}{{Dead link|date=October 2024 |bot=InternetArchiveBot |fix-attempted=yes }} The plan was also approved by the Zhejiang Provincial Development and Reform Commission on 9 December 2019, and the preliminary design of the first phase of the project was approved on 17 April 2020 by the same commission.{{cite web|url=https://zj.zjol.com.cn/news.html?id=1431792|archive-url=https://web.archive.org/web/20220802030755/https://zj.zjol.com.cn/news.html?id=1431792|url-status=dead|archive-date=2 August 2022|title=嘉兴有轨电车T1、T2一期工程初步设计获省发改委批复|website=Zhejiang Online|date=18 April 2020|language=zh}}
On 28 December 2019, the tram started construction at the hub of the Jiaxing railway station,{{cite web|url=https://mp.weixin.qq.com/s/m-U9rpAxTUzfiwfsvsaUtA|title=最新线路图曝光!沪嘉城际最新消息来了|date=28 December 2019|website=mp.weixin.qq.com|language=zh}} and construction of the whole line of the first phase began in May 2020.{{cite web|url=http://www.cnjxol.com/51/202005/t20200515_618052.shtml|title=关注!嘉兴有轨电车一期开工,施工期间如何通行,交通引导措施怎么看?|website=Jiaxing Online|date=15 May 2020|language=zh|access-date=1 May 2022|archive-date=26 December 2021|archive-url=https://web.archive.org/web/20211226024204/https://www.cnjxol.com/51/202005/t20200515_618052.shtml|url-status=dead}}
On 5 November 2020, the first box substation of the first phase was moved to basis, and the leveling, installation, and connection of the equipment was completed.{{cite web|url=https://mp.weixin.qq.com/s/ItOKfFVcoVqiXvjLPYXcYg|title=嘉兴有轨电车又有新进度|website=Jiaxing Daily|date=7 November 2020|language=zh}} On the 14th of the same month, the first set of turnouts began to be laid.{{cite web|url=https://mp.weixin.qq.com/s/n27nqLUuNTIUCj_fnoE8pg|title=首组道岔开始铺设!嘉兴有轨电车项目快速推进|date=14 November 2020|website=mp.weixin.qq.com|language=zh}} On the 17th, the platform design plan was released.{{cite web|url= https://mp.weixin.qq.com/s/BoGuazI2I1ChOwNgJhJLgg|title= 嘉兴有轨电车站台,长这样!方案设计图要不要看|date=17 November 2020|website=mp.weixin.qq.com|language=zh}} On the afternoon of 11 December, the beam and slab erection of the first bridge of the T1 line was completed. This marked that the rail laying construction of the first phase had entered a comprehensive stage.{{cite web|url=https://mp.weixin.qq.com/s/wW5tPzqHIt8toHR8uFtQ2A|title=计划明年2月完成铺轨!嘉兴有轨电车一期工程的最新进展都在这里......|website=mp.weixin.qq.com|language=zh}} In the same month, the Operations Control Center (OCC) completed the structural capping.{{cite web|url= https://mp.weixin.qq.com/s/-ajT_mmYBoFOM5byG5N9ag|title= 来了,来了,他们来了!嘉兴有轨电车项目又迎来一批重量级参观团队|date=21 December 2020|website=mp.weixin.qq.com|language=zh}} In January 2021, the subgrade pile foundation of the first phase was completed.{{cite web|url= https://mp.weixin.qq.com/s/_Px93H2UpHevow1RW0bkpQ|title= 决战一季度 誓夺开门红!刚刚,嘉兴市有轨电车一期工程吹响冲锋号角|date=11 January 2021|website=mp.weixin.qq.com|language=zh}}
The first phase, a {{convert|10.6|km|mi}} long stretch from Jiaxing South railway station to Fanggong Road Binhe Road stop ({{zh|s=纺工路滨河路站}}), opened on 25 June 2021.{{cite web |title=浙江首条有轨电车一期工程示范段今天开通 出站徒步10分钟可到南湖纪念馆 |url=http://newsxmwb.xinmin.cn/chengsh/2021/06/25/31981425.html |publisher=Xinmin.cn |access-date=2021-06-26 |language=zh |date=2021-06-25}} From opening until 7 October 2021, passengers could travel for free.{{cite web |title=嘉兴市有轨电车一期工程示范段开通公告 |url=https://mp.weixin.qq.com/s/2iYNaC613qOnDqyK6u5x-w |publisher=QQ |access-date=2021-06-26 |language=zh |date=2021-06-24}} It extended for 1 station ({{convert|0.6|km|mi}}) to Jiaxing railway station on 15 January 2022.{{cite web|url=https://mp.weixin.qq.com/s/B9L4AEJYhL4bATEfhz9Zdw|title=有轨电车嘉兴火车站开通载客公告|date=2022-01-14}}
References
{{reflist}}
{{Tram-stub}}
{{China-stub}}
{{Northern Zhejiang transit}}
{{Rapid transit in the People's Republic of China}}
Category:Tram transport in China
Category:Transport in Zhejiang