KEGOC
{{Short description|Astana-based state company of Kazakhstan}}
{{Infobox company
| name = KEGOC JSC
| logo = frameless
| logo_caption =
| image =
| image_caption =
| trading_name =
| native_name = Казахстанская компания по управлению электрическими сетями, Kazakhstan Electricity Grid Operating Company
| native_name_lang = kk
| romanized_name =
| former type =
| type = Quasi-public corporation
| traded_as = {{KASE|KEGC}}
| industry = Power engineering
| fate =
| predecessor =
| successor =
| foundation = {{Start date|1997|07|11|df=y}}
| founder =
| defunct =
| hq_location = Kazakhstan: Astana
| locations =
| area_served =
| key_people = Nabi Aitzhanov(CEO){{Cite web|url=https://kase.kz/en/news/show/1506467|title = N. Aitzhanov elected as Chairman of Management Board of KEGOC JSC}}
| products = Electrical grid
| services = Electric power transmission
| revenue =
| operating_income =
| net_income =
| assets =
| equity =
| owner =
| num_employees = >4 thousand (2020)
| parent = Samruk Kazyna(90%)
| divisions =
| subsid = {{Unbulleted list|EnergoInform JSC (100%){{Cite web|url=http://www.energoinform.kz/en|title=АО "Энергоинформ"|access-date=2020-12-04|archive-date=2023-10-02|archive-url=https://web.archive.org/web/20231002235313/https://energoinform.kz/en/|url-status=dead}}|Financial Settlement Centre for Renewable Energy Sources LLP (FSC RES)(100%){{Cite web|url=https://rfc.kegoc.kz/en|title=Financial Settlement Center of Renewable Energy LLP|access-date=2020-12-04|archive-date=2020-10-21|archive-url=https://web.archive.org/web/20201021135300/https://rfc.kegoc.kz/en|url-status=dead}}|Batys Transit(20%){{cite web|title=Batys Transit Home Page|url=http://en.bttr.kz/|archive-url=https://web.archive.org/web/20220516105559/http://en.bttr.kz/|archive-date=2022-05-16|access-date=2024-09-17}}}}
| homepage = {{URL|https://www.kegoc.kz/en}}
| footnotes =
| intl =
| bodystyle =
}}
Kazakhstan Electricity Grid Operating Company (KEGOC) joint-stok company is an Astana-based state company of Kazakhstan established in 1997.{{Cite web|title=Презентация на тему: "Kazakhstan Electricity Grid Operating Company KEGOC By Nigmetullina Guldana 301 group.". Скачать бесплатно и без регистрации.|url=http://www.myshared.ru/slide/1331526/|access-date=2021-09-05|website=www.myshared.ru|language=ru}}
General information
KEGOC is the System Operator of the Unified Power System (UPS) of Kazakhstan, and it owns and manages the assets of the National Power Grid (NPG). The company operates as the natural monopoly.{{Cite web|title=Kazakhstan Electricity Grid Operating Company (KEGOC)|url=https://www.fitchratings.com/research/corporate-finance/kazakhstan-electricity-grid-operating-company-kegoc-30-04-2020|access-date=2021-12-15|website=www.fitchratings.com}}
The company employs more than 4 thousand people.
KEGOC is a subsidiary of Samruk-Kazyna Sovereign Welfare Fund JSC.{{Cite web|title=Samruk-Kazyna JSC 2016_VOLUME 1.pdf|url=https://www.ifswf.org/sites/default/files/annual-reports/Samruk-Kazyna%20JSC%202016_VOLUME%201.pdf}}
In December 2014, the company was listed on the Kazakhstan Stock Exchange as part of the "People's IPO" programme.{{Cite news|author=|date=2014-11-04|title=Kazakh national grid company aims to raise $73 mln in IPO|language=en|work=Reuters|url=https://www.reuters.com/article/kegoc-ipo-idINL6N0SU24120141104|access-date=2021-09-05}} KEGOC floated 10% minus one share. The minority shareholder structure included 7.3% of individuals. The demand exceeded supply by 1.5 times.
Projects
Completed projects:
- Kazakhstan Electricity Transmission Rehabilitation Project, stage 1 (2000—2010);
- Construction of 500 kV Second Transmission Line of Kazakhstan North-South Transit (2004—2009);
- Alma Electricity Transmission Project (2009—2014);
- Moinak Electricity Transmission Project (2010—2012);
- Ossakarovka Transmission Rehabilitation Project (2010—2014);
- Construction of 500 kV North-South-East transmission line. stage 1. Construction of 500 kV Ekibastuz — Shulbinsk HPP — Ust-Kamenogorsk transmission line (2011—2017);
- Construction of 500 kV North-South-East transmission line. stage 2. Construction of 500 kV North-South-East transmission line Construction of 500 kV Shulbinsk HPP — Aktogai — Taldykorgan - Alma transmission line (2012—2018);
- Pavlodar Electricity Transmission Reinforcement (2011—2019);
- Kazakhstan Electricity Transmission Rehabilitation Project, phase 2 (2010—2019).
Ongoing projects:
- Rehabilitation of 220-500 kV OHTLs in Aktyubinskiye MES branch, Zapadnye MES branch and Sarbaiskiye MES branch of KEGOC, Stage I (2018—2022);
- West Kazakhstan Electricity Transmission Reinforcement Project: Construction of power grid facilities (2018—2023);
- Turkestan External Power Supply Reinforcement Project: Construction of power grid facilities (2019—2022).
Subsidiaries
KEGOC has subsidiaries: [http://www.energoinform.kz/en EnergoInform JSC] {{Webarchive|url=https://web.archive.org/web/20231002235313/https://energoinform.kz/en/ |date=2023-10-02 }} (100% of shares) and Financial Settlement Centre for Renewable Energy Sources LLP (FSC RES) (100% of participation shares).
EnergoInform is engaged in maintenance of the telecom equipment in the national power grid and provide telecom support for the KEGOC's operations.
[https://rfc.kegoc.kz/en Financial Settlement Centre for Renewable Energy Sources LLP (FSC RES LLP)] {{Webarchive|url=https://web.archive.org/web/20201021135300/https://rfc.kegoc.kz/en |date=2020-10-21 }} was established in 2013 to encourage investments in renewable energy sector and increase the share of renewable energy in Kazakhstan's energy mix through government-guaranteed and centralized electricity purchase of all electricity produced by all renewable energy facilities (who have chosen such support scheme) in accordance with the fixed rates. Also FSC RES LLP was assigned by the Minister of Energy of the Republic of Kazakhstan (order No. 357 dated 7 September 2018 ) the single buyer of centralized procurement of services service of maintaining the readiness of electric capacity and centralized provider of services of ensuring readiness of electricity capacity to bear the power load (capacity market operator).
KEGOC is also a co-founder (20% of shares) of [http://en.bttr.kz/ Batys Transit JSC] {{Webarchive|url=https://web.archive.org/web/20210418043657/http://en.bttr.kz/ |date=2021-04-18 }} established in 2005 to implement the project for construction of inter-regional power transmission line linking North Kazakhstan with Aktobe oblast.{{Cite web|title=Annual Report 2017. KEGOC JSC.|url=https://www.kegoc.kz/sites/default/files/content-manager/annual_report_2017.pdf|access-date=2021-09-05|archive-date=2021-07-09|archive-url=https://web.archive.org/web/20210709180438/https://www.kegoc.kz/sites/default/files/content-manager/annual_report_2017.pdf|url-status=dead}}
See also
{{Portal|Energy}}
- [https://www.gov.kz/memleket/entities/energo?lang=en Ministry of Energy of Kazakhstan]
- [https://sk.kz/ Samruk Kazyna]
Notes
- [https://www.kegoc.kz/en/corporate/management-board Management board] {{Webarchive|url=https://web.archive.org/web/20201202102050/https://www.kegoc.kz/en/corporate/management-board |date=2020-12-02 }}
- [https://www.kegoc.kz/en/shareholders-and-investors/asset-structure Asset structure] {{Webarchive|url=https://web.archive.org/web/20201202090237/https://www.kegoc.kz/en/shareholders-and-investors/asset-structure |date=2020-12-02 }}
References
{{Reflist}}
External links
- [http://www.kegoc.kz/ Company website]
{{Index KASE}}
{{authority control}}
Category:Companies based in Astana
Category:Electric power companies of Kazakhstan
Category:Government-owned companies of Kazakhstan