Kabeli B1 Hydropower Station

{{Infobox dam

| name =Kabeli B - 1 Hydropower Station

| image =

| name_official = Kabeli B - 1 Hydropower Project

| location_map = Nepal

| location_map_size =

| location_map_caption =

| location_map_alt =

| coordinates = {{coord|27| 16| 23|N|87| 50| 10|E|type:landmark}}

| country = Nepal

| location = Panchthar District

| purpose = Power

| dam_crosses = Kabeli River| dam_type = Gravity

| dam_height =

| dam_length =

| construction_began =

| opening =

| status = o

| owner = Arun Kabeli Power Limited.| plant_name =

| plant_coordinates =

| plant_operator =

| plant_type = R

| plant_commission =2076-07-23 BS| plant_decommission =

| plant_hydraulic_head =

| plant_turbines =

| plant_capacity = 25 MW

| plant_annual_gen =

| extra =

}}

{{GeoGroupTemplate}}

Kabeli B1 Hydropower Station (Nepali: काबेली B-१ जलविद्युत आयोजना) is a 25 MW run-of-river hydro-electric plant located in Panchthar District of Nepal. The promoter and operator, with a 20% share, is Arun Kabeli Power Limited (AKPL), a subsidiary of Arun Valley Group.

Location and water supply

Kabeli B1 Hydropower Station is a run-of-the-river hydroelectricity station located in the Panchthar and Taplejung districts of Mechi Zone in the Eastern Development Region of Nepal.

It is about {{convert|8|km}} from the city of Ganesh Chowk.{{sfn|Nepal, Kabeli B1 – Andritz}}

It is along the Kabeli River near where it is joined by the Iwa River.{{sfn|ICRA Nepal assigns [ICRANP] IPO Grade 4+... |p=2}}

The flow is used to generate 25 MW electricity.{{sfn|25 MW power of Kabeli B-1 has been connected}}{{Cite web| title = काबेली र हेवा अघि बढाए २५ सय मेगावाटको तमोर गुम्ने खतरा| work = Online Khabar| accessdate = 2020-11-30| url = https://www.onlinekhabar.com/2017/08/615055}}

Construction

The Kabeli B-1 project was launched in December 2010.{{sfn|Keshav Prasad Bhattarai|2019}}

Palanchowk Construction Company undertook civil works and Api Hydromechanical Company undertook hydro-mechanical work.

Palanchowk and Api are both affiliated with the Arun Valley Group, the project promoter.

Andritz Hydro Pvt of India and the associated Neon Energy Pvt of India won the electromechanical contract.{{sfn|ICRA Nepal assigns [ICRANP] IPO Grade 4+... |p=2}}

The Ministry of Energy approved an initial environmental examination report on 27 August 2012 and granted a power generation license on 12 July 2013.

As of mid-March 2016 construction was 25% complete.{{sfn|ICRA Nepal assigns [ICRANP] IPO Grade 4+... |p=2}}

As of 2017 the project was one of 37 being built in the Eastern Region of Nepal.{{sfn|Bijay Bodh Lawati|2017}}

In November 2017 Arun Kabeli Power Limited reported that 95% of construction was completed, and test production could begin in mid-February 2018.{{sfn|Construction of Kabeli B1 Hydropower Project 95%}}

The civil works, hydro mechanical works and electromechanical works were mostly completed, including the dam, sedimentation reservoir, penstock pipeline, surge tank and powerhouse.{{sfn|Shahi Man Rai|2017}}

Six of the sixteen transmission line towers had been installed.

Structures still under construction included intake and tailrace gates and several intermediate gates, as well as installation of two turbines, governors, generators and transformers.{{sfn|Shahi Man Rai|2017}}

Test electricity generation began in September 2019, with plans to start normal power production within a month if the Nepal Electricity Authority gave permission to connect to the central transmission line.{{sfn|Kabeli B1 starts test power production}}

The plant started delivering electricity from 23 Ashwin 2076 BS, or 10 October 2019 CE.{{sfn|Power Plants :: Hydro (More than 1MW)}}

According to the Arun Kabeli Power Company, power delivery had been delayed by one year due to delays in completion of the third section of the transmission line.{{sfn|25 MW power of Kabeli B-1 has been connected}}

Technical description

File:River kabeli.jpg

The intake is in the Tharpu and Thumbedin VDCs.{{sfn|Nepal, Kabeli B1 – Andritz}}

It has a gross head of {{convert|93.7|m}}.{{sfn|Nepal, Kabeli B1 – Andritz}}

It consists of a barrage-type gated weir {{convert|36|m}} long and {{convert|4|m}} high with four {{convert|6|by|4|m}} gates and two {{convert|6|by|5|m}} sluices.

Water is led from the weir to a {{convert|140|by|14|m}} settling basin, from {{convert|7.18|to|10|m}} deep, divided into two rectangular bays.{{sfn|ICRA Nepal assigns [ICRANP] IPO Grade 4+... |p=2}}

From the de-sanding basin a {{convert|4.5|km}} headrace pipe with diameter {{convert|4|m}} carries the water to the power station.{{sfn|Nepal, Kabeli B1 – Andritz}}

At its lower end the conduit feeds into a vertical cylindrical concrete surge tank.

A {{convert|286|m}} steel penstock pipe from {{convert|3.75|to|2.65|m}} in diameter leads from the headrace pipe where it joins the surge tank shaft to the turbines in the power station.{{sfn|ICRA Nepal assigns [ICRANP] IPO Grade 4+... |p=2}}

Power is generated by two horizontal 12.5 MW Francis turbines.{{sfn|Nepal, Kabeli B1 – Andritz}}

These feed two generators with rated voltage of 6.3 kV.{{sfn|ICRA Nepal assigns [ICRANP] IPO Grade 4+... |p=2}}

The energy is carried to the national grid by the Mechi Corridor 132 kV transmission line from Damak to Amarpur in Panchthar district.{{sfn|Welcome to Arun Kabeli Power}}

The transmission line has 16 towers.{{sfn|Shahi Man Rai|2017}}

It is about {{convert|4|km}} long.{{sfn|ICRA Nepal assigns [ICRANP] IPO Grade 4+... |p=1}}

Planned annual power production was about 151.65 GWh.{{sfn|Nepal, Kabeli B1 – Andritz}}

Ownership and finance

The estimated cost as of November 2017 was Rs4.3 billion.

As of November 2017 70% of the project was owned by the state-owned Hydroelectricity Investment and Development Company with a consortium of banks including Nepal Investment Bank, Nabil Bank, Machhapuchchhre Bank, Prabhu Bank, Laxmi Bank and Global IME Bank.

20% was owned by the promoter Arun Kabeli Power Limited (AKPL), an Independent Power Producer.

The remaining 10% was reserved for the people of Panchthar and Taplejung.{{sfn|Shahi Man Rai|2017}}

Arun Kabeli Power Limited (AKPL) was incorporated on 17 January 2011 and is part of Arun Valley Hydropower Group.{{sfn|ICRA Nepal assigns [ICRANP] IPO Grade 4+... |p=2}}

AKPL signed agreements with the Nepal Electricity Authority to connect the station to the grid and to purchase the power in 2012.{{sfn|Shahi Man Rai|2017}}

The power purchase rate is Rs.4.80 per kW in the wet months (May to December) and Rs.8.40 per kW in the dry months (January to April).{{sfn|Welcome to Arun Kabeli Power}}

The generation licence will expire after 30 years in 27 Jesṭha 2105 BS, after which the plant will be handed over to the government.{{sfn|Power Plants :: Hydro (More than 1MW)}}

See also

References

{{reflist}}

{{Portal|Nepal|Water|Renewable energy}}

Sources

{{refbegin}}

  • {{Citation| title = 25 MW power of Kabeli B-1 has been connected to the national grid (काबेली बी–१ को २५ मेगावाट विद्युत राष्ट्रिय प्रणालीमा जोडियो)| language = ne| work = UrjaKhabar| accessdate = 2020-11-30| date = 2019-10-13| url = https://www.urjakhabar.com/archives21892/| ref = {{harvid|25 MW power of Kabeli B-1 has been connected}}| archive-date = 2020-02-15| archive-url = https://web.archive.org/web/20200215122231/http://www.urjakhabar.com/archives21892/| url-status = dead}}
  • {{Citation |title=560 MW electricity being generated in Eastern Region (पूर्वाञ्चलमा ५६० मेगावाट विद्युत उत्पादन हुँदै) |work=eHimalayatimes |accessdate=2020-11-30 |author=Bijay Bodh Lawati |url=https://ehimalayatimes.com/artha-corporate/22169 |language=ne |date=2017 |archive-date=2021-09-25 |archive-url=https://web.archive.org/web/20210925144812/https://ehimalayatimes.com/artha-corporate/22169 |url-status=dead }}
  • {{citation |url=http://www.nepalenergyforum.com/construction-of-kabeli-b1-hydropower-project-95-completed/ |title=Construction of Kabeli B1 Hydropower Project 95% Completed |date=4 December 2017 |work=Nepal Energy Forum |ref={{harvid|Construction of Kabeli B1 Hydropower Project 95%}} }}
  • {{citation |url=https://www.icranepal.com/wp-content/uploads/2019/11/34.-Arun-Kabeli-Power-Limited_Rationale_V3.pdf |accessdate=2020-12-01 |title=ICRA Nepal assigns [ICRANP] IPO Grade 4+ to the proposed initial public offering (IPO) of Arun Kabeli Power Company Limited |publisher=ICRA Nepal |ref={{harvid|ICRA Nepal assigns [ICRANP] IPO Grade 4+...}} }}
  • {{citation |url=https://thehimalayantimes.com/nepal/kabeli-b1-hydropower-project-starts-test-power-production/ |accessdate=2020-11-30 |title=Kabeli B1 starts test power production |date=18 September 2019 |journal=The Himalayan Times |ref={{harvid|Kabeli B1 starts test power production}} }}
  • {{Citation |title=ताप्लेजुङमा ५ सय मेगावाट विद्युत उत्पादनका लागि काम सुरु, ३५ मेगावाट तत्काल राष्ट्रिय प्रशारणमा जोडिने (Work started to generate 500 MW of electricity in Taplejung, 35 MW will be connected to national transmission immediately) |author=Keshav Prasad Bhattarai |year=2019 |work=Ujyaalo Online |accessdate=2020-11-30 |language=ne |url=https://ujyaaloonline.com/story/25332/2019/8/27/hydropower-company-start-work-in-taplejung }}
  • {{citation |url=https://www.andritz.com/hydro-en/hydronews/hydro-news-29/hy-news-hn29-31-nepal-kabeli-b1-hydro |accessdate=2020-11-30 |title=Nepal, Kabeli B1 |publisher=Andritz Group |ref={{harvid|Nepal, Kabeli B1 – Andritz}} }}
  • {{Citation |date=27 November 2020 |ref={{harvid|Power Plants :: Hydro (More than 1MW)}} |title=Power Plants :: Hydro (More than 1MW) |url=http://www.doed.gov.np/license/54 |accessdate=2020-11-30 }}
  • {{citation |url=https://kathmandupost.com/money/2017/11/19/kabeli-b1-hydro-project-to-be-completed-in-mid-feb |accessdate=2020-11-30 |author=Shahi Man Rai |date=19 November 2017 |work=Kathmandu Post |title=Kabeli B1 hydro project to be completed in mid-Feb }}
  • {{Citation |title = Welcome to Arun Kabeli Power |publisher = AKPL. |accessdate = 2020-11-23 |url = http://arunkabeli.com/ |ref = {{harvid|Welcome to Arun Kabeli Power}} }}

{{refend}}

Category:Hydroelectric power stations in Nepal

Category:Gravity dams

Category:Run-of-the-river power stations

Category:Dams in Nepal

Category:Irrigation in Nepal

Category:2019 establishments in Nepal

Category:Buildings and structures in Panchthar District