Kakkad Hydro Electric Project

{{more footnotes|date=March 2018}}

{{Use dmy dates|date=January 2020}}

{{Use Indian English|date=January 2020}}

{{Infobox dam

| name = Kakkad Hydro Electric Project

| name_official =

| image_caption = The dam as viewed from near the visitor center

| location_map_caption = Pathanamthitta

| coordinates =

| country = India

| purpose = Hydroelectric

| status = Completed

| construction_began = 1999

| owner = Kerala State Electricity Board

| plant_type = Hydro Power Plant

| plant_capacity = 50 MW (2 x 25 MW)

|website = [http://www.kseb.in Kerala State Electricity Board]

| image =

}}

The Kakkad Hydroelectric Power Plant is located near Seethathode, in the Pathanamthitta district of the Indian state of Kerala. It is operated by the Kerala State Electricity Board.{{Cite web|url=http://india-wris.nrsc.gov.in/wrpinfo/index.php?title=Kakkad_Hydroelectric_Project_JH01238|title=Kakkad Hydroelectric Project JH01238 -|website=india-wris.nrsc.gov.in|language=en|access-date=2018-03-20}}

This hydropower plant has a design capacity of 50 MWe. It has 2 turbines, commissioned in 1998 and 1999.

Features

The project is in the second stage of development. The installed capacity is 50 MW (2 x 25MW). This scheme utilizes the tail race water from Sabarigiri power station and water from the Moozhiyar and Velluthode rivers. Two dams store water for the powerhouse. The main reservoir is on the Moozhiyar. The second reservoir is formed by the Veluthodu dam, across the Velluthode river. After generating power, water is released to the Kakkad River. Ullunkal and Karikkayam power stations use this water for power generation and then release it into the Maniyar reservoir for power generation at the Maniyar power station.

class="wikitable"

|+ Kerala hydropower station

! Attribute !! Value

State NameKerala
DistrictPathanamthitta
RiverMoozhiyar, Veluthodu /Pamba
Basin NameWest flowing rivers from Tadri to Kanyakumari
Hydro Elec RegionSouthern HE Region
Total Installed Capacity (MW)50
Type of ProjectHydroelectric Powerplant
Project StatusCompleted
Project Owner TypeGovernment
Owner NameKerala State Electricity Board
Inter Basin ProjectNo
Project SharingNone
Inter State Agreement- (Ratio like 50:50)
International SharingNone

Related projects

References

{{Reflist}}