Kaniv Hydroelectric Power Plant

{{Short description|Hydroelectric power plant on the Dnieper in Kaniv, Ukraine}}

{{Infobox dam

| name = Kaniv Hydroelectric Power Plant

| image = Kn ges-1.jpg

| image_caption = The dam of Kaniv Hydroelectric Power Plant

| name_official =

| dam_crosses = Dnieper River

| location = Kaniv, Ukraine

| dam_type = power plant

| dam_length = {{Convert|343|m|ft|abbr=on}}

| dam_height = {{Convert|39.5|m|ft|abbr=on}}

| dam_width_base =

| spillway_type =

| spillway_capacity = {{Convert|13200|m3/s|ft3/s|0|abbr=on|lk=on}}

| construction_began = 1964

| opening = November 4, 1972 (first turbine) – April 16, 1975 (completion)

| cost =

| owner = Government of Ukraine

| res_name = (Run-of-river)

| res_capacity_total = {{Convert|2.6|km3|acre.ft|0|abbr=on}}

| res_catchment =

| res_surface =

| res_max_depth =

| plant_operator = Ukrhydroenergo

| plant_turbines = 24 x 18.5 MW

| plant_capacity = 444 MW

| plant_annual_gen = 972 GWh

| plant_commission =

| plant_decommission =

| location_map =Ukraine Cherkasy Oblast

| location_map_caption =

| coordinates = {{coord|49|45|59.5|N|31|28|18.2|E|type:landmark|display=inline,title}}

| website =

| extra =

}}

Kaniv Hydroelectric Power Plant is a hydroelectricity generating complex on the Dnieper river in Kaniv, Ukraine. It is operated by Ukrhydroenego, a subsidiary of the state-owned Energy Company of Ukraine. The dam has a {{convert|288|x|18|m}} single-stage, single chamber lock to enable travel along the Dnieper river.

History

Planning for the power plant's facilities was conducted by UkrHydroProject, a department of the Ukrainian State Research and Project Institute. Construction was contracted out to specialized construction companies, lasting from 1964 to 1972. The plant's turbines and generators were produced by the Kharkiv branches of Turboatom and Elektrovazhmash, respectively.{{Cite web |title=Канівська ГЕС: історія та перспективи |url=https://uhe.gov.ua/media_tsentr/novyny/kanivska-ges-istoriya-ta-perspektivi |access-date=2024-07-18 |website=Укргідроенерго |language=uk}}

Renovation of the Kaniv Hydroelectric Power Plant started in 1997. The first stage of renovation was financed through the IBRD, completing in June 2002. The second stage was financed by the Ukrainian government, supplemented by a US$106 million investment by the World Bank, completing in 2017.