Kendall Cogeneration Station
{{Infobox power station
| name = Kendall Cogeneration Station
| name_official =
| image = Mirant Kendall Cogeneration Station.jpg
| image_size =
| image_caption = The station in 2010
| image_alt =
| location_map =
| location_map_size =
| location_map_caption =
| location_map_zoom = 12
| location_map_alt =
| coordinates = {{Coord|42.36313|-71.08011|type:landmark_region:US-MA|display=inline,title}}
| country = United States
| location = Cambridge, Massachusetts
| status = Active
| construction_began = 1949
| commissioned =
| decommissioned =
| cost =
| owner = Vicinity Energy
| operator =
| th_fuel_primary = Natural gas
| th_fuel_secondary =
| th_fuel_tertiary =
| th_technology =
| th_cogeneration =
| th_combined_cycle =
| th_cooling_source =
| th_cooling_towers =
| ps_units_operational =
| ps_units_manu_model =
| ps_units_uc =
| ps_units_planned =
| ps_units_cancelled =
| ps_units_decommissioned=
| ps_thermal_capacity =
| ps_heating_capacity =
| ps_electrical_capacity =
| ps_electrical_cap_fac =
| ps_storage_capacity =
| ps_annual_generation =
| website =
| extra =
}}
The Kendall facility is an energy facility owned by Vicinity Energy that produces steam and electricity to the cities of Boston and Cambridge. Owned by GenOn Energy in 2012, in 2013 Veolia Energy North America purchased the plant from NRG Energy. In 2020, Antin Infrastructure Partners acquired Veolia Energy North America and renamed it Vicinity Energy.
History
The Kendall power plant was built in 1949, operating in "relative obscurity" for some time as it was only turned on when high energy levels were demanded.
In 2003, the power plant switched to natural gas from oil and became more active. In 2004, there were complaints from environmentalists that water intake and water discharge was damaging marine life.
A 2006 permit issued by federal and state environmental officials was appealed by power plant officials on the grounds of being too strict.
The plan for the GenOn Kendall Cogeneration Station to slice its hot water discharge was revealed in February 2011. It had been negotiated along with the Environmental Protection Agency New England office and state regulators. The plan called for converting hot water to steam to be sent to Boston, possibly by a pipe. The agreement ended "a six-year battle between the plant’s operators and environmentalists over its state and federal water discharge permits." Veolia Energy North America was working on the pipe, to be completed by 2016.{{cite web |url=http://archive.boston.com/news/science/articles/2011/02/02/power_plant_plan_to_cut_discharge_send_heat_to_boston/ |title=Agreement to cut power plant discharge, send steam heat to Boston |last=Daley |first=Beth |date=February 2, 2011 |website=www.boston.com |publisher=Boston Globe |access-date=March 15, 2019}} As such, waste heat from the Kendall Cogeneration Station in Cambridge would heat buildings in Boston.{{cite web |url=https://www.bizjournals.com/boston/real_estate/2011/02/boston-will-warm-to-cambridges-hot-air.html |title=Boston may warm to Cambridge energy plant's hot air |last=Alspach |first=Kyle |date=February 4, 2011 |website=www.bizjournals.com |publisher=Boston Business Journal |access-date=March 15, 2019}} The pipeline extension was completed in 2013.{{cite web |url=https://www.veolianorthamerica.com/media/press-releases/veolia-completes-final-green-steam-milestone-reconfiguration-kendall |title=Veolia Completes Final "Green Steam" Milestone with Reconfiguration of Kendall Cogeneration Station |last= |first= |date=October 23, 2016 |website=www.veolianorthamerica.com |publisher=Veolia |access-date=March 15, 2019}}
In January 2012, the station had a production capacity of 256 megawatts, and in 2010 produced roughly 717,000 metric tons of carbon dioxide. While it used natural gas primarily, it also had oil as a backup to produce both electricity and steam energy.{{cite web |url=https://www.sj-r.com/x66783924/EPA-identifies-major-sources-of-greenhouse-gases-in-Mass |title=EPA identifies major sources of greenhouse gases in Mass. |last=Riley |first=David|date=January 20, 2012 |website=www.sj-r.com |publisher=The State Journal-Register |access-date=March 15, 2019}}
In 2012, the plant was owned by GenOn Energy.{{cite web |url=https://www.capecodtimes.com/article/20120728/BIZ/207280312 |title=Canal plant owner to merge |last=Gold |first=Robert |date=July 28, 2012 |website=www.capecodtimes.com |publisher=Cape Cod Times |access-date=March 15, 2019}} In 2013 Veolia Energy North America purchased the plant from NRG Energy.{{cite web |url=https://www.wickedlocal.com/article/20131230/News/312309841 |title=Veolia Energy Buys Kendall Cogeneration Station |last=Baldassari |first=Erin |date=December 30, 2013 |website=www.wickedlocal.com |publisher=Wicked Local |access-date=March 15, 2019}} In 2020, Antin Infrastructure Partners acquired Veolia Energy North America and renamed it Vicinity Energy.{{cite news |title=Vicinity is the Largest Provider of District Energy in North America |url=https://www.vicinityenergy.us/press-releases/vicinity-energy-largest-provider-district-energy-solutions-north-america |access-date=26 January 2022 |work=Vicinity |date=27 January 2020}}
Notes
{{reflist}}
External links
- www.vicinityenergy.us
Category:Buildings and structures in Cambridge, Massachusetts
Category:Cogeneration power stations in the United States
{{Massachusetts-struct-stub}}