Kingsbridge Wind Power Project, also referred to as Kingsbridge 1 Wind facility , refers to a large wind farm owned and operated by Capital Power Corporation.{{cite web | url=http://www.sedar.com/GetFile.do?lang=EN&docClass=1&issuerNo=00028458&fileName=/csfsprod/data127/filings/01871414/00000001/i%3A%5CSEDAR%5CCapitalPowerCorporation%5CDEC2011Annuals%5CCPCFinal2011AIF.pdf|publisher=System for Electronic Document Analysis and Retrieveal (SEDAR)|accessdate=June 1, 2012|title=2011 Annual Information Form, Capital Power}} Kingsbridge 1 Wind facility is located between Goderich and Kincardine, Ontario. The Kingsbridge 1 Wind facility is located on the southeast shore of Lake Huron in the township of Ashfield-Colborne-Wawanosh and consists of 22 1.8 MW Vestas V80 wind turbines with a capacity of 39.6 MW.{{cite web |title=Kingsbridge 1 Wind Facility Information |url=https://www.capitalpower.com/generationportfolio/CA/Pages/Kingsbridge.aspx |publisher=Capital Power |accessdate=April 29, 2019}} Each tower is over 78 meters tall and weigh around 195 metric tonnes.[http://www.epcor.ca/SiteCollectionDocuments/Environment/pdfs/KingsbridgeWindPowerProject.pdf Kingsbridge Wind Power Project]{{Dead link|date=September 2018 |bot=InternetArchiveBot |fix-attempted=yes }} The project consists of two phases and currently provides power to on average 12,500 homes.{{cite web | url=http://www.epcor.ca/SiteCollectionDocuments/Environment/pdfs/KingsbridgeWindPowerProject.pdf | title=Kingsbridge Fact Sheet Two, EPCOR }}{{Dead link|date=September 2018 |bot=InternetArchiveBot |fix-attempted=yes }}
In 2004, the first phase was awarded a generation contract by the Government of Ontario as part of its renewable energy RFP. Construction has since been completed and the project is fully operational.
In 2005, the second phase received a generation contract from the provincial government.
class="wikitable" | |||||||||||||
Year | January | February | March | April | May | June | July | August | September | October | November | December | Total |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2006 | 6,004 | 7,011 | 6,077 | 4,856 | 4,717 | 4,423 | 7,036 | 11,098 | 7,947 | 15,806 | 74,975 | ||
2007 | 13,365 | 14,892 | 13,290 | 10,904 | 6,811 | 5,240 | 4,305 | 4,603 | 8,019 | 11,193 | 12,454 | 13,365 | 90,184 |
2008 | 15,782 | 10,048 | 11,084 | 10,176 | 9,656 | 5,732 | 4,726 | 4,260 | 4,652 | 10,491 | 12,555 | 16,141 | 89,473 |
2009 | 11,119 | 10,943 | 10,317 | 12,645 | 9,209 | 2,984 | 2,928 | 5,956 | 4,899 | 10,166 | 9,018 | 12,364 | 80,486 |
2010 | 11,164 | 6,572 | 7,836 | 10,246 | 6,836 | 4,645 | 3,654 | 4,897 | 9,628 | 10,361 | 12,016 | 15,274 | 85,393 |
2011 | 8,975 | 12,026 | 9,155 | 10,862 | 7,435 | 5,546 | 3,229 | 2,633 | 6,041 | 8,789 | 14,781 | 11,697 | 80,168 |
2012 | 14,274 | 10,324 | 12,111 | 9,709 | 5,330 | 6,142 | 3,330 | 36,622 |
See also
{{stack|{{Portal|Ontario|Weather|Renewable energy}}}}
References
{{reflist}}
External links
- [http://www.epcor.ca/ EPCOR], the developer.
- [http://www.capitalpower.com/ Capital Power], the owner and operator.
- [http://www.ontarioelectricityrfp.ca/RenewablesRFP/Index.aspx?id=15 Ontario Renewables RFP I]{{Dead link|date=September 2018 |bot=InternetArchiveBot |fix-attempted=yes }}.
- [http://www.ontarioelectricityrfp.ca/RenewablesRFP/Index.aspx?id=28 Ontario Renewables RFP II]{{Dead link|date=September 2018 |bot=InternetArchiveBot |fix-attempted=yes }}.
- [http://www.cns-snc.ca/OntarioElectricity "Where is my Electricity Coming From at this Hour? (if I lived in Ontario)" (Canadian Nuclear Society, with data from IESO)] {{Webarchive|url=https://archive.today/20121205025556/http://www.cns-snc.ca/OntarioElectricity |date=2012-12-05 }}
{{coord|43|46|N|81|39|W|display=title}}
{{List of Wind Farms in Ontario}}
{{wind power}}
Category:Buildings and structures in Huron County, Ontario
Category:Wind farms in Ontario
{{wind-farm-stub}}
{{Canada-powerstation-stub}}