La Esmeralda Dam
{{Infobox dam
| name = La Esmeralda Dam
| name_official = Presa La Esmeralda
| image = Embalse la esmeralda - front.jpg
| image_size =
| image_caption = The dam's reservoir
| image_alt = 52 KM of TUNJA city
| location_map = Colombia
| location_map_size = BOYACA
| location_map_caption = VALLE DE TENZA
| coordinates = {{coord|04|54|03|N|73|17|49|W|type:landmark|display=inline,title}}
| country = Colombia
| location = Santa María, Neira Province
| status = O
| construction_began = 1960
| opening = 1976
| demolished =
| cost = $395 million
| owner =
| dam_type = Embankment, rock-fill
| dam_height = {{Convert|237|m|abbr=on}}
| dam_height_thalweg =
| dam_height_foundation=
| dam_length = {{Convert|310|m|abbr=on}}
| dam_width_crest =
| dam_width_base =
| dam_volume = {{Convert|11500000|m3|abbr=on}}
| dam_elevation_crest =
| dam_crosses = Batá River
| spillway_count =
| spillway_type =
| spillway_capacity =
| res_name = La Esmeralda Reservoir
| res_capacity_total = {{Convert|758|e6m3|acre.ft|abbr=on}}
| res_capacity_active = {{Convert|680|e6m3|acre.ft|abbr=on}}
| res_capacity_inactive=
| res_catchment =
| res_surface = {{Convert|12.6|km|abbr=on}}
| res_elevation = {{Convert|1200|m|abbr=on}}
| res_max_depth = {{Convert|130|m|abbr=on}}
| res_max_length = {{Convert|22|km|abbr=on}}
| res_max_width = {{Convert|1|km|abbr=on}}
| res_tidal_range =
| plant_name = Chivor Power Station
| plant_coordinates = {{coord|4|52|51.52|N|73|13|55.32|W|type:landmark}}
| plant_operator = AES Chivor
| plant_commission = 1976–1982
| plant_decommission =
| plant_type =
| plant_turbines = 8 x {{convert|125|MW|abbr=on}} Pelton turbines{{cite web|title=Hydroelectric Developments|url=https://docs.google.com/viewer?a=v&q=cache:zsMLOxG7xk0J:www.ingetec.com.co/brochures-ingles/BROCHURE-HIDROELECTRICAS-INGLES.pdf+Upia+Dam+colombia+-wiki&hl=en&pid=bl&srcid=ADGEESjrGp8ibBWqSAzJJz8eN_RfE-TGSDD2bRoar91haoDbYYXtn_PdEYmhObfsruuw9S6EgIZX-89omaDljDMl6QAI78RegDKQRW6_Y1pLiy4K8IcmeVNzZwf69IhGb4GcKc4QbRyc&sig=AHIEtbR3VgccgT-I36KDRyyMkgRmpzzyIA|publisher=Ingetic S.A.|accessdate=28 May 2011}}
| plant_capacity = {{convert|1000|MW|abbr=on}}
| plant_annual_gen = {{convert|4,620|e6kWh|abbr=on}}
| website =
| extra =
}}
La Esmeralda Dam is an embankment dam on the Batá River northwest of Santa María in Boyacá Department, Neira Province, Valle de Tenza (Tenza Valley) Colombia, 52 km to south of Tunja city. The primary purpose of the dam is hydroelectric power production and it is part of the Chivor Hydroelectric Project. Water from the Batá is diverted by the dam to a power station that discharges to the Lengupá River. The power station supplies 8% of Colombia's power demand.{{cite web |title=Facility |url=http://www.aes.com/global/index?page=reports_overview&view=CHIVOR&cat=FACILITY&locale=en |publisher=AES Chivor |accessdate=28 May 2011 |archive-url=https://web.archive.org/web/20110726012018/http://www.aes.com/global/index?page=reports_overview&view=CHIVOR&cat=FACILITY&locale=en |archive-date=26 July 2011 |url-status=dead }}
History
Initial studies for the project began in 1954. The idea behind the dam was to divert water from the Batá to the Lengupá which lies at a much lower elevation. This idea was originally suggested by a topographer at The Electric Promotion Institute and later contemplated by an American-French delegation that was helping to develop Colombia's Electrification Plan at the time. Colombia's president at the time, Gustavo Rojas Pinilla promoted the project as well and it was dubbed "Project Gustavo". In 1958, further studies including geological and hydrological began.{{cite web|title=History|url=http://www.aes.com/global/index?page=about_us_overview&view=CHIVOR&cat=HISTORY&locale=en|publisher=AES Chivor|accessdate=28 May 2011|url-status=dead|archiveurl=https://web.archive.org/web/20110726011901/http://www.aes.com/global/index?page=about_us_overview&view=CHIVOR&cat=HISTORY&locale=en|archivedate=26 July 2011}} The hydroelectric project was designed in two 500 MW stages and it became apparent that additional funding would be needed to construct it. In November 1970, Ingetec S.A — under the supervision of Interconexión Electrica S.A — began construction on stage one after receiving a World Bank loan.{{cite web |title=Chivor Hydroelectric Project |url=http://www.aiddata.org/project/show/2426024 |publisher=AidData |accessdate=28 May 2011}} Stage one was complete in 1977 and a year prior, construction on stage two had started in June. By 1982, stage two was completed and inaugurated. Stage two required a World Bank loan as well. In 1996, operation and ownership of the dam and power plant was transferred from the public to the private sector.{{cite journal |last=Sanclemente |first=Carlos|title=The power of Chivor |journal=History Credential Review |date=August 1999 |issue=116 |url=http://www.banrepcultural.org/blaavirtual/revistas/credencial/agosto1999/116chivor.htm |accessdate=28 May 2011 |publisher=Virtual Library of the Republic Bank |language=Spanish}}{{cite web |title=The Company |url=http://www.aes.com/global/index?page=about_us_overview&view=CHIVOR&cat=THE_COMPANY&locale=en |publisher=AES Chivor |accessdate=28 May 2011 |archive-url=https://web.archive.org/web/20110726011938/http://www.aes.com/global/index?page=about_us_overview&view=CHIVOR&cat=THE_COMPANY&locale=en |archive-date=26 July 2011 |url-status=dead }}{{cite web |title=Chivor SA |url=http://ppi.worldbank.org/explore/PPIReport.aspx?ProjectID=336 |publisher=World Bank |accessdate=28 May 2011}}
Dam
La Esmeralda dam is a {{Convert|237|m|adj=on}} tall and {{Convert|310|m|adj=on}} long central core rock-fill embankment dam with a structural volume of {{Convert|11500000|m3}}.{{cite web |title=Ingetec S.A. Dams |url=https://docs.google.com/viewer?a=v&q=cache:bDDPBxNMgCgJ:www.ingetec.com.co/brochures-ingles/BROCHURE-PRESAS-INGLES.pdf+Chivor+Esmeralda+Dam&hl=en&pid=bl&srcid=ADGEEShRvhZu1XrXXDXBjVF_u8mfnS0DfplrBtbwFUUOX-O6JzG2-nrmhorQt7umAZRLCmahhNUJkMQCYdRK02Mu1pQa8LdMFVwXafrPARDpxnbaSv8n7H--Qa350GW_xtB9MynqK0jW&sig=AHIEtbSwvRgsVoxXyPl8aGJ9COwvr5dLJA |publisher=Ingetec S.A.|accessdate=28 May 2011}} The dam's reservoir has a {{Convert|758000000|m3|acre.ft}} capacity, of which {{Convert|680000000|m3|acre.ft}} is active storage. The reservoir has a surface area of {{Convert|12.6|km2|mi2|0|abbr=on}} and a maximum depth of {{Convert|130|m}}. Its maximum length is {{Convert|22|km}} at a normal elevation of {{Convert|1200|m}} above sea level and its maximum width is {{Convert|1|km}}.{{cite web|title=Use of Reservoir Aquaculture in Colombia |url=http://www.fao.org/docrep/field/003/ab488s/AB488S05.htm#ch3.2.29 |publisher=Food and Agriculture Organization |accessdate=28 May 2011 |language=Spanish}} Helping to withhold the reservoir are two auxiliary dams.
Chivor Power Station
Chivor Power Station, lies to the southeast and is fed with water from reservoir by two separate {{Convert|7.6|km|adj=on}} long tunnels (stage one and two). Near the banks of the Lengupá River, the tunnels split into eight separate penstocks to supply each {{convert|125|MW}} Pelton turbine-generator with water. Once utilised for electricity, the water is discharged into the Lengupá. The normal drop in elevation from the reservoir to the power station is {{Convert|130|m}}.
See also
{{stack|{{Portal|Colombia|Water|Renewable energy}}}}
References
{{reflist|33em}}
External links
- [https://web.archive.org/web/20110726012002/http://www.aes.com/global/index?page=home&view=CHIVOR&locale=en AES Chivor] Homepage
{{GeoGroupTemplate}}