Lekki Port
{{Short description|Deep-sea port in Lagos State, Nigeria}}
{{Infobox port
| country = Nigeria
| website = https://lekkiport.com/
| coordinates = {{coord|6.428|4.007|type:landmark_region:NG_dim:2000|display=inline,title}}
| owner = China Harbour Engineering Company and Tolaram Group.
| location = Lagos
| image = Free-Trade-Zone-Lekki-English3.jpg
| image_caption = Lagos and the deep sea port Lekki
| piers = Container terminal, terminal for liquid goods, terminal for bulk goods
| opened = {{start date and age|2022}}
| operated = Lekki Port LFTZ Enterprise Limited
| type = tidal port
| draft_depth = 16.5 m depth
| cargotonnage = 4 million tons per year
| locode = NG
| containervolume = 2.5 million teu
| name = Deep sea port Lekki
}}
File:STS crane Lekki Port2.jpg
Lekki Deep Sea Port, is a multi-purpose, deep sea port in the Lagos Free Zone and is the only currently operating deep sea port in the country, having started full commercial operations in April 2023.{{Cite web |last=Anagor-Ewuzie |first=Amaka |date=2023-10-23 |title=Lekki Port in slow start as economic hardship worsens |url=https://businessday.ng/business-economy/article/lekki-port-in-slow-start-as-economic-hardship-worsens/ |access-date=2023-12-01 |website=Businessday NG |language=en-US}}
It is the largest seaport of Nigeria and one of the biggest in West Africa. Lekki port is to be expanded to have a capacity of handling around 6 million TEUs of containers and a significant volume of liquid and dry bulk uncontainerized cargoes. The port is to be equipped with ships able to transport over 14,500 containers.{{Cite web|title=Nigeria’s $1.5bn Lekki Port to be complete “first quarter of 2023” - News - GCR|url=http://www.globalconstructionreview.com/news/nigerias-15bn-lekki-port-be-complete-first-quarter/|access-date=2021-06-26|website=www.globalconstructionreview.com}}
The port is being developed in phases. Its phase one, be operational in 2018, chiefly comprises it three container berths equipped to handle more than 1.8 million TEUs — one berth for dry bulk goods and two berths for liquid cargo.[http://www.lekkiport.com Lekki Port web site]
The port is financed by private investors and a consortium of banks who have funded the project with $1.5 billion as of March 2021. The seaport is to occupy up to 90 hectares of land.{{Cite web|date=2021-03-19|title=Lekki deep seaport begins operations in 2023 - Investor {{!}} Premium Times Nigeria|url=https://www.premiumtimesng.com/regional/ssouth-west/450074-lekki-deep-seaport-begins-operations-in-2023-investor.html|access-date=2021-06-26|language=en-GB}} The port started commercial operations in April 2023.
On October, 31st, 2022, the port has been handed over to the owners. Commissioning will start "in the next month".{{Cite web |last=Nwafor |date=2022-10-31 |title=Contractors hand over completed $1.5bn Lekki Port to owners |url=https://www.vanguardngr.com/2022/10/contractors-hand-over-1-5bn-lekki-port-to-owners-after-completion/ |access-date=2022-11-01 |website=Vanguard News |language=en-GB}}{{Citation |title=Lekki Deep Seaport Finally Completes and Handed Over; Biggest Deep Seaport in West Africa |url=https://www.youtube.com/watch?v=xgFymK25oWE |language=en |access-date=2022-11-01}} Lagos State governor Sanwo-Olu promised on this occasion to expand the roads to the port to 6 lane highways.
On 22 January 2023, a few hours before the official inauguration by President Buhari, the first commercial ship, the container freighter CMA CGM MOZART, docked at the port.
Design
The layout of the port, including the layout of the approach channel, turning circle, and harbor basins have been derived from optimizations based on port operations, construction costs, and possible future extensions.
Two different breakwater concepts were applied for the main breakwater: A rubble mound with geo-bag core for the near-shore sections and a composite breakwater for the more exposed sections. The main breakwater is 1.5 km long.{{Citation |title=Lekki Deep Sea Port - Overview Video |url=https://www.youtube.com/watch?v=GE4EU1h2-qg |language=en |access-date=2022-09-16}}
The secondary breakwater was replaced by a barrier. The barrier consists of a core from sand, internally fortified by a protective geo-bag layer, a revetment on the harbor side, and an artificial beach on the seaward side.[http://cedb.asce.org/cgi/WWWdisplay.cgi?263313 Design of Port@Lekki]
[http://climatechange.dhigroup.com/ClimateChangeActivities/~/media/Microsite_ClimateChange/Publications/Transport%20and%20energy%20production/Port%20at%20Lekki%20-%20breakwater%20tests,%20Nigeria%20(2007%20-%202008).ashx Port at Lekki - Breakwater Tests][https://www.scribd.com/doc/9596528/Port-Lekki-Master-Presentation Port at Lekki - Master Presentation]{{usurped|1=[https://web.archive.org/web/20150404003332/http://www.mylekki.com/lekki-deep-seaport-receives-1-5billion-dollars-funding/ Lekki Deep Sea Port Receives $1.5 Billion funding]}}
The turning circle is 600 meters, enough for a vessel up to 16,000 standard containers (teu). The approach channel is 11 km long.
Terminals
The port has three terminals: the container terminal, the liquid terminal and the dry bulk terminal.{{Cite web |title=Nigeria ICRC PPP Platform |url=https://ppp.icrc.gov.ng/project/118/lekki-deep-water-port |access-date=2022-05-28 |website=ppp.icrc.gov.ng}}
= Container terminal =
The container terminal has an initial draft of 14 metres, with the potential for further dredging to 16.5 metres.{{Cite web |date=2013-12-12 |title=Green light for Nigeria’s Lekki Port |url=https://www.porttechnology.org/news/green_light_for_nigerias_lekki_port/ |access-date=2022-07-02 |website=Port Technology International |language=en-GB}} The terminal is able to handle 2.5 million twenty-foot standard containers per year. The deep-sea port of Lekki is the first port in Nigeria with ship-to-shore cranes. It has three of these container gantry cranes; they belong to the "Super-post-Panamax" group - this means that they can reach and unload the rearmost row of containers even if the container ship is wider than the Panama Canal (49 m or 160 ft maximum boat beam).{{Cite web |last=Babalola |first=Yusuf |date=2022-09-12 |title=Lekki Deep Seaport: Cameroonian Shippers Begin Cargo Import Through Nigeria |url=https://leadership.ng/lekki-deep-seaport-cameroonian-shippers-begin-cargo-import-through-nigeria/ |access-date=2022-09-15 |language=en-US}}{{Cite web |last=Rapheal |date=2022-09-13 |title=Mali, Chad, Niger to transit cargoes through Lekki deep seaport |url=https://www.sunnewsonline.com/mali-chad-niger-to-transit-cargoes-through-lekki-deep-seaport/ |access-date=2022-09-15 |website=The Sun Nigeria |language=en-us}}
The STS cranes have a fixed rail at the quayside. They can lift 65 tons in twin-lift mode,{{Citation |title=Twin Lift of 2x20 containers |url=https://www.youtube.com/watch?v=vIZhYjZvCLo |language=en |access-date=2022-09-16}} 50 tons in single-lift mode or 85 tons under a hook. The outreach from the quayside is 61 meters (this corresponds to 25 container rows). - The world's biggest container ship (as of 2022), the EVER ALOT, has a width of 61,5 meters.{{Cite web |title=Schiffsdetails Für: EVER ALOT (Container Ship) - IMO 9893955, MMSI 352001259, Rufzeichen 3E4008 Registriert In Panama |url=https://www.marinetraffic.com/en/ais/details/ships/shipid:6991950/mmsi:352001259/imo:9893955/vessel:EVER_ALOT |access-date=2022-12-31 |website=MarineTraffic.com |language=de}} - The air draft (the maximum height from which containers can be picked up) is 52 meters. Each STS crane generates 300 lux of light, which means that even at night the area around the crane will be nearly as bright as daylight. Cameras will assist operators when working at difficult angles.{{Cite web |last=Rapheal |date=2022-06-02 |title=Lekki Port ready to take delivery of STS cranes, RTG equipment |url=https://www.sunnewsonline.com/lekki-port-ready-to-take-delivery-of-sts-cranes-rtg-equipment/ |access-date=2022-09-16 |website=The Sun Nigeria |language=en-us}}
The port's computerised system will allow container identification and clearance from the office, and human interaction will be minimal in the physical operations. Nevertheless, the port will create 169,972 jobs, according to executive director, Du Ruogang. The additional revenue for the Nigerian state through taxes, levies and royalties is estimated at $201 billion.{{Cite web |last=Olashile |first=Taofeek Adekunle |date=2022-09-14 |title=Lekki Deep Seaport to Commence Operations on 16th of September, 2022 |url=https://investorsking.com/2022/09/14/lekki-deep-seaport-to-commence-operations-on-16th-of-september-2022/ |access-date=2022-09-15 |website=Investors King |language=en-US}} A directive from President Buhari (who will, however, leave office at the beginning of 2023) provides for the deep-sea port to be connected to the Nigerian rail network.
= Liquid cargo terminal =
When phase 2 will be finished, the deep sea port will have 3 liquid berths. The liquid cargo terminal will handle vessels up to 45,000 DWT (dead weight tonnage) and can expand to reach a capacity of 160,000 DWT. Liquids (like petrol or diesel) will be handled at a tank farm near the port. The docking area is equipped with loading arms. It is also connected by pipelines along the breakwater.
In December 2022 the Chief Operating Officer of Lekki Port LFTZ Enterprise Limited, Laurence Smith, opened talks with potential operators of the Liquid berth terminals. This would be critical to the commencement of the construction of Phase 2 of the port.{{Cite web |date=2022-12-29 |title=Lekki Port begins talks on liquid berth terminal |url=https://punchng.com/lekki-port-begins-talks-on-liquid-berth-terminal/ |access-date=2022-12-29 |website=Punch Newspapers |language=en-US}}
= Dry bulk terminal =
The bulk terminal will be finished with phase 2 and will be situated on the west side of the container terminal. The available quay length of 300m can accommodate a Panamax class vessel{{Cite web |title=The most common types of large cargo ships, explained |url=https://www.yieldstreet.com/resources/article/types-of-cargo-ships/ |access-date=2022-05-28 |website=www.yieldstreet.com |language=en-us}} (75,000 DWT). Bulk products are brought to storage areas, such as silos and warehouses, via covered conveyor systems. The bulk terminal capacity is around 4 million tonnes of dry bulk annually.
= Rail connection =
On December 29, 2022, Lekki Port Enterprises announced, that it will fund a US$800 million railway line from the harbour to Ijebu-Ode, where it will connect to the proposed railway line Lagos - Benin-City- Calabar (Eastern railway line).{{Cite web |author=Staff Writer |last2=ZAWYA |title=Nigeria’s Lekki Port to fund $800mln rail line |url=https://www.zawya.com/en/economy/africa/nigerias-lekki-port-to-fund-800mln-rail-line-gtkvaf7f |access-date=2022-12-29 |website=www.zawya.com |language=en}}
Start of operation
On July 1, 2022, the first ship, "Zhen Hua 28" from Hongkong, docked at the deep sea port of Lekki.{{Cite web |date=2022-07-01 |title=First vessel berths at Lekki deep seaport - Premium Times Nigeria |url=https://www.premiumtimesng.com/news/more-news/540232-first-vessel-berths-at-lekki-deep-seaport.html,%20https://www.premiumtimesng.com/news/more-news/540232-first-vessel-berths-at-lekki-deep-seaport.html |access-date=2022-07-02 |language=en-GB}} The vessel brought three Super Post Panamax Ship To Shore (STS) cranes and ten Rubber Tyred Gantry cranes.{{Cite web |last=Online |first=Tribune |date=2022-07-01 |title=First ship berths at $1.5bn Lekki Deep Seaport, discharges 13 cranes |url=https://tribuneonlineng.com/first-ship-berths-at-1-5bn-lekki-deep-seaport-discharges-13-cranes/ |access-date=2022-07-02 |website=Tribune Online |language=en-GB}}{{Cite web |date=2022-08-03 |title=Nigeria’s $1.6 billion Lekki Port nears completion |url=https://www.porttechnology.org/news/nigerias-1-6-billion-lekki-port-nears-completion/ |access-date=2022-08-09 |website=Port Technology International |language=en-GB}}
Early August 2022, a second ship, "Zhen Hua 35" from Shanghai, brought the second shipment, two STS cranes including 115 packages of accessories, and 5 Rubber-Tyre-Gantry cranes including 270 packages of accessories.{{Cite web |last=Ade |date=2022-08-08 |title=Lekki Deep Sea Port Hosts Second Vessel Ahead Of September Take-Off |url=https://shippingposition.com.ng/lekki-deep-sea-port-hosts-second-vessel-ahead-of-september-take-off/ |access-date=2022-08-09 |website=shippingposition |language=en-US}}
The port management announced in August 2022, that the port will be opened by the next month.{{Cite web |last=Ade |date=2022-08-08 |title=Lekki Deep Sea Port Hosts Second Vessel Ahead Of September Take-Off |url=https://shippingposition.com.ng/lekki-deep-sea-port-hosts-second-vessel-ahead-of-september-take-off/ |access-date=2022-08-09 |website=shippingposition |language=en-US}}
According to managing director of the Nigerian Ports Authority (NPA), Mohammed Bello-Koko, tests and dry runs will be underway at the deepwater port from 16 September 2022. Recruitment has already been carried out. The necessary training with the cranes, the computer system and the clearance system is taking place, but still needs some time.
Other West African countries, such as Chad, Mali, Niger and Cameroon, have already shown interest in handling their imports and exports through the deep sea port of Lekki.
The port started commercial operations in April 2023, though the slowdown in the Nigerian economy negatively affected initial volume of import and export containers.
References
{{reflist}}
{{DEFAULTSORT:LAGOS}}
Category:Transport infrastructure under construction in Nigeria