Line 1 (Shaoxing Metro)
{{Short description|Metro line in Shaoxing, China}}
{{Infobox rail line
| name =
| logo = {{huge|{{RouteBox|1|Line 1 (Shaoxing Metro)|#{{rcr|ShaoxingM|1}}}}}}
| logo_width =
| color = {{rcr|ShaoxingM|1}}
| image = 20220713 绍兴地铁1号线 京车列车进临杭大道站.jpg
| image_width = 300px
| image_alt =
| caption = Line 1 train
| type = Rapid transit
| system = Shaoxing Metro
| status = Operational
| locale = Shaoxing, Zhejiang Province, China
| start = {{stl|ShaoxingM|Guniangqiao}}
| end = {{stl|ShaoxingM|Fangquan}}
{{stl|ShaoxingM|Daqingsi}}
| stations = 28 (main line)
3 (branch, 5 in 2025)
| routes =
| daily_ridership =
| planopen =
| open = {{Start date and age|2021|06|28|df=yes}}
| close =
| owner =
| operator = Shaoxing Metro Corporation
| character = Underground and elevated
| depot =
| stock = PM139
ZBM02
| linelength = 47.1 km (Main line, in operation)
7.3 km (Branch, 4.08 km opening in 2024)
| tracklength =
| tracks =
| gauge =
| electrification =
| speed = 80km/h
| elevation =
| website =
| map =
| map_state =
}}
Line 1 of Shaoxing Metro ({{zh|s=绍兴轨道交通1号线|p=Shàoxīng Guǐdào Jiāotōng Yīhào Xiàn}}) is a metro line in Shaoxing, Zhejiang Province, China.
Section
;Main line (Keqiao section)
The section from Guniangqiao to China Textile City opened on 28 June 2021. The section is {{Cvt|20.3|km}} in length with 10 stations.{{Cite news |date=2021-06-28 |script-title=zh:绍兴正式进入“地铁时代” 两地“一张网”运营创全国先例 |language=zh |url=http://www.zj.xinhuanet.com/2021-06/28/c_1127606289.htm |url-status=dead |access-date=2021-06-28 |archive-url=https://web.archive.org/web/20210628222940/http://www.zj.xinhuanet.com/2021-06/28/c_1127606289.htm |archive-date=2021-06-28 |script-work=zh:新华网}}
Elevated section from Yangxunqiao to Linhang Avenues.
Average speed through the trip: 38.3km/h
;Main line (remaining section)
The section from China Textile City to Fangquan is {{convert|26.8|km|abbr=on|}}{{Cite news |date=2018-10-11 |script-title=zh:绍兴地铁1号线初步设计获批复!24个站分别位于这里 |language=zh |url=http://zjnews.zjol.com.cn/zjnews/sxnews/201810/t20181011_8455316.shtml |url-status=live |access-date=2019-11-04 |archive-url=https://web.archive.org/web/20191104045803/http://zjnews.zjol.com.cn/zjnews/sxnews/201810/t20181011_8455316.shtml |archive-date=2019-11-04 |script-work=zh:浙江新闻}} long and runs between China Textile City station in Keqiao District and Fangquan station in Yuecheng District, passing through the city center of Shaoxing with 18 stations.{{Cite web |date=2021-06-04 |script-title=zh:地铁将开通,票价如何定? |url=http://www.shaoxing.com.cn/yuanchuang/p/2870999.html |url-status=live |archive-url=https://web.archive.org/web/20211104202518/http://www.shaoxing.com.cn/yuanchuang/p/2870999.html |archive-date=2021-11-04 |access-date=2021-06-15 |language=zh |script-website=zh:绍兴网}} The section opened on 29 April 2022.
;Branch line (future Line 4)
The branch line will branch off at Huangjiu Town and head north for {{Cvt|7.3|km}} to Exhibition and Convention Center with 6 stations (5 new stations, Huangjiu Town station is already opened with the main line of Line 1). The initial section opened on 1 April 2024 and the remaining section will open in 2025. The branch line will be part of Line 4 in the future.{{cite web|url=http://www.rail-transit.com/shiping/show.php?itemid=1539|title=
绍兴市城市轨道交通第二期建设规划环评公众意见征询|quote=4号线一期:将现有1号线支线拆分为4号线,并在此基础上向南延伸|date=2022-01-05|archive-date=2022-05-02|archive-url=https://web.archive.org/web/20220502094408/http://www.rail-transit.com/shiping/show.php?itemid=1539}}
Opening timeline
class="wikitable" style="border-collapse: collapse; text-align: right;"
!Segment!!Commencement!!Length!!Station(s)!!Name |
style="text-align: left;"| Guniangqiao — China Textile City
|{{Convert|20.3|km|mi|abbr=on}} | 10 |style="text-align: left;"| Main line (Keqiao section) |
style="text-align: left;"| China Textile City — Fangquan
| 29 April 2022 | {{Convert|26.8|km|mi|abbr=on}} | 18 |style="text-align: left;"| Main line (remaining section) |
style="text-align: left;"| Huangjiu Town — Daqingsi
| 1 April 2024{{cite web|url=https://mp.weixin.qq.com/s/pg6Ya4FONwl0Js5E0cPD-w|title=绍兴地铁1号线支线(黄酒小镇站-大庆寺站)将于4月1日开通,出行信息这都有!}} | {{Convert|4.08|km|mi|1|abbr=on}}{{cite web|url=https://mp.weixin.qq.com/s/l41ZqEMjTEDtdgug4xfbhw|title=绍兴地铁,心心念念的好消息来了!|author=绍兴发布}} | 3 |style="text-align: left;"| Branch line (initial section) |
bgcolor="lightgrey"
|style="text-align: left;"| Daqingsi — Exhibition And Convention Center | {{Convert|3.22|km|mi|1|abbr=on}} | 2 |style="text-align: left;"| Branch line (remaining section) |
Stations
=Main line=
class="wikitable"
! rowspan="2" | Connections ! colspan="2" rowspan="2" | Distance ! rowspan="2" |Location | |
{{small|English}}{{cite web|url=https://wx3.sinaimg.cn/large/70c5f75fgy1gyse9fopzoj21jk28sx6p.jpg|title=Shaoxing Metro Line 1|archive-url=https://web.archive.org/web/20220208232452/https://wx3.sinaimg.cn/large/70c5f75fgy1gyse9fopzoj21jk28sx6p.jpg|archive-date=2022-02-08}}
! {{small|Chinese}} | |
---|---|
style = "background:#{{rcr|ShaoxingM|1}}; height: 2pt"
| colspan="6" | | |
{{stl|ShaoxingM|Guniangqiao}}
|{{large|{{lang|zh-cn|姑娘桥}}}} |{{rint|hangzhou|5}} (Hangzhou Metro) | | | |
{{stl|ShaoxingM|Yaqian}}
|{{large|{{lang|zh-cn|衙前}}}} | | | | |
{{stl|ShaoxingM|Yangxunqiao}}
|{{large|{{lang|zh-cn|杨汛桥}}}} | | | | |
{{stl|ShaoxingM|Qianmei}}
|{{large|{{lang|zh-cn|前梅}}}} | | | | |
{{stl|ShaoxingM|Qianqing}}
|{{large|{{lang|zh-cn|钱清}}}} |{{RouteBox|Shaoxing Urban|Shaoxing Urban Rail Line|#{{rcr|CR|passenger}}}} | | | |
{{stl|ShaoxingM|Xisha Road}}
|{{large|{{lang|zh-cn|西沙路}}}} | | | | |
{{stl|ShaoxingM|Linhang Avenue}}
|{{large|{{lang|zh-cn|临杭大道}}}} | | | | |
{{stl|ShaoxingM|Jianshui Road}}
|{{large|{{lang|zh-cn|鉴水路}}}} | | | | |
{{stl|ShaoxingM|Yuezhou Avenue}}
|{{large|{{lang|zh-cn|越州大道}}}} | | | | |
{{stl|ShaoxingM|China Textile City}}
|{{large|{{lang|zh-cn|中国轻纺城}}}} | | | | |
{{stl|ShaoxingM|Mingzhu Square}}
|{{large|{{lang|zh-cn|明珠广场}}}} | | | | |
{{stl|ShaoxingM|Guazhuhu}}
|{{large|{{lang|zh-cn|瓜渚湖}}}} | | | | |
{{stl|ShaoxingM|Jingshui Road}}
|{{large|{{lang|zh-cn|镜水路}}}} | | | | rowspan="16" |Yuecheng, Shaoxing | |
{{stl|ShaoxingM|Huangjiu Town}}
|{{large|{{lang|zh-cn|黄酒小镇}}}} | {{rint|shaoxing|1}} (branch)
| | |
bgcolor="lightgrey"
|{{stl|ShaoxingM|Zhangshu}}{{efn|Zhangshu station is under construction.}} |{{large|{{lang|zh-cn|张墅}}}} | | | | |
Olympic Sports Center
|{{large|{{lang|zh-cn|奥体中心}}}} | | | | |
{{stl|ShaoxingM|Meishan Square}}
|{{large|{{lang|zh-cn|梅山广场}}}} |{{rint|shaoxing|2}} | | | |
{{stl|ShaoxingM|Fenglin}}
|{{large|{{lang|zh-cn|凤林}}}} | | | | |
{{stl|ShaoxingM|Datan}}
|{{large|{{lang|zh-cn|大滩}}}} | | | | |
Railway Station
|{{large|{{lang|zh-cn|火车站}}}} |{{RouteBox|Shaoxing Urban|Shaoxing Urban Rail Line|#{{rcr|CR|passenger}}}} | | | |
City Square
|{{large|{{lang|zh-cn|城市广场}}}} | | | | |
{{stl|ShaoxingM|Lu Xun Native Place}}
|{{large|{{lang|zh-cn|鲁迅故里}}}} | | | | |
{{stl|ShaoxingM|Chengnan Avenue}}
|{{large|{{lang|zh-cn|城南大道}}}} | | | | |
{{stl|ShaoxingM|Fenghuangshan}}
|{{large|{{lang|zh-cn|凤凰山}}}} | | | | |
{{stl|ShaoxingM|Laojiafeng}}
|{{large|{{lang|zh-cn|劳家葑}}}} | | | | |
{{stl|ShaoxingM|Nanchi}}
|{{large|{{lang|zh-cn|南池}}}} | | | | |
{{stl|ShaoxingM|Qihu}}
|{{large|{{lang|zh-cn|栖湖}}}} | | | | |
{{stl|ShaoxingM|Fangquan}}
|{{large|{{lang|zh-cn|芳泉}}}} | | | | |
style = "background:#{{rcr|ShaoxingM|1}}; height: 2pt"
| colspan="6" | |
{{notelist}}
=Branch line=
Rolling stock
class="wikitable sortable" style="font-size: 95%;" | |
Stock
! Class ! Year built ! Builder ! Number built ! Numbers ! Formation ! Depots ! Line assigned ! Notes |
---|
bo,
| PM139 | rowspan="2" | B | 2020-2021 | CRRC Nanjing Puzhen | 108 (18 sets) | 01 001 - 01 019 (010011-010196) | rowspan="2" | Tc+Mp+M+M+Mp+Tc | rowspan="2" | Wanxiu Road Depot | rowspan="2" | {{rint|shaoxing|1}} | |
ZBM02
| 2020-2022 | Beijing Subway Rolling Stock Equipment | 162 (27 sets) | 01 020 - 01 046 (010201-010466) | |
References
{{reflist|2}}
{{Northern Zhejiang transit}}
{{DEFAULTSORT:Shaoxing Metro, Line 1}}
Category:Railway lines opened in 2021