Line 2 (Changchun Rail Transit)
{{Short description|Metro line in Changchun, China}}
{{Infobox rail line
| name =
| logo = CRRT_line2_logo.svg
| logo_width = 100px
| color = {{rcr|ChangchunRT|2}}
| image = 0203 leaving Jiefang Ave. (20220824213551).jpg
| image_width = 300px
| image_alt =
| caption = Line 2 train departing from Jiefang Ave. Station
| type = Rapid transit
| system = Changchun Rail Transit
| status = Operational
| locale = Changchun, Jilin, China
| start = {{stl|ChangchunRT|Auto Park}}
| end = {{stl|ChangchunRT|Dongfang Square}}
| stations = 21
| routes = 1
| daily_ridership =
| open = {{Start date and age|2018|08|30|df=yes}}
| close =
| owner = Changchun
| operator = Changchun Rail Transit Corporation
| character = Underground
| depot =
| stock =
| linelength = {{convert|24.9|km|mi|2|abbr=on}}
| tracklength =
| tracks = 2
| gauge = {{RailGauge|sg}}
| electrification =
| speed =
| elevation =
| website =
| map =
| map_state = collapsed
}}
Line 2 of the Changchun Rail Transit ({{zh|s=长春轨道交通2号线|p=Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn}}) is a rapid transit line running from west to east Changchun.
History
=Phase 1=
Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.{{Cite news |date=2018-08-30 |script-title=zh:长春地铁进入换乘时代 2号线8月30日通车 |language=zh |url=http://m.xinhuanet.com/jl/2018-08/30/c_1123352712.htm |url-status=live |access-date=2019-10-07 |archive-url=https://web.archive.org/web/20191007055559/http://m.xinhuanet.com/jl/2018-08/30/c_1123352712.htm |archive-date=2019-10-07 |script-work=zh:新华网吉林}}
=Western extension=
Opening timeline
Service routes
- {{stl|ChangchunRT|Qiche Gongyuan}} — {{stl|ChangchunRT|Dongfang Square}}
Stations
class="wikitable"
! colspan="2" | Station name ! rowspan="2" | Connections ! colspan="2" rowspan="2" | Distance ! rowspan="2" | Location |
{{small|English}}
! {{small|Chinese}} |
---|
style = "background:#{{rcr|ChangchunRT|2}}; height: 2pt"
| colspan = "8" | |
{{stl|ChangchunRT|Auto Park}}
|{{large|{{lang|zh-cn|汽车公园}}}} | | | |rowspan="10"|Luyuan |
{{stl|ChangchunRT|Jieda Avenue}}
|{{large|{{lang|zh-cn|捷达大路}}}} | | | |
{{stl|ChangchunRT|West Lake}}
|{{large|{{lang|zh-cn|西湖}}}} | | | |
{{stl|ChangchunRT|Shuangfeng}}
|{{large|{{lang|zh-cn|双丰}}}} |{{rint|changchun|6}} |2.18 |2.18 |
{{stl|ChangchunRT|Changchun West}}
|{{large|{{lang|zh-cn|长春西站}}}} |{{rint|changchun|6}} |1.52 |3.70 |
{{stl|ChangchunRT|Xinglongpu}}
|{{large|{{lang|zh-cn|兴隆堡}}}} | |2.09 |5.79 |
{{stl|ChangchunRT|West Ring Road}}
|{{large|{{lang|zh-cn|西环城路}}}} | |1.41 |7.20 |
{{stl|ChangchunRT|Heping Street}}
|{{large|{{lang|zh-cn|和平大街}}}} | |1.14 |8.34 |
{{stl|ChangchunRT|Wanfu Street}}
|{{large|{{lang|zh-cn|万福街}}}} |{{rint|tram|1|link=Trams in Changchun}} Tram 54 |0.82 |9.16 |
{{stl|ChangchunRT|Jingyang Square}}
|{{large|{{lang|zh-cn|景阳广场}}}} | |0.86 |10.02 |
{{stl|ChangchunRT|Jiefang Overpass}}
|{{large|{{lang|zh-cn|解放桥}}}} |{{rint|changchun|3}} |1.07 |11.09 |
{{stl|ChangchunRT|Jianshe Square}}
|{{large|{{lang|zh-cn|建设广场}}}} | |0.80 |11.89 |rowspan="2"|Chaoyang |
{{stl|ChangchunRT|Wenhua Square}}
|{{large|{{lang|zh-cn|文化广场}}}} | |0.75 |12.64 |
{{stl|ChangchunRT|Jiefang Avenue}}
|{{large|{{lang|zh-cn|解放大路}}}} |{{rint|changchun|1}} |1.36 |14.00 |
{{stl|ChangchunRT|Pingyang Street}}
|{{large|{{lang|zh-cn|平阳街}}}} | |0.78 |14.78 |rowspan="2"|Nanguan |
{{stl|ChangchunRT|Nanguan}}
|{{large|{{lang|zh-cn|南关}}}} | |1.12 |15.90 |
{{stl|ChangchunRT|Jilin Avenue}}
|{{large|{{lang|zh-cn|吉林大路}}}} |{{rint|changchun|4}} |1.31 |17.21 |rowspan="3"|Erdao |
{{stl|ChangchunRT|Dongsheng Street}}
|{{large|{{lang|zh-cn|东盛大街}}}} | |0.99 |18.20 |
{{stl|ChangchunRT|East Ring Road}}
|{{large|{{lang|zh-cn|东环城路}}}} | |1.46 |19.66 |
{{stl|ChangchunRT|Changqing}}
|{{large|{{lang|zh-cn|长青}}}} | |1.27 |20.93 |
{{stl|ChangchunRT|Dongfang Square}}
|{{large|{{lang|zh-cn|东方广场}}}} | |1.38 |22.31 |
style = "background:#{{rcr|ChangchunRT|2}}; height: 2pt"
| colspan = "8" | |
{{notelist}}
Future Development
;Eastern extension
An eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length.{{Cite web |date=2019-11-27 |script-title=zh:长春地铁2号线东延工程项目正式开工 |url=http://www.sohu.com/a/356714178_120118599/ |url-status=live |archive-url=https://web.archive.org/web/20210204073848/https://www.sohu.com/a/356714178_120118599/ |archive-date=2021-02-04 |access-date=2019-11-27 |language=zh |script-website=zh:搜狐 |website=Sohu }} It's scheduled to open in 2025.
References
{{Reflist}}
{{Jilin transit}}
Category:Changchun Rail Transit lines