Line 2 (Taiyuan Metro)

{{Short description|Metro line in Taiyuan, Shanxi, China}}

{{Infobox rail line

| name =

| logo =

| logo_width = 100px

| color = {{rcr|Taiyuan Metro|2}}

| image = XIQIAO Station Platform.jpg

| image_width =

| image_alt =

| caption = Xiqiao station

| type = Rapid transit

| system = Taiyuan Metro

| status = In operation

| locale = Taiyuan, Shanxi Province, China

| start = {{stl|Taiyuan Metro|Jiancaoping}}

| end = {{stl|Taiyuan Metro|Xiqiao}}

| stations = 24

| routes = 1

| daily_ridership = 211,000 (2020 Peak){{Cite web |author=新华网|url=http://www.sx.xinhuanet.com/2020-12/30/c_1126924364.htm|archive-url=https://web.archive.org/web/20210121032834/http://www.sx.xinhuanet.com/2020-12/30/c_1126924364.htm|url-status=dead|archive-date=January 21, 2021|title=太原地铁开通三天 客运量已超51万人次|website=新华山西 |language = zh }}

| yearcommenced = 2016

| open = {{Start date and age|2020|12|26|df=yes}}

| close =

| owner =

| operator =

| character = Underground

| depot =

| stock =

| linelength_km = 23.647

| tracklength =

| tracks = 2

| gauge = {{track gauge|sg}}

| electrification =

| speed =

| elevation =

| website =

| map =

| map_state = collapsed

}}

File:太原地铁2号线列车在中国国际展览中心老馆展出(2020年10月).jpg

The Line 2 of Taiyuan Metro is the first line in Taiyuan, as well as the first line in Shanxi. The line opened on December 26, 2020.{{Cite web|title=First phase of Taiyuan Subway Line 2 put into operation - Xinhua {{!}} English.news.cn|url=http://www.xinhuanet.com/english/2020-12/26/c_139620625_3.htm|access-date=2020-12-27|website=www.xinhuanet.com}}

Opening timeline

class="wikitable" style="border-collapse: collapse; text-align: right;"

!Segment!!Commencement!!Length!!Station(s)!!Name

style="text-align: left"| Jiancaoping — Xiqiao

| 26 December 2020

| {{convert|23.647|km|mi|2|abbr=on}}

| 23

|style="text-align: left"| Phase 1

style="text-align: left;" |Huazhangxijie

|25 May 2025{{cite web |date=2025-05-23 |title=2号线化章西街站5月25日开站 |url=http://www.tynews.com.cn/system/2025/05/23/030889465.shtml |accessdate=2025-05-23 |website=太原新闻网}}

|N/A

|1

| style="text-align: left;" |Infill station

Stations

Phase 1 of Line 2 runs from {{stl|Taiyuan Metro|Jiancaoping}} in the north to {{stl|Taiyuan Metro|Xiqiao}} in the south and has 23 stations.{{Cite web|last=|first=|date=|title=23座站点名等公示|url=http://www.sx.xinhuanet.com/2020-07/05/c_1126197446.htm|url-status=live|archive-url=https://web.archive.org/web/20200706005755/http://www.sx.xinhuanet.com/2020-07/05/c_1126197446.htm|archive-date=July 6, 2020|access-date=|website=|quote=全长23.647公里,设车站23座}} Huazhangxijie station is not opened.

class="wikitable"
colspan="2" |Station Name

! rowspan="2" |Transfer

! colspan="2" rowspan="2" |Distance
km

! rowspan="2" |District

{{small|English}}

!{{small|Chinese}}

style="background:#{{rcr|Taiyuan Metro|2}}; height: 2pt"

| colspan="6" |

{{stl|Taiyuan Metro|Jiancaoping}}

|{{large|{{lang|zh-cn|尖草坪站}}}}

|

|

|

| rowspan="2" |Jiancaoping

{{stl|Taiyuan Metro|Jianhe}}

|{{large|{{lang|zh-cn|涧河站}}}}

|

|

|

{{stl|Taiyuan Metro|Shenglijie}}

|{{large|{{lang|zh-cn|胜利街站}}}}

|

|

|

| rowspan="4" |Xinghualing

{{stl|Taiyuan Metro|Dabeimen}}

|{{large|{{lang|zh-cn|大北门站}}}}

|

|

|

{{stl|Taiyuan Metro|Jihuying}}

|{{large|{{lang|zh-cn|缉虎营站}}}}

|

|

|

{{stl|Taiyuan Metro|Fuxijie}}

|{{large|{{lang|zh-cn|府西街站}}}}

|

|

|

{{stl|Taiyuan Metro|Kaihuasijie}}

|{{large|{{lang|zh-cn|开化寺街站}}}}

|

|

|

| rowspan="4" |Yingze

{{stl|Taiyuan Metro|Da'nanmen}}

|{{large|{{lang|zh-cn|大南门站}}}}

|{{RouteBox|1|Line 1 (Taiyuan Metro)|#{{rcr|Taiyuan Metro|1}}}}

|

|

{{stl|Taiyuan Metro|Tiyuguan}}

|{{large|{{lang|zh-cn|体育馆站}}}}

|

|

|

{{stl|Taiyuan Metro|Nanneihuan}}

|{{large|{{lang|zh-cn|南内环站}}}}

|

|

|

{{stl|Taiyuan Metro|Wangcunnanjie}}

|{{large|{{lang|zh-cn|王村南街站}}}}

|

|

|

| rowspan="13" |Xiaodian

{{stl|Taiyuan Metro|Changfengjie}}

|{{large|{{lang|zh-cn|长风街站}}}}

|

|

|

{{stl|Taiyuan Metro|Xuefujie}}

|{{large|{{lang|zh-cn|学府街站}}}}

|

|

|

{{stl|Taiyuan Metro|Nanzhonghuan}}

|{{large|{{lang|zh-cn|南中环站}}}}

|

|

|

{{stl|Taiyuan Metro|Jinyangjie}}

|{{large|{{lang|zh-cn|晋阳街站}}}}

|

|

|

{{stl|Taiyuan Metro|Longxingjie}}

|{{large|{{lang|zh-cn|龙兴街站}}}}

|

|

|

{{stl|Taiyuan Metro|Longchenggongyuan}}

|{{large|{{lang|zh-cn|龙城公园站}}}}

|

|

|

{{stl|Taiyuan Metro|Jiajie}}

|{{large|{{lang|zh-cn|嘉节站}}}}

|

|

|

{{stl|Taiyuan Metro|Dianzixijie}}

|{{large|{{lang|zh-cn|电子西街站}}}}

|

|

|

{{stl|Taiyuan Metro|Kangningjie}}

|{{large|{{lang|zh-cn|康宁街站}}}}

|

|

|

{{stl|Taiyuan Metro|Tongdajie}}

|{{large|{{lang|zh-cn|通达街站}}}}

|

|

|

{{stl|Taiyuan Metro|Huazhangxijie}}

|{{large|{{lang|zh-cn|化章西街站}}}}

|

|

|

{{stl|Taiyuan Metro|Xiqiao}}

|{{large|{{lang|zh-cn|西桥站}}}}

|

|

|

style="background:#{{rcr|Taiyuan Metro|2}}; height: 2pt"

| colspan="6" |

Construction

Line 2 began construction in March 2016, as of July 2020, construction of all 23 stations are complete.{{Cite web|last=|first=|date=|title=Taiyuan Gov.|url=http://www.taiyuan.gov.cn/doc/2020/07/03/990443.shtml|access-date=|website=}}

In phase 1, it has a total length of 23.647 km, 23 stations, 2 electrical stations and 1 control centre.

= Security =

There will be 3,500 cameras installed during Phase 1 alone, Dananmen Station (大南门站), a major interchange station, has 231 cameras installed.{{Cite web|last=|first=|date=|title=地铁2号线将安装各类摄像头3500个|url=http://fgw.taiyuan.gov.cn/doc/2020/07/29/996714.shtml|access-date=|website=}} All trains are unmanned and equipped with state-of-the-art technology.{{Cite web|last=|first=|date=|title=全自动无人驾驶列车运抵太原地铁2号线|url=http://www.sx.xinhuanet.com/2020-05/07/c_1125950045.htm|url-status=live|archive-url=https://web.archive.org/web/20200507181521/http://www.sx.xinhuanet.com/2020-05/07/c_1125950045.htm|archive-date=May 7, 2020|access-date=|website=}}

References