Line 6 (Kunming Metro)
{{Short description|Metro line in Kunming, China}}
{{Infobox rail line
| name =Line 6
| logo =51px
| logo_width =
| color = {{rcr|Kunming Metro|6}}
| image = 0610 entering Dabanqiao (20210322125718).jpg
| image_width = 300px
| image_alt =
| caption = Line 6 train entering Dabanqiao station
| type = Rapid transit
| system = Kunming Metro
| status = Operational
| locale = Kunming, Yunnan Province, China
| start = {{stl|Kunming Metro|Tangzixiang}}
| end = {{stl|Kunming Metro|Kunming Airport}}
| stations = 8
| routes =
| daily_ridership =
| open = {{Start date and age|2012|6|28|df=yes}}
| close =
| owner =
| operator = Kunming Rail Transit Corp., Ltd
| character =
| depot =
| stock = CSR Zhuzhou Type B (6B)
| linelength = {{convert|25.3|km|mi|1|abbr=on}}
| tracklength =
| tracks = 2
| gauge = {{RailGauge|sg}}
| electrification =
| speed =
| elevation =
| website =
| map =
| map_state = collapsed
}}
The Line 6 of the Kunming Metro ({{zh|s=昆明轨道交通6号线|p=Kūnmíng Guǐdào Jiāotōng Liù Hào Xiàn}}) also known as Airport line ({{zh|s=机场线|p=Jīchǎng Xiàn}}) is a rapid transit line that connects the Kunming Changshui International Airport with Kunming's urban center. The line is currently {{convert|25.3|km|mi}} in length with 8 stations.
The line entered into operation on 28 June 2012, and ceased operation temporarily beginning May 2016 in order to coordinate work related to the opening of Line 3 scheduled for early 2017. Finally it reopened in August 2017 along with Line 3.
On subway maps, the line's color is {{Color box|#{{rcr|Kunming Metro|6}}|border=darkgray}} teal.
Opening timeline
class="wikitable" style="border-collapse: collapse; text-align: right;"
!Segment!!Commencement!!Length!!Station(s)!!Name |
style="text-align: left;"| East Coach Station — Kunming Airport
| 28 June 2012 | {{convert|18.018|km|mi|3|abbr=on}}{{cite web|url=http://finance.people.com.cn/n/2014/0430/c153179-24963247.html|date=2014-04-30|title=铁四院设计的昆明地铁首期工程全线贯通运营|quote=加上已于2012年6月28日开通运营的地铁6号线一期18.018公里}} | 2 |style="text-align: left;"| Phase 1 |
style="text-align: left;"| East Coach Station — Kunming Airport
| 5 March 2016 | Temporary ceased operation | -2 |rowspan="2" style="text-align: left;"| Line 3 & 6 connector project |
style="text-align: left;"| East Coach Station — Kunming Airport
| rowspan="2"|29 August 2017 | Reentered operation | 2 |
style="text-align: left;"| Dabanqiao, Airport Front
| Infill stations | 2 |style="text-align: left;"| |
style="text-align: left;"| Tangzixiang — East Coach Station
| 23 September 2020{{cite web|url=http://jtys.km.gov.cn/c/2020-09-22/3667877.shtml|date=2020-09-22|title=昆明轨道交通4号线、6号线二期 开通初期运营公告}} | {{convert|7.3|km|mi|1|abbr=on}} | 4 |style="text-align: left;"| Phase 2 |
Fare
One-way fare costs CN¥5.
Hours of Operation
Currently the hours of operation for Line 6, from 6:00 AM to 22:00 PM daily. Frequency averages 15 minutes.
Line 6 trains travels at speeds of up to {{convert|100|km/h|mph}}. On the initial operation one-way trip will take approximately 20 minutes.{{cite web|title=Traffic guide to Kunming's new Airport|url=http://en.kunming.cn/index/content/2012-05/08/content_2943248.htm|work=InKunming|publisher=InKunming|accessdate=18 July 2012}}
Route
Line 6 runs in Panlong District and Guandu District.
File:Route diagram on KMM L6 train (20180213191257).jpg
class="wikitable"
! colspan="2" | station name ! rowspan="2" | Connections ! colspan="2" rowspan="2" | Distance ! rowspan="2" | Location |
{{small|English}}
! {{small|Chinese}} |
---|
style = "background:#{{rcr|Kunming Metro|6}}; height: 2pt"
| colspan = "7" | |
{{stl|Kunming Metro|Tangzixiang}}
|{{large|{{lang|zh-cn|塘子巷}}}} |{{rint|kunming|2}} |0.00 |0.00 |
{{stl|Kunming Metro|Chajie}}
|{{large|{{lang|zh-cn|岔街}}}} | | | |
{{stl|Kunming Metro|Dongjiao Road}}
|{{large|{{lang|zh-cn|东郊路}}}} | | | |rowspan="2"|Guandu |
{{stl|Kunming Metro|Juhua}}
|{{large|{{lang|zh-cn|菊华}}}} |{{rint|kunming|4}} | | |
{{stl|Kunming Metro|East Coach Station}}
|{{large|{{lang|zh-cn|东部汽车站}}}} |{{rint|kunming|3}} |0.00 |0.00 |
{{stl|Kunming Metro|Dabanqiao}}
|{{large|{{lang|zh-cn|大板桥}}}} | |9.73 |9.73 |rowspan="3"|Guandu |
{{stl|Kunming Metro|Airport Front}}
|{{large|{{lang|zh-cn|机场前}}}} | |5.36 |15.09 |
{{stl|Kunming Metro|Kunming Airport}}
|{{large|{{lang|zh-cn|机场中心}}}} |{{rint|air|link=Kunming Changshui International Airport}} KMG |2.09 |17.18 |
style = "background:#{{rcr|Kunming Metro|6}}; height: 2pt"
| colspan = "7" | |
History
Construction of Line 6 began on 1 August 2010. Track-laying was completed around December 2011. Line 6 opened to public operation on 28 June 2012 with two initial stations (East Coach Station and Kunming Airport), on the opening day of Kunming Changshui International Airport to serve the passengers from the new airport to downtown Kunming.
Gallery
File:East Bus Station Outside.jpg|East Coach Station
File:Dabanqiao Station Under Construction.jpg|Dabanqiao
File:Front Changshui Airport Station Kunming Metro Under Construction.jpg|Airport Front
File:Airport Center Station Kunming Metro.JPG|Kunming Airport
References
{{Reflist}}
{{Yunnan transit}}
{{DEFAULTSORT:Kunming Rail Transit, Line 06}}