Line 7 (Suzhou Metro)
{{Short description|Metro line in Jiangsu, China}}
{{Infobox rail line
| name =
| logo = SZRT_Line_7_icon.svg
| logo_width = 100px
| color = {{rcr|SZRT|7}}
| image = Construction Site of Line 7, Tongyuanlu South Station.jpg
| image_width = 265px
| image_alt =
| caption = Line 7 Under Construction at Tongyuanlu South station
| type = Rapid transit
| system = Suzhou Metro
| status = In operation
(Moyang to Changlou is postponed, Chunqiulu to Moyang is under construction)
| locale =
| start = Changlou
| end = Muli
| stations = 29
| routes =
| open =
| close =
| owner = Suzhou Rail Transit Co., Ltd
| operator = Suzhou Rail Transit Co., Ltd
| character =
| depot =
| stock =
| linelength = 35.2 km
| tracklength =
| gauge = {{RailGauge|1435mm}}
| speed =
| elevation =
| website =
| map =
| map_state = collapsed
}}
Line 7 of the Suzhou Metro is north-south rapid transit line in Suzhou. Construction started on December 25, 2019. Changlou - Hongzhuang section started operation on December 1, 2024, but the operation of Moyang - Changlou section is postponed due to the construction of Suzhou North railway station.
The section between Hongzhuang and Muli stations was previously operated as branch line of Line 4.{{cite web|url=http://www.sz-mtr.com/xlghindex.jsp |title=苏州轨道交通 |accessdate=2012-06-29 |url-status=dead |archiveurl=https://web.archive.org/web/20120713013615/http://www.sz-mtr.com/xlghindex.jsp |archivedate=2012-07-13 }} (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010)){{dead link|date=July 2012}} The combined line will be 40.6 km long. In addition, a 4-station, 7.11 km northern extension from Moyang to Chunqiu Road started construction in May 2022, for an opening in 2026.
It has Tian'edang Yard ({{zh|天鹅荡停车场}}) in use.{{cite news|last=顾蕾|script-title=zh:苏州轨交4号线及支线今年6月动工|url=http://csztv.cn/a/news/2012/5430.html|accessdate=2012-06-19|newspaper=苏州日报|date=2012-02-10|language=Chinese|url-status=dead|archiveurl=https://web.archive.org/web/20120714043137/http://csztv.cn/a/news/2012/5430.html|archivedate=2012-07-14}}
Opening timeline
class="wikitable" style="border-collapse: collapse; text-align: right;"
!Segment !Commencement !Length !Station(s) !Name |
style="text-align: left;" |Hongzhuang — Muli
|15 April 2017 |{{convert|11.1|km|mi|2|abbr=on}} |7 | style="text-align: left;" |Phase 1 south section (taken over from line 4 branch) |
Changlou — Hongzhuang
|1 December 2024{{Cite web |date=29 November 2024 |title=苏州轨道交通7号线将于12月1日10点开通运营 |url=https://mp.weixin.qq.com/s/N-1hIXJDGCjLQmsEAO1S0Q}} | |20 |Phase 1 middle section |
bgcolor="lightgrey"
|Moyang — Changlou | rowspan="2" |TBD | |4 |Phase 1 north section |
bgcolor="lightgrey"
|Baidang South | |1 |infill station |
Stations
class="wikitable"
! colspan="2" | Station name{{cite web|url=https://mp.weixin.qq.com/s/51MtT9WhONZvGSAhadhrww|title=官宣!苏州轨道交通6、7、8号线车站站名定了|date=2024-01-24}} ! rowspan="2" | Connections ! colspan="2" rowspan="2" | Distance ! rowspan="2" | Location ! rowspan="2" | Notes |
{{small|English}}
! {{small|Chinese}} |
---|
style = "background:#{{rcr|SZRT|7}}; height: 2pt"
| colspan = "7" | |
bgcolor="lightgrey"
|{{stl|SZRT|Chunqiulu}} |{{large|{{lang|zh-cn|春秋路}}}} | | - |0 | bgcolor="white" rowspan="15" |Xiangcheng | rowspan="4" |Northern extension. Under construction |
bgcolor="lightgrey"
|{{stl|SZRT|Chunguanglu}} |{{large|{{lang|zh-cn|春光路}}}} | | - | |
bgcolor="lightgrey"
|{{stl|SZRT|Yongchanglu}} |{{large|{{lang|zh-cn|永昌路}}}} | | | |
bgcolor="lightgrey"
|{{stl|SZRT|Shiganglu}} |{{large|{{lang|zh-cn|石港路}}}} | | | |
bgcolor="lightgrey"
|{{stl|SZRT|Moyang}} |{{large|{{lang|zh-cn|莫阳}}}} |{{rint|suzhou|4|na}} | - | | rowspan="4" |Operation postponed |
bgcolor="lightgrey"
|{{stl|SZRT|Zhujing}} |{{large|{{lang|zh-cn|朱泾}}}} | | | |
bgcolor="lightgrey"
|{{stl|SZRT|Suzhou North}} |{{large|{{lang|zh-cn|高铁苏州北站}}}} |{{rint|suzhou|2}} {{rint|suzhou|10|na}} | | |
bgcolor="lightgrey"
|{{stl|SZRT|Xuenan}} |{{large|{{lang|zh-cn|雪南}}}} | | | |
{{stl|SZRT|Changlou}}
|{{large|{{lang|zh-cn|常楼}}}} | | | | |
{{stl|SZRT|Dengyun}}
|{{large|{{lang|zh-cn|登云}}}} | | | | |
{{stl|SZRT|Litanghelu}}
|{{large|{{lang|zh-cn|蠡塘河路}}}} | | | | |
{{stl|SZRT|Chunshenhudonglu}}
|{{large|{{lang|zh-cn|春申湖东路}}}} | | | | |
{{stl|SZRT|Huayuanlu East}}
|{{large|{{lang|zh-cn|华元路东}}}} | | | | |
{{stl|SZRT|Baidang North}}
|{{large|{{lang|zh-cn|白荡北}}}} |{{rint|suzhou|8}} | | | |
bgcolor="lightgrey"
|{{stl|SZRT|Baidang South}} |{{large|{{lang|zh-cn|白荡南}}}} | | | | |
{{stl|SZRT|Banjing}}
|{{large|{{lang|zh-cn|板泾}}}} | | | | bgcolor="white" rowspan="9" |SIP | |
{{stl|SZRT|Yangjing}}
|{{large|{{lang|zh-cn|洋泾}}}} | | | | |
{{stl|SZRT|Jicuiqiao}}
|{{large|{{lang|zh-cn|积翠桥}}}} | | | | |
{{stl|SZRT|Central Park}}
|{{large|{{lang|zh-cn|中央公园}}}} |{{rint|suzhou|1}} | | | |
{{stl|SZRT|Reyunqiao}}
|{{large|{{lang|zh-cn|惹云桥}}}} |{{rint|suzhou|6}} | | | |
{{stl|SZRT|Huangtiandang}}
|{{large|{{lang|zh-cn|黄天荡}}}} |{{rint|suzhou|5}} | | | |
{{stl|SZRT|Loufeng}}
|{{large|{{lang|zh-cn|娄葑}}}} | | | | |
Qunli
|{{large|{{lang|zh-cn|群力}}}} | | | | |
{{stl|SZRT|Tongyuanlu South}}
|{{large|{{lang|zh-cn|通园路南}}}} |{{rint|suzhou|3}} | | | |
{{stl|SZRT|Linjiatan}}
|{{large|{{lang|zh-cn|林家潭}}}} | | | | bgcolor="white" rowspan="13"|Wuzhong | |
{{stl|SZRT|Guoxiang}}
|{{large|{{lang|zh-cn|郭巷}}}} |{{rint|suzhou|2}} | | | |
{{stl|SZRT|Yinshan}}
|{{large|{{lang|zh-cn|尹山}}}} | | | | |
{{stl|SZRT|Jinjiaqiao South}}
|{{large|{{lang|zh-cn|金家桥南}}}} | | | | |
{{stl|SZRT|Fengjinlu}}
|{{large|{{lang|zh-cn|枫津路}}}} | | | | |
{{stl|SZRT|Hongzhuang}}
|{{large|{{lang|zh-cn|红庄}}}} |{{rint|suzhou|4}} | | | |
{{stl|SZRT|Lishu}}
|{{large|{{lang|zh-cn|蠡墅}}}} | | | | |
{{stl|SZRT|Shihu Moshe}}
|{{large|{{lang|zh-cn|石湖莫舍}}}} | | | | |
{{stl|SZRT|Yuexi}}
|{{large|{{lang|zh-cn|越溪}}}} | | | | |
{{stl|SZRT|Wenxi Lu}}
|{{large|{{lang|zh-cn|文溪路}}}} | | | | |
{{stl|SZRT|Tian'edang Lu}}
|{{large|{{lang|zh-cn|天鹅荡路}}}} | | | | |
{{stl|SZRT|Suzhouwan North}}
|{{large|{{lang|zh-cn|苏州湾北}}}} | | | | |
{{stl|SZRT|Muli}}
|{{large|{{lang|zh-cn|木里}}}} | | | | |
style = "background:#{{rcr|SZRT|7}}; height: 2pt"
| colspan ="7"| |
Rolling stock
class="wikitable sortable" style="font-size: 95%;" | |
Fleet numbers
! Year Built ! Time in service ! Builder ! Class ! Number in service ! No ! Assembly ! Rolling stock ! Number ! Depots ! Line assigned ! Notes |
---|
bo,
| 396 (66 sets) | 2023-2025 (planned) | N/A | CRRC Nanjing Puzhen | B | Never built | 6 | Tc+Mp+M - M + Mp+Tc | PM227 | 070101-076606 | None | {{rint|suzhou|7}} (planned) | The order scrapped in February 2023. |
300 (50 sets)
| 2023-2025{{Efn|1=Cars modified under contract PM259.}} | 2024-present | CRRC Nanjing Puzhen | B | 132 (22 sets) | 6 | Tc+Mp+M - M + Mp+Tc | PM259 | 070101-075006 | Tian'Edang Yard | {{rint|suzhou|7}} | Converted from PM101, PM102 and PM116. |