Line 8 (Mumbai Metro)

{{Short description|Rapid transit line in Mumbai}}

{{Use dmy dates|date=June 2022}}

{{Use Indian English|date=June 2022}}

{{Infobox rail line

| box_width =

| name = File:MMRDA logo cropped.svg Mumbai Metro Line 8

| other_name = Gold Line

| native_name_lang =

| color = {{rcr|Mumbai Metro|8}}

| logo =

| logo_width =

| logo_alt =

| image = Maha Mumbai Metro.png

| image_width =

| image_alt =

| caption =

| type = Airport Express Train

| system = Mumbai Metro

| status = Approved by the State Government

| locale = Mumbai, Maharashtra, India

| start = CSMIA T2

| end = NMIA

| stations =

| routes =

| daily_ridership =

| ridership2 =

| planopen =

| open =

| yearcompleted =

| event1label =

| event1 =

| event2label =

| event2 =

| event3label =

| event3 =

| owner = MMRDA, CIDCO

| operator = MMRDA, CIDCO

| character = Elevated

| depot =

| stock =

| linelength_km = 35

| tracklength_km =

| tracks =

| gauge = {{RailGauge|sg|allk=on}}

| load_gauge =

| minradius =

| racksystem =

| routenumber =

| linenumber =

| electrification =

| speed_km/h =

| elevation_m =

| elevation_ft =

| elevation =

| website =

| map =

| map_name = map_name

| map_state = uncollapsed

}}

Line 8 or the Gold Line is a proposed line of the Mumbai Metro. It would run from Chhatrapati Shivaji Maharaj International Airport to the under construction Navi Mumbai International Airport.{{Cite news |date=2018-03-30 |title=Mumbai’s airport Metro will have a train every 15 minutes |url=https://www.hindustantimes.com/mumbai-news/mumbai-s-airport-metro-will-have-a-train-every-15-minutes/story-Nh3JrKnUhM6jrzPiCvezoN.html |archive-url=http://web.archive.org/web/20240624034002/https://www.hindustantimes.com/mumbai-news/mumbai-s-airport-metro-will-have-a-train-every-15-minutes/story-Nh3JrKnUhM6jrzPiCvezoN.html |archive-date=2024-06-24 |access-date=2024-12-27 |work=Hindustan Times |language=en-us}}{{Cite news |date=2024-12-13 |title=Gold Line Metro: Maharashtra govt to finalise executing agency for Rs 15,000 crore corridor linking Mumbai, Navi Mumbai airports |url=https://timesofindia.indiatimes.com/city/mumbai/metro-8-project-awaits-decision-on-executing-agency-after-poll-break/articleshow/116258897.cms |access-date=2024-12-27 |work=The Times of India |issn=0971-8257}} The {{Convert|35|km|mi|adj=on}} line would be fully elevated and cost {{Currency|150 billion|INR}}. The proposed line would have a frequency of 15 minutes and five or six stations, a relatively low density.

It has been approved by the Government of Maharashtra, and the Detailed Project Report will be made by CIDCO. It is to be developed in a Public-Private Partnership (PPP) model, similar to Mumbai Metro Line 1.{{Cite news |date=2025-01-28 |title=Metro Line 8 approved: Seamless Chhatrapati Shivaji Maharaj International Airport (CSMIA) to Navi Mumbai International Airport (NMIA) connectivity; all you need to know |url=https://timesofindia.indiatimes.com/city/mumbai/metro-8-linking-two-airports-to-be-built-under-ppp-model/articleshow/117610868.cms |access-date=2025-03-02 |work=The Times of India |issn=0971-8257}}

References

{{Reflist}}

{{Mumbai Metro navbox|line 8=yes}}

Category:Mumbai Metro lines