List of natural gas pipelines in Western Australia
{{Short description|none}}
{{Use Australian English|date=April 2024}}
{{Use dmy dates|date=November 2019}}
This is a list of the major natural gas pipelines operating within Western Australia.
{{cite web
|url=http://www.apia.net.au/shadomx/apps/fms/fmsdownload.cfm?file_uuid=6FAA2543-1C23-CACD-229A-24B2BE557CE5&siteName=apia
|title=List of Australian Pipeline Licenses|publisher=Australian Pipeline Industry Association|date=8 February 2008|accessdate=2009-01-16
}} {{Dead link|date=October 2010|bot=H3llBot}}
Onshore pipelines
class="wikitable" | |||||
Name (year commissioned) | Owner/operator | Length | Maximum diameter | From/to | Licence number |
---|---|---|---|---|---|
Dampier to Bunbury Natural Gas Pipeline (1984) | Dampier Bunbury Pipeline | 1,530 km | 660 mm | Dampier to Bunbury | PL 40 |
Goldfields Gas Transmission Pipeline (1996) | GGT Joint venture (APA Group & Others) | 1,426 km | 400 mm | Near Compressor Station 1 to Kalgoorlie | PL 24 |
Parmelia Pipeline (1971) | APA Group | 416 km | 356 mm | Dongara to Pinjarra | PL 1 |
Pilbara Energy Pipeline (1996) | APA Group | 215 km | 450 mm | Karratha to Port Hedland | PL 22 |
Mid West Gas Pipeline (1999) | APA Group and Western Power | 352 km | 219 mm | Geraldton to Windimurra | PL 43 |
Kambalda Esperance Pipeline (2003) | Esperance Pipeline Co | 340 km | 150 mm | Kambalda to Esperance | PL 59 |
Telfer Pipeline (2003) | APA Group & EII | 443 km | 250 mm | Port Hedland to Telfer | PL 60 |
Subsea (offshore) pipelines
class="wikitable" | |||||
Name (year commissioned) | Owner/operator | Length | Maximum diameter | From/to | Licence number |
---|---|---|---|---|---|
North Rankin to Withnell Bay (1983) | Woodside | 104 km | 1016 mm | North Rankin A platform to Withnell Bay (near Dampier) | WA-1 PL |
TSEP NWS Pipeline (2004) | Woodside | 104 km | 1066 mm | North Rankin A platform to Withnell Bay (near Dampier) | WA -10 PL |
Varanus Island Gas Sales Line (1992)Note: Length of Varanus Island Gas Sales pipelines includes approximately 30km onshore | Kufpec Australia Ltd | 100 km | 300 mm | Varanus Island to Compressor Station 1 | TPL-8 |
Varanus Island Gas Sales Line (1999) | Kufpec Australia Ltd | 100 km | 406 mm | Varanus Island to Compressor Station 1 | TPL-13 |
See also
References and notes
{{reflist}}
Further reading
- (2007) The Petroleum Explorers Guide to Western Australia. Third Edition Department of Industry and Resources of Western Australia {{ISBN|978-1-877065-06-4}} (PDF)
External links
- https://web.archive.org/web/20080511200417/http://www.doir.wa.gov.au/
{{Economy of Australia}}