List of tallest buildings in Arlington County, Virginia

{{Short description|None}}

{{Use American English|date=August 2019}}

{{Use mdy dates|date=August 2019}}

File:Rosslyn.jpg skyline in 2024]]

File:Crystal City skyline.jpg in Washington D.C.]]

This is a list of the tallest buildings in Arlington County, Virginia, ranked by height.{{cite web|url=http://www.emporis.com/statistics/tallest-buildings-arlington-va-usa|archive-url=https://web.archive.org/web/20120711041144/http://www.emporis.com/statistics/tallest-buildings-arlington-va-usa|url-status=usurped|archive-date=July 11, 2012|title=Arlington - Statistics - EMPORIS|access-date=14 April 2017}} Due to the height restrictions imposed in Washington D.C., many of the tallest buildings in the D.C metropolitan area are constructed in Arlington, right across the Potomac River from Washington.{{cite web|url=https://www.washingtonpost.com/wp-dyn/content/article/2006/06/30/AR2006063001316.html|title=D.C.'s Fear of Heights|first=Michael|last=Grunwald|date=2 July 2006|access-date=14 April 2017|via=washingtonpost.com}}

Under Virginia law, towns may be incorporated within counties; however, the state does not permit the creation of any new incorporated towns within a county that has a population density greater than 1,000 persons per square mile. As such, Arlington has no incorporated towns within its borders, but a number of neighborhoods within Arlington are commonly referred to by name as if they were distinct towns.{{cite web |title=Neighborhoods |url=https://www.arlingtonva.us/Government/Projects/Neighborhoods |website=arlingtonva.us}} The largest and most prominent of these neighborhoods are Rosslyn, Pentagon City, Crystal City, Courthouse, and Ballston. Each are located along the Blue, Orange, Silver and/or Yellow lines of the Washington Metro rail system and contain Arlington's tallest buildings.

Tallest buildings

List of completed buildings in Arlington that stand at least {{convert|200|ft}} tall based on standard height measurement.

class{{=}}"wikitable sortable" style{{=}}"text-align:center"
Rank

!Name

!class="unsortable"|Picture

!scope="col" style="width: 47px;"|Height
ft (m)

!Floors

!Year

!Area

!Primary Use

!class="unsortable"|Notes

1

| Central Place Tower

| 100px

| {{convert|391|ft|m|0}}

| 32

| 2017

| Rosslyn

| Office

| Tallest buildings in Arlington since 2017. The View of DC provides access to the top two floors, with a publicly accessible vantage point that opened June 21, 2018.{{cite web|url=https://www.rosslynva.org/go/the-view-of-dc.html|title=The View of D.C|access-date=3 April 2024|via=rosslynva.org}}

2

| 1812 North Moore Street

| 100px

| {{convert|390|ft|m|0|abbr=values}}

| 35

| 2013

| Rosslyn

| Office

| Was the tallest building in the Washington metropolitan area at the time of completion, overtaking the Rosslyn Twin Towers. Was surpassed by the Capital One Tower in 2017.{{Cite web|url=https://commercialobserver.com/2019/08/nestle-expands-rosslyn-headquarters-to-300k-sf/|title=Nestlé Expands Rosslyn Headquarters to 300K SF|date=8 August 2019|last=Loria|first=Keith|website=Commercial Observer|accessdate=5 April 2024}}

rowspan=2| 3

| Rosslyn Twin Tower One

| File:The Pentagon (side).jpg

| {{convert|381|ft|m|0|abbr=values}}

| 31

| 1980

| Rosslyn

| Office

| {{cite web|url=https://www.mondayre.com/portfolio/the-towers.html|title=1000 Wilson Boulevard|access-date=10 April 2024|via=mondayre.com}}{{cite web|url=https://www.skyscrapercenter.com/building/rosslyn-twin-tower-one/10150.html|title=Rosslyn Twin Tower One|access-date=9 April 2024|via=skyscrapercenter.com}}

Rosslyn Twin Tower Two

| File:The Pentagon (side).jpg

| {{convert|381|ft|m|0|abbr=values}}

| 31

| 1982

| Rosslyn

| Office

| {{cite web|url=https://www.mondayre.com/portfolio/the-towers-2.html|title=1100 Wilson Boulevard|access-date=10 April 2024|via=mondayre.com}}{{cite web|url=https://www.skyscrapercenter.com/building/rosslyn-twin-tower-two/10151.html|title=Rosslyn Twin Tower Two|access-date=9 April 2024|via=skyscrapercenter.com}}

5

| Central Place Residential Tower

| 100px

| {{convert|355|ft|m|0|abbr=values}}

| 31

| 2016

| Rosslyn

| Residential

| Tallest residential building in Arlington. {{cite web|url=https://www.skyscrapercenter.com/building/central-place-residential-tower/16320.html|title=Central Place Residential Tower|access-date=10 April 2024|via=skyscrapercenter.com}}

6

| 1801 North Lynn Street

| 100px

| {{convert|344|ft|m|0|abbr=values}}

| 24

| 2002

| Rosslyn

| Office

| {{cite web|url=https://www.skyscrapercenter.com/building/1801-north-lynn-street/18712.html|title=1801 North Lynn Street|access-date=10 April 2024|via=skyscrapercenter.com}}

rowspan=2 | 7

| Metropolitan Park 6

| {{Upload image}}

| {{convert|327|ft|m|0|abbr=values}}

| 22

| 2023

| Pentagon City

| Office

| Part of Amazon's HQ2{{cite web|url=https://www.metpark678.com.html|title=Metropolitan Park, Phases 6/7/8|access-date=3 April 2024|via=metpark678.com}}

Metropolitan Park 7/8

| {{Upload image}}

| {{convert|327|ft|m|0|abbr=values}}

| 22

| 2023

| Pentagon City

| Office

| Part of Amazon's HQ2{{cite web|url=https://www.arlingtoneconomicdevelopment.com/Locate-in-Arlington/Commercial-Development/Development-Summary-Listing-Directory-Folder/1400-S.-Eads-St.-Metropolitan-Park-Amazon-HQ2-Phase-I.html|title=Metropolitan Park - Amazon HQ2 Phase I|access-date=3 April 2024|via=arlingtoneconomicdevelopment.com}}{{cite web|url=https://www.arlingtonva.us/Government/Projects/Project-Types/Site-Plan/Met-Park-Phases-6-8.html|title=Metropolitan Park Phases 6 &7/8|access-date=3 April 2024|via=arlingtonva.us}}

9

| Turnberry Tower

| 100px

| {{convert|313|ft|m|0|abbr=values}}

| 26

| 2009

| Rosslyn

| Residential

| Condo tower with 248 units{{cite web|url=https://www.condo.com/building/Turnberry-Tower-Arlington-VA-22209-3851.html|title=Turnberry Tower|access-date=6 April 2024|via=condo.com}}

rowspan=4| 10

| One Waterview Place

| {{Upload image}}

| {{convert|300|ft|m|0|abbr=values}}

| 24

| 2008

| Rosslyn

| Office

| {{cite web|url=https://www.skyscrapercenter.com/building/one-waterview-place/28189.html|title=One Waterview Place|access-date=6 April 2024|via=skyscrapercenter.com}}

Two Waterview Place

| {{Upload image}}

| {{convert|300|ft|m|0|abbr=values}}

| 30

| 2007

| Rosslyn

| Residential/Hotel

| {{cite web|url=https://www.skyscrapercenter.com/building/two-waterview-place/28190.html|title=Two Waterview Place|access-date=6 April 2024|via=skyscrapercenter.com}}

The Reva

| {{Upload image}}

| {{convert|300|ft|m|0|abbr=values}}

| 27

| 2024

| Crystal City

| Residential

| 471 units and 16,800 SF of retail{{cite web|url=https://www.clarkconstruction.com/our-work/projects/grace-and-reva.html|title=The Grace and Reva|access-date=6 April 2024|via=clarkconstruction.com}}

The Grace

| {{Upload image}}

| {{convert|300|ft|m|0|abbr=values}}

| 26

| 2024

| Crystal City

| Residential

| 337 units and 21,800 SF of retail{{cite web|url=https://www.clarkconstruction.com/our-work/projects/grace-and-reva.html|title=Residents could start moving into two nearly complete apartment towers in Crystal City next month|first=Jo|last=DeVoe|access-date=6 April 2024|via=clarkconstruction.com}}

14

| Rosslyn Metro Center II

| {{Upload image}}

| {{convert|298|ft|m|0|abbr=values}}

| 27

| 2002

| Rosslyn

| Office

| {{cite web|url=https://www.skyscrapercenter.com/building/rosslyn-metro-center/28167.html|title=Rosslyn Metro Center|access-date=6 April 2024|via=skyscrapercenter.com}}

15

| Evo at The Highlands

| 100px

| {{convert|293|ft|m|0|abbr=values}}

| 27

| 2021

| Rosslyn

| Residential

| Also known by its working name "Cortland Rosslyn East".{{cite web|url=http://arlington.granicus.com/MetaViewer.php?view_id=2&clip_id=3314&meta_id=157770|title=County Board Agenda Item Meeting of February 25, 2017|date=22 February 2017|website=Arlington County, Virginia|accessdate=23 September 2020}}

16

| 4040 Wilson Boulevard

| {{Upload image}}

| {{convert|278|ft|m|0|abbr=values}}

| 31

| 2016

| Ballston

| Residential

| Was the tallest residential building outside of Rosslyn before 2024.

17

| The Whitmer

| {{Upload image}}

| {{convert|270|ft|m|0|abbr=values}}

| 25

| 2019

| Pentagon City

| Residential

| {{cite web|url=https://skyscraperpage.com/cities/?buildingID=121910|title=The Whitmer Pentagon City|access-date=10 April 2024|via=skyscraperpage.com}}

18

| 4000 North Fairfax

| {{Upload image}}

| {{convert|267|ft|m|0|abbr=values}}

| 22

| 2020

| Ballston

| Residential

| {{cite web|url=https://j-solapartments.com/.html|title=J Sol Apartments|access-date=6 April 2024|via=j-solapartments.com}}

19

| Aubrey at The Highlands

| 100px

| {{convert|263|ft|m|0|abbr=values}}

| 23

| 2021

| Rosslyn

| Apartments

| Also known by its working name "Cortland Rosslyn West".{{cite web|url=https://studios.com/aubrey-at-the-highlands.html.html|title=Aubrey at The Highlands|access-date=10 April 2024|via=j-solapartments.com}}

20

| The Bartlett at Metropolitan Park

| {{Upload image}}

| {{convert|261|ft|m|0|abbr=values}}

| 22

| 2016

| Pentagon City

| Residential

|

21

| Arlington Tower

| {{Upload image}}

| {{convert|250|ft|m|0|abbr=values}}

| 19

| 1980

| Rosslyn

| Office

| {{cite web|url=https://marketplace.vts.com/building/arlington-tower-1300-north-17th-street-arlington-va.html|title=Arlington Tower-1300 North 17th Street

|access-date=6 April 2024|via=cmarketplace.vts.com}}

22

| Hilton Arlington & Towers

| {{Upload image}}

| {{convert|246|ft|m|0|abbr=values}}

| 26

| 1980

| Ballston

| Hotel

| Contains a Hilton Hotel with the Alta Vista (condos) on the top floors.{{cite web|url=https://www.highrises.com/buildings/arlington_va/the-alta-vista_900-n-stafford-st_6119.html|title=The Alta Vista of Arlington|access-date=10 April 2024|via=highrises.com}}{{cite web|url=https://skyscraperpage.com/cities/?buildingID=17623.html|title=Arlington Hilton & Towers|access-date=10 April 2024|via=skyscraperpage.com}}

23

| Ballston Place

| {{Upload image}}

| {{convert|244|ft|m|0|abbr=values}}

| 24

| 2001

| Ballston

| Residential

| {{cite web|url=https://skyscraperpage.com/cities/?buildingID=17793.html|title=Ballston Place|access-date=10 April 2024|via=skyscraperpage.com}}

24

| 1101 Wilson Boulevard

| {{Upload image}}

| {{convert|230|ft|m|0|abbr=values}}

| 24

| 1989

| Rosslyn

| Office

| {{cite web|url=https://www.mondayre.com/portfolio/1101-wilson-boulevard.html|title=1101 Wilson Boulevard|access-date=10 April 2024|via=mondayre.com}}

25

| Bella Vista

| {{Upload image}}

| {{convert|223|ft|m|0|abbr=values}}

| 21

| 1988

| Crystal City

| Residential

| {{cite web|url=https://arlingtoncondo.com/condo/bella-vista/.html|title=Bella Vista|access-date=3 April 2024|via=arlingtoncondo.com}}{{cite web|url=https://skyscraperpage.com/cities/?buildingID=17296.html|title=Bella Vista|access-date=3 April 2024|via=skyscraperpage.com}}

26

| The Commodore

| 100px

| {{convert|220|ft|m|0|abbr=values}}

| 20

| 2023

| Courthouse

| Residential

| Tallest building in Courthouse{{cite web|url=https://www.coopercarry.com/projects/courthouse-residential.html|title=The Commodore at Courthouse|access-date=3 April 2024|via=coopercarry.com}}

27

| Residences at Liberty Center

| {{Upload image}}

| {{convert|219|ft|m|0|abbr=values}}

| 21

| 2008

| Ballston

| Residential

| {{cite web|url=https://skyscraperpage.com/cities/?buildingID=17613.html|title=Residences at Liberty Square|access-date=10 April 2024|via=skyscraperpage.com}}

28

| Crystal Plaza II

| {{Upload image}}

| {{convert|218|ft|m|0|abbr=values}}

| 20

| 2009

| Crystal City

| Residential

| {{cite web|url=https://www.skyscrapercenter.com/building/crystal-plaza-ii/26192.html|title=Crystal Plaza II|access-date=10 April 2024|via=skyscrapercenter.com}}

rowspan=4| 29

| AVA Ballston Square I

| {{Upload image}}

| {{convert|217|ft|m|0|abbr=values}}

| 22

| 1992

| Ballston

| Residential

| Formerly Lincoln Towers at Ballston I, has since been renovated and renamed.{{cite web|url=https://skyscraperpage.com/cities/?buildingID=17337.html|title=Lincoln Towers at Ballston I|access-date=10 April 2024|via=skyscraperpage.com}}

AVA Ballston Square II

| {{Upload image}}

| {{convert|217|ft|m|0|abbr=values}}

| 22

| 1992

| Ballston

| Residential

| Formerly Lincoln Towers at Ballston II, has since been renovated and renamed.{{cite web|url=https://skyscraperpage.com/cities/?buildingID=17795.html|title=Lincoln Towers at Ballston II|access-date=10 April 2024|via=skyscraperpage.com}}

Meridian at Ballston Commons

| {{Upload image}}

| {{convert|217|ft|m|0|abbr=values}}

| 21

| 1997

| Ballston

| Residential

| {{cite web|url=https://skyscraperpage.com/cities/?buildingID=17336.html|title=Meridian at Ballston Commons|access-date=10 April 2024|via=skyscraperpage.com}}

The Continental at Ballston

| {{Upload image}}

| {{convert|217|ft|m|0|abbr=values}}

| 21

| 2003

| Ballston

| Residential

| {{cite web|url=https://skyscraperpage.com/cities/?buildingID=76998.html|title=The Continental at Ballston|access-date=10 April 2024|via=skyscraperpage.com}}

33

| Quincy Plaza

| {{Upload image}}

| {{convert|215|ft|m|0|abbr=values}}

| 21

| 2006

| Ballston

| Residential

| {{cite web|url=https://skyscraperpage.com/cities/?buildingID=17786.html|title=Quiuncy Plaza|access-date=10 April 2024|via=skyscraperpage.com}}

Tallest buildings: Site Prep or Under Construction

List of buildings that are currently under construction in Arlington and are expected to rise to a height of at least {{cvt|200|ft}}.

class="wikitable sortable" style{{=}}"text-align:center"
Name

!class="unsortable"|Picture

!scope="col" style="width: 47px;"|Height
ft (m)

!Floors

!Year

!Status

!Area

!Use

!class="unsortable"|Notes

Hilton at The Key

| {{Upload image}}

| {{convert|379|ft|m|0}}

| 36

| 2025

| Under Construction

| Rosslyn

| Hotel

| Part of The Key. Full service hotel will contain 331 rooms, 28,000 SF of conference space, and retail.{{cite web|url=https://www.mtfad-p.com/design-projects/the-key-at-rosslyn.html|title="The Key" Rosslyn Mixed-Use Transformation|access-date=6 April 2024|via=mtfad-p.com}}{{cite web|url=https://www.arlnow.com/2022/10/13/new-huge-hilton-hotel-coming-to-new-rosslyn-development/.html|title=NEW: Huge Hilton hotel coming to new Rosslyn development|access-date=6 April 2024|via=ARLnow.com}}

Rosslyn Towers at The Key

| {{Upload image}}

| {{convert|310|ft|m|0}}

| 28

| 2024

| Under Construction

| Rosslyn

| Residential

| Part of The Key. Luxury apartments will contain 500+ units, 28,000 SF of conference space, and retail.{{cite web|url=https://www.arlnow.com/2024/02/07/rosslyns-newest-residential-tower-nears-completion-while-adjacent-hotel-slated-for-late-2025-debut/.html|title=Rosslyn's newest residential tower nears completion|first=James|last=Jarvis|access-date=6 April 2024|via=ARLnow.com}}

1901 N. Moore St.

| {{Upload image}}

| {{convert|260|ft|m|0}}

| 27

| 2026

| Under Construction

| Rosslyn

| Residential

| Luxury apartments with 442 units and 12,130 SF of retail. Joined at the base and at the top by an "amenity bridge"{{cite web|url=https://www.arlnow.com/2021/06/14/rca-redevelopment-in-rosslyn-gets-green-light/.html|title=RCA Redevelopment in Rosslyn Gets Green Light|first=Jo|last=DeVoe|access-date=6 April 2024|via=ARLnow.com}}{{cite web|url=https://www.cbgbuildingcompany.com/projects/1901-north-moore-street/.html|title=1901 North Moore Street|access-date=6 April 2024|via=cbgbuildingcompany.com}}

Crystal Plaza West

| {{Upload image}}

| {{convert|250|ft|m|0}}

| 25

| 2025

| Under Construction

| Crystal City

| Residential

| 365 units and 18,510 SF of retail.{{cite web|url=https://www.arlnow.com/2021/01/12/proposal-for-two-new-residential-towers-in-crystal-city-enters-home-stretch/.html|title=Proposal for Two New Residential Towers in Crystal City Enters Home Stretch|first=Jo|last=DeVoe|access-date=6 April 2024|via=ARLnow.com}}

Crystal Plaza East

| {{Upload image}}

| {{convert|200|ft|m|0}}

| 19

| 2025

| Under Construction

| Crystal City

| Residential

| 421 units and 11,060 SF of retail.{{cite web|url=https://www.arlnow.com/2024/02/14/two-apartment-towers-in-crystal-city-could-be-completed-by-spring-2025/.html|title=Two apartment towers in Crystal City could be completed by spring 2025|first=James|last=Jarvis|access-date=6 April 2024|via=ARLnow.com}}

The Wendy

| 100px

| {{convert|200|ft|m|0}}

| 16

| 2025

| Under Construction

| Courthouse

| Residential

| 421 units and 11,060 SF of retail.{{cite web|url=https://www.coopercarry.com/projects/2025-clarendon-boulevard/.html|title=2025 Clarendon Boulevard|access-date=6 April 2024|via=coopercarry.com}}

Tallest buildings: Approved or Proposed

class="wikitable sortable" style{{=}}"text-align:center"
Name

!scope="col" style="width: 47px;"|Height
ft (m)

!Floors

!Status

!Area

!Use

!class="unsortable"|Notes

The Helix

| {{convert|354|ft|m|0|abbr=values}}

| 15

| Approved

| Pentagon City

| Amenity

| Part of Amazon HQ2 Phase 2. Utility work is currently underway.{{cite web|url=https://www.cnn.com/style/article/amazon-hq2-design-helix/index.html|title=Amazon HQ2 Design Helix|date=February 2, 2021 |access-date=10 April 2024|via=cnn.com}}

1400 Key Phase 1

| {{convert|350|ft|m|0|abbr=values}}

| 32

| Approved

| Rosslyn

| Residential

| 274 units with grocery store on street-level.{{cite web|url=https://www.arlingtoneconomicdevelopment.com/Locate-in-Arlington/Commercial-Development/Development-Summary-Listing-Directory-Folder/1401-Wilson-Blvd.-1400-Key-Redevelopment.html|title=1400 Key Redevelopment|access-date=10 April 2024|via=arlingtoneconomicdevelopment.com}}

1400 Key Phase 2

| {{convert|350|ft|m|0|abbr=values}}

| 29

| Approved

| Rosslyn

| Office

| Includes 52,000 SF of retail.{{cite web|url=https://www.mondayre.com/portfolio/1400-key-redevelopment.html|title=1400 Key Redevelopment|access-date=10 April 2024|via=mondayre.com}}

PenPlace I

| {{convert|327|ft|m|0|abbr=values}}

| 22

| Approved

| Pentagon City

| Office

| Part of Amazon HQ2 Phase 2. Utility work is currently underway.{{cite web|url=https://www.arlingtonva.us/Government/Projects/Project-Types/Site-Plan/Pen-Place-2021.html|title=PenPlace|access-date=11 April 2024|via=arlingtonva.us}}

PenPlace II

| | {{convert|327|ft|m|0|abbr=values}}

| 22

| Approved

| Pentagon City

| Office

| Part of Amazon HQ2 Phase 2. Utility work is currently underway.{{cite web|url=https://www.arlingtoneconomicdevelopment.com/Locate-in-Arlington/Commercial-Development/Development-Summary-Listing-Directory-Folder/1100-S.-Eads-St.-PenPlace-Amazon-HQ2-Phase-II.html|title=PenPlace - Amazon HQ2 Phase II|access-date=11 April 2024|via=arlingtoneconomicdevelopment.com}}

PenPlace III

| {{convert|327|ft|m|0|abbr=values}}

| 22

| Approved

| Pentagon City

| Office

| Part of Amazon HQ2 Phase 2. Utility work is currently underway.{{cite web|url=https://senecagroup.com/portfolio/penplace/.html|title=Amazon HQ2 Design Helix|access-date=11 April 2024|via=senecagroup.com}}

Ames Center South

| {{convert|320|ft|m|0|abbr=values}}

| 31

| Approved

| Rosslyn

| Residential

| 424 units.{{cite web|url=https://www.rosslynva.org/development/ames-center-redevelopment.html|title=Ames Center Redevelopment|access-date=11 April 2024|via=rosslynva.org}}

Ames Center North

| {{convert|310|ft|m|0|abbr=values}}

| 30

| Approved

| Rosslyn

| Residential

| 364 units. Existing church and gas station will be incorporated into the base.{{cite web|url=https://www.arlingtonva.us/Government/Projects/Project-Types/Site-Plan/1820-Fort-Myer-Drive.html|title=1820 Fort Myer Drive – Ames Center|access-date=11 April 2024|via=arlingtonva.us}}

Crystal Plaza 5 West

| {{convert|309|ft|m|0|abbr=values}}

| 30

| Approved

| Crystal City

| Residential

| 613 units and 4,379 SF of retail.{{cite web|url=https://www.arlingtonva.us/Government/Projects/Project-Types/Site-Plan/2250-Crystal-Drive.html|title=2250 Crystal Drive / 223 23rd St. S. – Crystal Plaza 5|access-date=11 April 2024|via=arlingtonva.us}}

Crystal Plaza 5 East

| {{convert|304|ft|m|0|abbr=values}}

| 30

| Approved

| Crystal City

| Residential

| 827 units and 13,059 SF of retail.{{cite web|url=https://www.arlingtoneconomicdevelopment.com/Locate-in-Arlington/Commercial-Development/Development-Summary-Listing-Directory-Folder/2250-Crystal-Dr.-Crystal-Plaza-5.html|title=Crystal Plaza 5|access-date=11 April 2024|via=arlingtoneconomicdevelopment.com}}

Building F

| {{convert|296|ft|m|0|abbr=values}}

| 27

| Proposed

| Pentagon City

| Hotel/Residential

| Part of proposed redevelopment of Pentagon Centre.{{cite web|url=https://www.arlnow.com/2024/07/08/greater-density-more-public-space-proposed-in-pentagon-city-redevelopment-plan/.html|title=Pentagon Centre Redevelopment|access-date=10 July 2024|via=arlnow.com}}

Building B1 Phase II

| {{convert|295|ft|m|0|abbr=values}}

| 21

| Proposed

| Pentagon City

| Office

| Part of proposed redevelopment of Pentagon Centre.

Xerox Building

| {{convert|290|ft|m|0|abbr=values}}

| 31

| Proposed

| Rosslyn

| Residential

| 691 units and 11,355 SF of retail.{{cite web|url=https://www.arlingtoneconomicdevelopment.com/Locate-in-Arlington/Commercial-Development/Development-Summary-Listing-Directory-Folder/1616-Fort-Myer-Dr.-Xerox-Building.html|title=Xerox Building|access-date=11 April 2024|via=arlingtoneconomicdevelopment.com}}

Building E

| {{convert|289|ft|m|0|abbr=values}}

| 20

| Proposed

| Pentagon City

| Office

| Part of proposed redevelopment of Pentagon Centre.

Building B1 Phase I

| {{convert|276|ft|m|0|abbr=values}}

| 25

| Proposed

| Pentagon City

| Residential

| Part of proposed redevelopment of Pentagon Centre.

New Century Center

| {{convert|270|ft|m|0|abbr=values}}

| 24

| Approved

| Crystal City

| Residential

| 302 units and 21,836 SF of retail.{{cite web|url=https://www.arlingtonva.us/Government/Projects/Project-Types/Site-Plan/New-Century-Center.html|title=New Century Center Residential|access-date=11 April 2024|via=arlingtonva.us}}

Timeline of tallest buildings

File:Rosslyn 1964.png

List of buildings that were once the tallest in Arlington.

class="wikitable sortable" style{{=}}"text-align:center"
Name

! class="unsortable"| Image

! Years as tallest

! scope="col" style="width: 47px;"|Height
ft (m)

! Floors

! class="unsortable"| Reference

Tower Villas

|

| 1972–1980

| {{convert|194|ft|m|0|abbr=values}}

| 18

| {{Cite web|url=https://skyscraperpage.com/cities/?buildingID=76738.html|title=Tower Villas|date=8 August 2019|accessdate=5 April 2024|via=skyscraperpage.com}}

Rosslyn Twin Tower One

| File:The Pentagon (side).jpg

| 1980–2013

| {{convert|381|ft|m|0|abbr=values}}

| 27

|

1812 North Moore Street

| 100px

| 2013–2017

| {{convert|390|ft|m|0|abbr=values}}

| 35

|

Central Place Tower

| 100px

| 2017–Present

| {{convert|391|ft|m|0}}

| 32

| {{cite web|url=https://www.rosslynva.org/go/the-view-of-dc.html|title=The View of D.C|access-date=3 April 2024|via=rosslynva.org}}

See also

References