Ludhiana–Bathinda–Ajmer Expressway

{{Short description|Road in India}}

{{Use dmy dates|date=October 2017}}

{{Use Indian English|date=October 2017}}

{{infobox road

|country=IND

|name = Ludhiana–Bathinda–Ajmer Expressway

|map=

|length_km= 600

|direction_a= North

|terminus_a= Ludhiana

|junction=

|direction_b= South

|terminus_b= Ajmer

|formed=

|history=

|states= Punjab, Haryana and Rajasthan

|cities =

|maint =

}}

Ludhiana–Bathinda–Ajmer Expressway (earlier called Pathankot-Ajmer Expressway), consisting of 2 separate Ludhiana–Bathinda Expressway and Bathinda–Ajmer Expressway projects on the "Ludhiana–Ajmer Economic Corridor (EC-8)", is 6-lane (extendable to 8-lanes) access-controlled under-construction express national highway project by the NHAI which will connect Pathankot via Ludhiana to Bathinda and Ajmer. The movement of goods will be facilitated, via Ajmer, from northern states to ports at western coast such as Kandla port.

The expressway for the "Ludhiana–Ajmer Economic Corridor (EC-8)" was redesigned and broken into the following 3 different expressways, PathankotLudhiana Expressway (subsumed in Delhi–Amritsar–Katra Expressway), Ludhiana–Bathinda Expressway, and Bathinda-Ajmer Expressway.[https://www.thebetterindia.com/141388/5-new-highways/ 5 New Greenfield Highways To Cut Travel Time Planned: All You Need To Know], /www.thebetterindia.com

Route

The expressway for the "Ludhiana–Ajmer Economic Corridor (EC-8)" was redesigned and broken into the following 3 different expressways:

=Pathankot-Ludhiana Expressway=

It is already part of another larger standalone greenfield Delhi–Amritsar–Katra Expressway project.

=Ludhiana–Bathinda Expressway=

"Ludhiana–Bathinda Expressway" is an approved 75.543 km long {{INRConvert|1716.17|c}} standalone greenfield project. It begins from the Delhi–Amritsar–Katra Expressway at "Ballowal" village 10 km southwest of Ludhiana and end at the Rampura Phul near Bathinda on the "Amritsar–Bathinda Expressway" section of the larger "Amritsar–Jamnagar Expressway".

  • Package 1- on Bathinda side: ends at Rampura Phul on NH-7 between Bathinda–Barnala.
  • Package 2- on Ludhiana side: begins at Ballowal on Delhi-Amritsar-Katra Expressway and ending near Sehna near Barnala. Includes connectivity to the Ludhiana International Airport.

=Bhatinda–Ajmer Expressway=

"Bhatinda–Ajmer Expressway", approved by NHAI in May 2018 as a standalone greenfield project, will reduce the existing distance between Bhatinda and Ajmer by 120 km. The route will pass through Bhatinda, Sirsa (Jodhkan and Rampura Dhillon), Bhadra, Taranagar, Churu, Shekhawati, Salasar-Sikar, Kuchaman City, Makrana.

== Punjab ==

{{see also | List of national highways in Punjab, India | l1= National highways in Punjab | List of state highways in Punjab | l2 = State highways in Punjab}}

Existing NH route passes through 2 districts.

== Haryana==

{{see also | List of highways in Haryana}}

Greenfield alignment passes through 1 district:

== Rajasthan==

{{see also | List of state highways in Rajasthan }}

Greenfield alignment and upgrade of existing route passes through 5 districts. The following is greenfield route except where upgrade to existing route is mentioned.

Inter-connectivity

Following either interconnect or provide the alternate connectivity:

Current Status

  • Ludhiana–Bathinda Expressway: 75 km greenfield expressway likely to be completed by end 2026.
  • 2019: DPR completed.[https://themetrorailguy.com/nhai-ludhiana-bathinda-expressway-information-route-map-status/ Ludhiana – Bathinda Expressway – Information], accessed October 2024.
  • 2020 October: Land acquisition commenced.
  • 2021: 13 bids received.
  • 2022: Both Package-1 and Package-2 awarded to the contractors for the construction.
  • 2024 August: Ludhiana-Bathinda package-2, which was awarded on 9 November 2021, has also not started due to problems in land acquisition in Barnala and Bathinda districts.[https://www.hindustantimes.com/cities/chandigarh-news/land-acquisition-hurdles-puts-brakes-on-nhai-projects-101723573899778.html Land acquisition hurdles puts brakes on NHAI projects in Punjab], Hindustan Times, 13 Aug 2024.
  • Bathinda–Ajmer Expressway: 626 km greenfield expressway.[https://morth.nic.in/sites/default/files/PragatiKiNayiGati/pdf/rajasthan.pdf Rajasthan highway projects], accessed 23 Oct 2024.
  • 2024 October: Construction not yet commenced, completion date not yet announced.