Luoyang Subway

{{Short description|Metro system in Luoyang, Henan, China}}

{{Infobox Public transit

| name = Luoyang Subway

| image = Luoyang Subway logo.png

| imagesize = 150px

| image2 = 20231231 Trainset 0110 entering Hongshan Station 01.jpg

| imagesize2 = 275px

| caption2 = A Line 1 train

| locale = Luoyang, Henan Province, China

| transit_type = Rapid transit

| began_operation = {{Start date and age|2021|3|28|df=yes}}

| ended_operation =

| system_length = 43.5 km

| stations = 33

| lines = 2

| rolling stock = CRRC ZhuZhou Type-B Trains

| vehicles = Line 1: 114 cars; 19 trains.

Line 2: Unknown

| website = {{url|http://www.lysubway.com.cn/|www.lysubway.com.cn}}

| daily_ridership = 515,000 (Max 31.12.2023){{cite web | url=https://weibo.com/u/2728041997 | title=Sina Visitor System }}

| annual_ridership = 57.4 Million (2023){{cite web | url=https://weibo.com/u/2728041997 | title=Sina Visitor System }}

| track_gauge = {{RailGauge|sg}} (standard gauge)

| reporting marks =

| operator = Luoyang Subway Co., Ltd.

| owner = Luoyang Municipal People's Government

| map = 250px

| map_state = collapsed

| line_number = Line 1 (East-West Line), Line 2 (North-South Line)

| top_speed = 80km/h

| headway = Line 1: Normal hours: 8-10 Min; Rush Hours: Possibly 4-6 Min

Line 2: Normal hours: 7-10 Min; Rush Hours: Possibly 5-7 Min

| train_length = 6 coaches

| average_speed = 60km/h

| native_name = 洛阳地铁(Simplified) 洛陽地鐵(Traditional)

}}

{{Chinese

| script-website = zh:

| language = zh

| script-title = zh:Luoyang Subway

| s = 洛阳地铁

| t = 洛陽地鐵

| p = Luòyáng Dìtiě

}}

Luoyang Subway ({{zh|s=洛阳地铁|p=Luòyáng Dìtiě}}) is a metro network serving urban and suburban districts of Luoyang. It is the second metro system in Henan Province, as well as the first metro system in a city that is not a provincial capital in central and western China.{{Cite news |date=2016-08-26 |script-title=zh:洛阳也要修地铁 成中西部首个建地铁的非省会城市 |language=zh-cn |url=http://news.163.com/16/0826/07/BVCM0I8900014AEE.html |url-status=live |access-date=2018-09-11 |archive-url=https://web.archive.org/web/20180911225215/http://news.163.com/16/0826/07/BVCM0I8900014AEE.html |archive-date=2018-09-11 |script-website=zh:网易新闻}}

Lines

class="wikitable sortable" style="cell-padding:1.5; font-size:100%; text-align:center;"

| colspan="6" bgcolor="#fff" |File:System Map of Luoyang Metro.png

data-sort-type="text"style="width:100px;"|Line

! class="unsortable" colspan="2" style="width:400px; line-height:1.05"|Terminals
(District)

! Commencement

! style="line-height:2"| Length
km

! style="line-height:2"| Stations

style="text-align:center; line-height:1.05"| {{RouteBox|1|Line 1 (Luoyang Subway)|#{{rcr|Luoyang Subway|1}}}}

|style="text-align:center; width:225px; line-height:1.05"| {{stl|Luoyang Subway|Hongshan}}
(Xigong)

|style="text-align:center; width:225px; line-height:1.05"| {{stl|Luoyang Subway|Yangwan}}
(Luolong)

|style="text-align:center; line-height:1.05"| 28 March 2021

|style="text-align:center; line-height:1.05"| 25.342

|style="text-align:center; line-height:1.05"| 19

style="text-align:center; line-height:1.05"| {{RouteBox|2|Line 2 (Luoyang Subway)|#{{rcr|Luoyang Subway|2}}}}

|style="text-align:center; width:225px; line-height:1.05"| {{stl|Luoyang Subway|Erqiao Road}}
(Laocheng)

|style="text-align:center; width:225px; line-height:1.05"| {{stl|Luoyang Subway|Balitang}}
(Luolong)

|style="text-align:center; line-height:1.05"| 26 December 2021

|style="text-align:center; line-height:1.05"| 18.216

|style="text-align:center; line-height:1.05"| 15

=Line 1=

{{main|Line 1 (Luoyang Subway)}}

Line 1 is an east-west line from Yángwān station to Hóngshān station. It began construction in June 2017. It was opened on 28 March 2021.{{Cite news |date=2021-03-26 |script-title=zh:官宣!洛阳地铁1号线3月28日开通 中西部非省会城市第一个 |language=zh |url=http://news.lyd.com.cn/system/2021/03/26/031994407.shtml |url-status=live |access-date=2021-03-26 |archive-url=https://web.archive.org/web/20210327122759/http://news.lyd.com.cn/system/2021/03/26/031994407.shtml |archive-date=2021-03-27 |script-work=zh:洛阳网新闻}} Line 1 is {{convert|25.3|km}} in length with 19 stations.{{Cite news |date=2021-03-18 |script-title=zh:运营前最后一次 “大考” !洛阳地铁1号线当 “考生” |language=zh |url=http://www.lyd.com.cn/news/system/2021/03/18/031987918.shtml |url-status=live |access-date=2021-03-19 |archive-url=https://web.archive.org/web/20210319051507/http://www.lyd.com.cn/news/system/2021/03/18/031987918.shtml |archive-date=2021-03-19 |script-website=zh:洛阳网新闻}}

=Line 2=

{{main|Line 2 (Luoyang Subway)}}

Line 2 is a north–south line from Erqiao Road station to Balitang station. It began construction in December 2017.{{Cite news |date=2017-12-27 |script-title=zh:洛阳地铁2号线开建 全长18公里设站15座 |language=zh |url=https://ly.leju.com/news/2017-12-27/08306351579719506664193.shtml |url-status=}}{{deadlink|date=September 2023}} It connects both Luoyang railway station and Luoyang Longmen railway station. The first phase of Line 2 is {{convert|18.216|km}} in length with 15 stations.{{cite web|url=http://lyrb.lyd.com.cn/html2/2021-12/24/content_288506.htm|title=双线交会解放路"十字地铁"贯洛城}} The line opened on December 26, 2021.

History

The first phase of the system, including Line 1 and the first phase of Line 2, was approved by the National Development and Reform Commission in August 2016.{{Cite web |script-title=zh:洛阳市轨道交通项目概况 |url=http://www.lysubway.com.cn/jianshe/view/30.html |url-status=dead |archive-url=https://web.archive.org/web/20180825010716/http://www.lysubway.com.cn/jianshe/view/30.html |archive-date=2018-08-25 |access-date=2018-09-11 |language=zh-cn |script-website=zh:洛阳轨道}}

Construction of Line 1 started on 28 June 2017,{{Cite news |date=2017-06-28 |script-title=zh:洛阳地铁1号线开工仪式在牡丹广场站举行 |language=zh-cn |url=http://news.lyd.com.cn/system/2017/06/28/030314477.shtml |url-status=live |access-date=2018-09-11 |archive-url=https://web.archive.org/web/20190308184443/http://news.lyd.com.cn/system/2017/06/28/030314477.shtml |archive-date=2019-03-08 |script-website=zh:洛阳网新闻}} and Line 2 on 26 December 2017.

{{Clear}}

Network map

{{Rapid transit OSM map

| system_qid = Q11146236

| frame-lat = 34.6

| frame-long = 112.4

| frame-width = 750

| frame-height = 470

| zoom = 11

| length = yes

}}

References